Search Documents

  • SME
    El Abra: World’s Largest SX/EW Mine on Track to Join Copper Mining Elite

    By Robin J. Hickson

    El Abra is one of the world’s premier copper de-posits. The project is located in northern Chile, 140 km (87 miles) inland from the Pacific coast. It has the same geologic age and structural setting

    Jan 1, 1996

  • SAIMM
    A zero-one integer programming model for open pit mining sequences - Synopsis

    By J. Gholamnejad

    The aim of short-term production scheduling is to decide which blocks of ore and waste to mine in which time period (shift, days, weeks or months) so that several operational and geometrical constrain

    Jan 1, 2008

  • SAIMM
    The Transformation Of Ferrochromium Smelting Technologies During The Last Decades (3844a56b-bacc-4d72-9cf3-15ee7bf5e6c1)

    By J. Daavittila

    In the latter part of the 1980s Outokumpu Chrome in Tornio, Finland, was in a situation when its twenty-year-old ferrochrome plant was becoming too inefficient to sustain economically sound production

    Jan 1, 2004

  • CIM
    Balancing and Estimating the Ore Mineral Contents from Daily Production Samples

    By Maryam Sadeghi, Jonathan Roy, Claude Bazin

    "The operation of mineral processing equipments is intimately related to the mineral composition of the ore. However unit performances are usually characterized in terms of metal contents or recoverie

    Jan 1, 2016

  • TMS
    Laboratory Research On Reducing-Matting Smelting Of Jamesonite Concentrate

    By Tang Chaoho

    Laboratory research on the reducing and matte smelting of Jamesonite concentrate has been carried out. The influence of the process conditions such as the smelting temperature, the amount of pyrite ci

    Jan 1, 2003

  • TMS
    Laboratory Research On Reducing-Matting Smelting Of Jamesonite Concentrate (45205e00-51f7-4ff3-875a-63e7afc2fe36)

    By Tang Chaoho

    Laboratory research on the reducing and matte smelting of Jamesonite concentrate has been carried out. The influence of the process conditions such as the smelting temperature, the amount of pyrite ci

    Jan 1, 2003

  • NIOSH
    RI 5244 Physical Properties Of Mine Rock, Part IV - Including Indexes To Parts I. II. III. And IV - Summary

    By B. E. Blair

    The physical properties and related geological and petrographic data for 81 rock types obtained from operating mines or selected test sites are presented in this report. Most of these rock data were o

    Jan 1, 1956

  • NIOSH
    OFR-49-82 Innovative Techniques In Trolley Line Power Distribution

    By B. Gillenwater

    This report describes the results of investigations into four specific areas related to trolley wire power distribution systems in coal mines. These are: 1. Partially insulated (shielded) trolley w

    Jan 1, 1981

  • SAIMM
    The development of techniques to predict and manage the impact of surface subsidence

    COALTECH 2020 initiated a research project to provide the coal mining industry with a modelling tool to determine the expected types of subsidence, risks and the investment required in post-closure fu

    Jan 1, 2003

  • NIOSH
    RI 4752 Contribution To The Metallurgy Of Chromium

    By W. J. Kroll

    This investigation was undertaken with the idea of studying a number of unconventional methods for making chromium to determine whether production cost could be lowered and to discuss some of the more

    Jan 1, 1950

  • AUSIMM
    Compositional Variation and Distribution of Au-Ag-Hg and Au-Ag Alloy Subtypes in Nokomai and Nevis Valley Placers, New Zealand, and their Implications for Gold Sources

    By D Craw, L C. Kerr, P Wopereis

    Gold placers in the Nokomai and Nevis valleys are dominantly Quaternary in age. They occur mainly in western tributaries of the upper Nevis, eastern tributaries of the middle and upper Nokomai, and in

    Jan 1, 2000

  • SAIMM
    Ventilation Strategies To Meet Future Needs Of The South African Platinum Industry (64ed4cdf-d020-42f9-8bd5-078f2810120b)

    This paper provides an overview of possible approaches for structuring the ventilation systems for mines that will become operational within the next decade. Features addressed in the paper include: a

    Jan 1, 2007

  • SAIMM
    A New Methodology For The Analysis Of The Relationship Between Rock Brittleness Index And Drag Pick Cutting Efficiency

    By R. M. Goktan

    Rock brittleness plays an important role in the cutting action of picks on rock surfaces. It controls the ease with which cracks can propagate through the rocks. Although rock brittleness is known as

    Jan 1, 2005

  • IIMP
    Algunas pautas para reducir costos de energía eléctrica en operaciones mineras

    By Carlos Santa Cruz

    El presente trabajo refiere los fundamentos teóricos de algunas técnicas de conservación de energía eléctrica dentro de una operación minera como aquellas de control de demanda eléctrica, corrección d

    Aug 26, 1988

  • NIOSH
    Behavior of Nitrogen Oxides in the Product Gases from Explosive Detonations

    By Richard J. Mainiero, Michael J. Sapko, James H. Rowland III, Marcia L. Harris

    All explosive materials produce a cloud of reaction products, the most toxic of which is nitrogen dioxide (NO2). In the study reported here, 4.5-kg (10-lb) charges of blasting agent confined in either

  • SME
    Pit Lake Water Quality In The Western U.S.: Unifying Concepts

    By A. Davis

    Pit lake chemistry depends on the lithology and hydrologic characteristics of the ultimate pit surface, the availability of buffering capacity in the wall rock versus oxidizable sulfide content, and t

    Jan 1, 1996

  • NIOSH
    Coal-Pyrite Flotation: A Modified Technique Using Concentrated Second-Stage Pulp

    By Kenneth J. Miller

    The Bureau of Mines two-stage coal-pyrite flotation process was modified to provide a more concentrated final clean coal slurry underflow which could be dewatered economically by filtration or centrif

    Jan 1, 1975

  • SME
    Repairs and Modifications to the Providence Water 2.3 m ID Scituate Aqueduct and Tunnel

    By David Belknap, Clay Haynes, David Egger

    Rehabilitation challenges were met nearly two months ahead of contract schedule for the Design-Build, Fast Track Scituate Aqueduct & Tunnel project in Cranston, Rhode Island. The aqueduct and tunnel w

    Jan 1, 2005

  • AUSIMM
    Seismic Reflection Mapping of the Winton Basin, Southland

    The Winton Basin

    Jan 1, 1992

  • AUSIMM
    The Removal of Zinc from Lead Slag by Sulfation and Chlorination

    By G C. Bolton

    Experiments were conducted to access the feasibility of removing zinc from lead slag by sulfation or chlorination or both. Gaseous sulfation with sulfur dioxide and oxygen released only 50 per cent of

    Jan 1, 1980