Search Documents

  • IIMP
    Angostura project. A High Sulfidation Gold Silver Deposit located in the Santander Complex of North Eastern Colombia.

    By Frederick Felder

    The paper point out the Angostura deposit is located in Colombia. The Angostura deposit, located within the Eastern Cordillera of Colombia is hosted by Triassic-Jurassic quartz monzonite and quartz di

    Apr 22, 2003

  • NIOSH
    MLA 36-86 - Mineral Resources Of The Kingston Range Study Area, San Bernardino County, California ? Summary

    By Arel B. McMahan

    The U.S. Bureau of Mines investigated 21 mines, prospects, and mineralized sites in and adjacent to a 38,713-acre portion of the 255,058-acre Kingston Range Wilderness Study Area in 1983. The study ar

    Jan 1, 1986

  • AIME
    Geology - Seasonal Variations in Copper Content of Stream Sediments in British Columbia

    By H. E. Hawkes, D. A. Barr

    Time variations in the copper content of the sediments of streams draining mineralized areas were studied in two areas of contrasting climatic environment, one in northern and one in southern British

    Jan 1, 1963

  • NIOSH
    RI 8508 Airblast Instrumentation and Measurement Techniques for Surface Mine Blasting

    By Virgil J. Stachura

    The Bureau of Mines has investigated techniques and instrumentation that measure accurately the airblast overpressures from surface mine blasting. The results include equivalencies between broadband r

    Jan 1, 1981

  • IOM3
    Coastal superquarry: design and proposed development of Rodel Quarry on South Harris, Outer Hebrides, Scotland

    By D. R. Wardrop, G. Walton

    Paper presented at the UK minerals industry conference held in Leeds, UK, 3-5 April 1995. A description is given of the approach that has been taken to the design of the 550 000 000 t superquarry with

    Jul 1, 1996

  • NIOSH
    OFR-32-75 Development Of A Simple, Rapid Analysis Method For Respirable Dust - Rapid Analysis Method For Respirable Dust

    The Federal Coal Mine Health and Safety Act of 1969 limits to 2 milligrams per cubic meter (for dust containing a maximum of 5% quartz) the average respirable dust concentration to which individual mi

    Jan 1, 1974

  • CIM
    Construction of prime coking coal washeries in India

    By Bali. D. D., S. Chattopadhyay

    "The planning and construction of prime coking coal beneficiation plants in the nationalized mines in India are reviewed. Flow schemes, construction practice, materials consumption, and costs are deta

    Jan 1, 1986

  • NIOSH
    OFR-34-89 Thin Wall Explosion -Proof Enclosures ? Final Report ? Executive Summary

    The works recorded in this Test Report have been performed by Rade Roncar - Electrotechnical Institute of Zagreb, SFR Yugoslavia in collaboration with Bureau of Mines. The main objective of these i

    Jan 1, 1987

  • IOM3
    Removal of copper from magnetite concentrates by chlorination

    Two concentrates from Palabora, in South Africa, containing 0.056-0.068% undesirable Cu and 0.8 or 2.2% Ti, were chlorinated with air:chlorine ratios of 10:1, 15:1 and 20:1 at temperatures between 1 2

    Jun 21, 1905

  • NIOSH
    IC 8765 Projects To Expand Fuel Sources In Eastern States - An Update Of Information Circular 8725 - Survey Of Planned Or Proposed Coal Mines, Coal And Noncoal Conversion Plants

    By David C. Benson

    This Bureau of Mines report is an update of IC 8725 and comprises tables listing the name, location, and other pertinent data concerning certain fuel-related projects. The tables include information o

    Jan 1, 1978

  • SAIMM
    Defect and mould variable prediction in continuous casting

    By I. K. Craig, F. R. Camisani-Calzolari

    Defects which occur at the surface of a continuously cast slab impede the throughput of final product, because an extra stage in the process is required to grind the defects away before further proces

    Jan 1, 2003

  • SME
    73rd Street TARP Relocation McCook Cup Reservoir: Contract 97-156-2H

    By Brent Duncan, Doug Harding, Bob Stier

    The 73rd Street Tunnel Project is part of “The Tunnel and Reservoir Plan” (TARP)also known as the Deep Tunnel Project, and is located in the Village of Bedford Park, County of McCook, State of Illinoi

    Jan 1, 2003

  • AUSIMM
    Valuation of Exploration Prospects - The Usefulness of Rating Methods

    This paper examines the issues involved in the technical audit and valuation of exploration prospects. Certain methodologies are more appropriate to use depending upon whether the mineral property val

    Jan 1, 1993

  • DFI
    Drivability Of Piles By Vibration

    By Don C. Warrington

    This paper is a survey of the various methods and research efforts by which the drivability of piles is determined. First, a brief outline of the basic theory and the important parameters for driving

    Jan 1, 1989

  • DFI
    Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality Control ? Introduction

    By Rudolph P. Frizzi

    Quality control is essential for augered cast-in-place (ACIP) piles (also known as continuous flight auger (CFA) piles outside the United States) and drilled displacement (DD) piles since the pile is

    Jan 1, 2004

  • NIOSH
    OFR-39-91-V1 Maintainability Design [Guidline For] Of Underground Mining Equipment: Volume I - Final Technical Report

    By E. J. (Kirk) Conway

    The objectives of this project were to: (1) determine the extent to which maintainability design concepts and principles have been applied to the design of underground coal mining equipment, (2) try t

    Jan 1, 1988

  • ABM
    Carvão Vegetal Como Aditivo Para Coqueificação: Estudo Da Reatividade Ao Co2

    By Bruno Deves Flores

    O presente trabalho tem como objetivo investigar a influência da adição de carvão vegetal e do seu tamanho de partícula na reatividade do coque. Para isso, um carvão vegetal de eucalipto foi adicionad

    Aug 1, 2018

  • SAIMM
    Support stability mechanism in a coal face with large angles in both strike and dip

    By X. Q. Cao, D. S. Zhang, L. Q. Ma

    To solve the support stability control problem for a coal face with large angles along both strike and dip (CLSD), the ’support-surrounding rock’ mechanical model has been developed, which takes into

    Jan 1, 2015

  • NIOSH
    OFR-97(1)-75 Quick Disconnect Couplers For Trailing Cables

    Three complete connector assemblies and six separate contacts were submitted to a series of tests to establish the connectors permissibility and compliance with U. S. Bureau of Mines research Contract

    Jan 1, 1974

  • TMS
    Operation And Improvements On Peirce-Smith Converters At The Tamano Smelter

    By S. Tanaka

    The Tamano Smelter of Hibi Kyodo Smelting Co. Ltd. was commissioned in 1972. Since start up, the anode production capacity has increased from 101,000 tpy to 290,000 tpy, as a result of the applicatio

    Jan 1, 2005