Search Documents

  • DFI
    Newfoundland Transshipment Project: Design-Build Construction Of Oil Tanker Wharf Using Permanent Steel Jackets. - Summary:

    By Alun J. Davies

    This paper describes a design-build project for the construction of a tanker wharf for 150,000 dwt vessels. The tankers deliver oil from offshore oil fields to a Transshipment terminal on the south co

    Jan 1, 2000

  • DFI
    Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering Techniques

    By Mazin Adnan

    The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e

    Jan 1, 2008

  • NIOSH
    IC 6320 Milling Methods And Costs At The Concentrator Of The Chief Consolidated Mining Co., Eureka, Utah ? Introduction

    By G. H. Wigton

    This paper, describing the concentrator practice of the Chief Consolidated Co., is one of a series being prepared by the United States Bureau of Mines. The concentrator adjoins the town of Eureka,

    Jan 1, 1930

  • CIM
    Innovations in Gold and Silver Recovery: World Overview

    By Hans von Michaelis

    "INTRODUCTIONThe renaissance in gold and silver recovery technology has continued to unfold and it is appropriate to review some of the useful new technologies as well as try to identify some of the i

    Jan 1, 1985

  • CIM
    Effect of Operating Variables in Knelson Concentrators: A Pilot-Scale Study

    By Sunil Koppalkar, A. R. Laplante

    "A Pilot Plant was installed in one of the grinding circuits of the Dome Mill, Ontario, Canada. Tests were conducted on a KCCD12 Knelson Concentrator to systematically analyze the effect of operating

    Jan 1, 2007

  • SME
    Slurry Shield Tunneling in Portland—West Side CSO Tunnel Project

    By James J. Kabat, James A. McDonald

    Impregilo/SA Healy JV recently completed this Project using the first slurry shield TBM’s in the United States. The Project used two TBM’s to mine 18,000 feet in sands, gravels, and silty alluvial mat

    Jan 1, 2007

  • NIOSH
    OFR-10-80 Evaluation Of Mine Parameters For Copper-Nickel Deposits For Northern Minnesota

    By C. M. St. John

    A series of analyses of possible mining excavations associated with the development of copper nickel deposits of the MINNAMAX site in Northeastern Minnesota is presented. Specific areas such as roof a

    Jan 1, 1979

  • NIOSH
    OFR-133A(2)-77 Longwall-Caving Mining Method For Thick Coal - Design And Feasibility Study - Final Report, Volume II

    By M. G. Wallis

    This report presents the results of a study to develop a detailed mining method design based on longwall mining with sublevel caving. The method is applicable to low-dipping coal seams 20 or more feet

    Jan 1, 1977

  • AUSIMM
    Flotation of Some Uranium Minerals

    The recovery by flotation of some complex uranium minerals such as brannerite and davidite is described. Anionic reagents used for flotation of iron and titanium oxides' are suitable. If care is

    Jan 1, 1955

  • NIOSH
    RI 7846 Effect of Specimen Volume on Apparent Tensile Strength of Three Igneous Rocks

    By Laxman S. Sundae

    A Bureau of Mines investigation was conducted to determine the effect of specimen volume on the apparent tensile strength of disks of St. Cloud Gray Granodiorite, Lithonia granite, and Rockville grani

    Jan 1, 1974

  • AIME
  • ISEE
    Planning to Demonstrate Why High PPVs Work for Close-In Blasting

    By Chris Breeds, Larry Leone, Jerry Wallace

    Project Owners typically require General and Detailed Blast Plans when blasting close to important structures and specify the maximum allowable peak particle velocity for each potentially affected str

    Jan 1, 2010

  • SAIMM
    Efficient Enhanced Gravity Recovery Of Zircon Using The Kelsey Centrifugal Jig

    By Wynand Erasmus, Terry A. Jones

    The Kelsey Centrifugal Jig (KCJ) utilizes the application of centrifugal force (and the resultant enhanced gravitational field) to conventional jigging technology principles to successfully process ma

  • AIME
    Coal - Characteristics of Coal Preparation Plant Slurries (Mining Engineering, Jan 1960, pg 49)

    By H. B. Charmbury, D. R. Mitchell

    Everyone in the coal industry from top management to the preparation engineer is vitally interterested in recovering as much salable coal as possible from the run-of-mine product. Coal losses from a p

    Jan 1, 1961

  • AUSIMM
    Blast Hole Diamond Drilling as Developed for Sub-Level Stoping at New Occidental Gold Mines, N.L., Cobar, N.S.W.

    By Creelman C. A

    With the technique and data obtained in using the blast hole diamond drill for "Removal of Horizontal Level Pillar by means of Blast Hole diamond drilling at New Occidental Gold Mines N.L.,"

    Jan 1, 1945

  • NIOSH
    RI 4246 Laboratory Study of the Hot-Water Process for Separating Hydrocarbons from Surface Deposits of Bituminous Sandstones near Edna, Calif.

    By R. V. Higgins, G. B. Shea

    "FOREWORDIn the second year of World War II, the petroleum industry in California was taxed to near capacity to satisfy the expanded war demand for petroleum products, particularly fuel oil. With disc

    Oct 1, 1948

  • CIM
    Sea Water Flotation

    By L. D. Haig

    "The Texada Mill is a unique iron operation producing High Grade sinter iron concentrate and a by-product copper, gold, silver concentrate. The plant is complex and extremely flexible to handle the ma

    Jan 1, 1974

  • SAIMM
    Auburn Furnace Services

    By R. S. McDonald

    Auburn began operations 40 years ago with an office in Sudbury, Ontario, Canada, to provide services to Inco Limited. Over the next 40 years, operations expanded considerably, with projects being und

    Jan 1, 2006

  • SME
    Timber Supported System – Introduction

    By George L. Wilhelm

    Timber support of mine openings continues to be an effective system for ground support, due to its avail¬ability, flexibility, and ease of installation. Timber support of mine openings as a primary m

    Jan 1, 1982

  • NIOSH
    RI 8248 Dust Control on a Longwall Face With a Shearer-Mounted Dust Collector

    By Natesa I. Jayaraman

    A field study was conducted by the Bureau of Mines to determine the feasibility and effectiveness of a secondary ventilation system retrofitted onto an Eickhoff EDW 340L double-drum shearer as a techn

    Jan 1, 1977