Search Documents

  • SME
    Modeling A Small Laboratory Cold-Trap Experiment

    By R. W. Fedors, S. T. Green, R. A. Hart, D. B. Walter

    Computational fluid dynamic (CFD) modeling of a potential nuclear waste repository drift may be an important tool to estimate moisture redistribution caused by natural convection within the drift. To

    Jan 1, 2004

  • IIMP
    “Implementación de la Seguridad Basada en el Comportamiento en una empresa de la gran minería: caso de Southern Peru”

    By Jorge Medina Rodríguez

    La implementación de un proceso de Seguridad Basado en el Comportamiento (SBC) comenzó en junio de 2015 a través de las tres Unidades Económicas Administrativas (UEA´s) de Southern Peru Copper Corpora

    Sep 1, 2017

  • NIOSH
    RI 4912 Soda Sinter Process For Treating Low-Grade Titaniferous Ores

    By Robert T. MacMillan

    A process has been developed in the laboratory and expanded to semi-pilot-plant scale for recovering titania, iron, and byproducts from two types of titaniferous iron ores. A reducing roast with coke

    Jan 1, 1952

  • AIME
    The- Kaffir Mine-Laborer.

    By Thomas Lane Carter

    THE history of mining in South Africa differs somewhat from that of other countries in the part taken by the aborigines in the development ?of the mineral deposits. The Spaniards in America, and the f

    Nov 1, 1908

  • SME-ICGCM
    Automated Monitoring Of Rock Slopes And Waste Dumps

    By Andrew G. Martin

    In 1991, Modular Mining Systems began marketing a Slope Monitoring System (SMS) now installed at twelve mines. The SMS uses automated wire line extensometers to monitor field conditions frequently. Ev

    Jan 1, 1996

  • NIOSH
    Thermodynamic Properties Of Halides

    By L. B. Pankratz

    Thermodynamic data on the halides were reviewed, evaluated, and compiled at the Bureau of Mines Albany Research Center. Values for Cp°, S°, H-H°298, -(G°-H°298)/T, ?Hf°, ?Gf°, and log Kf are given in

    Jan 1, 1984

  • SME
    EPA’s EPCRA Assistance Visits: Getting Prepared (EPCRA Actually Consists Of Sections Other Than 313?)

    By K. Ward

    The Environmental Protection Agency (EPA) is beginning to provide compliance assistance visits to various industries, including mining, for Emergency Planning and Community Right-to-Know Act (EPCRA) c

    Jan 1, 2001

  • NIOSH
    Field Test With Strain-Gauged Friction Bolts At The Gold Hunter Mine, Mullan, Idaho, USA

    By Jeffrey Johnson, Carl Sunderman, Ted Williams, Stephen Signer, Douglas Bayer

    To measure the loading behavior of friction bolts, researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) installed strain gauges on the in

  • AIME
    Extractive Metallurgy Division - Kinetic and Equilibrium Studies of Redox Reactions in Liquid Bismuth

    By D. H. Gurinsky, D. G. Schweitzer

    The empirical equilibrium constantsd the heat of reaction for the reduction have been determined from 300° to 500°C. The mechanisms of the oxidation of uranium and magnesium fro

    Jan 1, 1962

  • SME
    Waste Dump Site Selection By Using Fuzzy Vikor

    By A. Yazadni-Chamzini

    Considering the nature of open pit mines, harvest volume, it usually is required to remove a lot of waste to access to mineral planned grade. So, one of the most important part of open pit mines desig

    Jan 1, 2012

  • AIME
    Cyclone Thickener Applications in the Coal Industry

    By M. G. Driessen, H. E. Criner

    Possible applications of cyclone thickeners for: (1) clarification of the washery water and, (2) recovery of fine coal from the plant bleed. The paper shows: (1) that it is possible to remove all part

    Jan 1, 1950

  • DFI
    Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall Construction

    By Robert Bachus, Jamey B. Rosen

    "Abstract Large scale In Situ Barrier Wall Construction projects, specifically those related to earth dams, dikes, and levees, frequently require stringent quality control measures to ensure the succe

    Jan 1, 2014

  • SME
    Steel-Fiber Reinforced Self-Compacting Concrete on the San Vicente Aqueduct Tunnel

    By C. D. Hebert, M. R. King

    The 56,000' (17 km) long San Vicente Aqueduct Pipeline tunnel is being constructed using precast concrete rings to act as preliminary ground support through two sections of the bored tunnel with

    Jan 1, 2007

  • IIMP
    Compañía Minera Milpo S.A.

    By Agustín Arias

    El presente artículo describe brevemente la historia, métodos de explotación, mecanización, energía eléctrica, las plantas de preconcentración y flotación y el consumo de reactivos de la compañía mine

    Nov 1, 1954

  • IIMP
    Indicadores geológicos para el monitoreo de estructuras de contención de relaves de minería basadas en el análisis de represas brasileñas

    By Noris Costa

    La posibilidad de construir presas hechas con los propios relaves que van a ser contenidos posteriormente, es una alternativa común en la minería. Sin embargo, durante el levantamiento histórico de es

    Sep 9, 2007

  • AUSIMM
    Electrum and Gold Fineness of Some Hauraki Epithermal Gold-Silver Deposits

    By G A. Challis, A B. Christiel

    Microprobe analyses of electrum grains in some Hauraki Au-Ag deposits indicate that gold fineness is in the range of 500 - 800 (50 - 80 per cent Au), but for most deposits the range is usually narrowe

    Jan 1, 1992

  • AUSIMM
    The Kiewa Hydro-Electric Scheme Special Reference to Tunnelling Operations

    By Knevitt L. T

    PART 1Details of Kiewa Scheme.Introduction.Topography.Preliminary Investigations.Geology.Description of Project.Details of Main Works.Main Transmission of Power.Construction Facilities.PART 2Undergrou

    Jan 1, 1950

  • DFI
    Wanapum Dam Repaired Using Post-Tensioning Anchors

    By Rick Deschamps, Brian Barkauskas, Aled Hughes, Abigail Stein

    In central Washington, six miles south of the small town of Vantage, the flow of the Columbia River is harnessed by the Wanapum Dam which is part of the Priest Rapids Hydroelectric Project owned and o

    Jan 1, 2018

  • SME
    Discussion - Performance evaluation of indicator kriging in a gold deposit

    By Y. C. Kim, I. S. Roditis, P. K. Medhi

    P. Mousset-Jones I found the article most interesting and timely. I consider it imperative that mine case studies like this one are undertaken and published so that the practicing mining engineer and

    Jan 3, 1988

  • SME
    Design and Risk Management Strategy for the Sound Transit Beacon Hill Station and Tunnels

    By Joseph Gildner, Donald J. Phelps, Jürgen Laubbichler, Christopher Tattersall, David McAllister

    The Beacon Hill Station and Tunnels portion of the Sound Transit Central Link Project consists of one mile of twin rapid transit tunnels, an underground station, portals and ancillary works constructe

    Jan 1, 2005