  • NIOSH
    OFR-72-76 Water Jet Chock Mounted Miner Feasibility Study ? Executive Summary

    The contract for the Water Jet Chock Mounted Miner Feasibility Study was awarded to FMC Corporation's Advanced Products Division on 18 November, 1974. The program was divided into four phases as

    Jan 1, 1975

  • NIOSH
    OFR-50-74 Air Curtain Respiratory Protection Device - 1 Introduction

    By T. G. Donnelly

    This final report summarizes the prototype development and testing of an air curtain respirotory protective device under Bureau of Mines Contract HO122087. The air curtain respiratory protective devic

    Jan 1, 1973

  • SAIMM
    The Design And Implementation Of The Top Of Block 4 (TOB 4)/Bop Resource At Finsch Mine (A Division Of Central Mines)

    By V. Mathebula

    Paper written on project work carried out in partial fulfilment of B. Tech (Mining Engineering) degree The purpose of this study is to establish whether to mine the Bottom of Pit (BOP)/TOB 4 reserv

    Jan 1, 2004

  • NIOSH
    OFR-144-84 Low-Profile Portable Crusher For Underground Mining Applications: Construction And Testing

    By H. Miller

    In recognition of the need for a portable low-profile hard rock crusher, the Bureau of Mines sponsored the development of such a unit capable of moving up as the face advances. By allowing primary ore

    Jan 1, 1983

  • NIOSH
    IC 9136 Survey Of Nuisance And Biologically Active Dusts In Metal And Nonmetal Mines

    By P. J. Watson

    The objective of this study was to prioritize the potential risks nuisance and biologically active dusts and fumes present in metal and nonmetal mines. This was accomplished by ranking numerical value

    Jan 1, 1987

  • SME
    Mineral Policy in Ireland

    By Anthony Leddin, Gillian Dooley

    This paper is concerned with mineral policy in Ireland and how it might be improved to encourage more exploration and investment in mining in the country. The approach is to first outline the main des

    Jan 1, 2005

  • SAIMM
    On the Reduction of Algorithmic Smoothing of Kriged Estimates

    Utilizing a very large database from a mined-out area on a South African gold mine, the relative efficacy of a method to mitigate the smoothing effect introduced by the algorithmic constraints imposed

    Jan 1, 2014

  • NIOSH
    IC 7731 Tungsten Potential In The San Juan Area, Ouray, San Juan, And San Miguel Counties, Colo. - Introduction And Summary

    By Carl Belser

    This report on tungsten in Ouray, San Juan, and San Miguel Counties, Colo., is one of a series describing results of studies on the tungsten potentialities in Region III, Bureau of Mines. The San Juan

    Jan 1, 1956

  • CIM
    Constancia Project Process Plant Design and Start Up

    By David Stephenson, Hugo Granados, Steven Klohn

    "HudBay’s Constancia project is a copper molybdenum concentrator located in southern Peru. In 2010 Ausenco was contracted to perform a feasibility study optimization review which resulted in an improv

    Jan 1, 2016

  • AUSIMM
    Underground Sampling. Methods at the Great Cobar Mines, Cobar, N.S.W.

    THE Great Cobar Company Limited owns 1100 acres of freehold, which include the Great Cobar Oopper Mine and smelters, the Cobar Gold Mine, the Cobar-Ohesney Copper Mine, and the Great Peak Gold Mines.O

    Jan 1, 1919

  • DFI
    A Proposal Of Calculation Of Piled Raft Foundations

    By Andrzej Tejchman

    Calculation of pile foundations should possibly truly reflect its real work, mainly with respect to the value and distribution of settlements, pile internal forces and bending moments within a slab. M

    Jan 1, 2002

  • SAIMM
    The Mechanism, Optimization And Effects Of Preconditioning

    By A. Z. Toper

    This is a sampling of the papers presented at the conference, the proceedings can be bought from the SAIMM An extensive research programme to address the issue of rockburst control has been underta

    Jan 1, 2000

  • NIOSH
    OFR-95-79 The Design And Demonstration Of A Longwall Illumination System

    By A. E. Ketler

    A second generation lighting system was installed in the Greenwich Collieries longwall. This report describes the hardware, installation, maintenance, and final results of the program.

    Jan 1, 1978

  • SME
    Review of Issues Related to Cerchar Abrasivity Testing and Their Implications on Geotechnical Investigations and Cutter Cost Estimates

    By Jamal Rostami, Levent Ozdemir, Amund Bruland, Filip Dahl

    Cerchar Abrasivity Index (CAI) is one of the commonly used tests to evaluate rock abrasiveness for cutter life/cost estimations of TBM projects. There are at least 3 style machines, 2 different pin ha

    Jan 1, 2005

  • DFI
    Building Above And Excavating Below An Iconic Building In Manhattan

    By John S. Civetta, Seth Martin, Marc J. Gallagher, Arthur J. Alzamora, Ronald Peralta

    The Crown Building, built circa 1921, is a 26-story iconic building located at West 57th Street and Fifth Avenue in the heart of Manhattan. The paper highlights collaboration between the geotechnical

  • DFI
    Augered Cast-In-Place Pile Manual (Model Specification with Commentary)

    "Guideline Augered Cast-In-Place (ACIP) Pile Specification and Commentary11.0 GENERAL1.1 SCOPEThe Pile Contractor shall furnish all labor, materials, tools and equipment necessary for furnishing, inst

    Jan 1, 2016

  • SME
    Integrating Hydro-Fracturing Technology And Geophysics Into 3d Mapping And Extraction Of Metals In Heap Leaching; Hydro-Jex And High Resolution Resistivity ?.

    By Seal. Thom

    Large heap leach operations around the world contain significant under-leached metal values that present recovery challenges to operators. The first challenge is to find the location of the highest

    Jan 1, 2008

  • AUSIMM
    Laser Ablation Inductively Coupled Plasma Mass Spectrometry Study on Fluid Inclusions of the Baiyinnuo’er Skarn Zn-Pb Deposit, North-east China

    By J-M Huizenga, Q Shu, Y Lai, J Hammerli

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Baiyinnuo’er Zn-Pb deposit is a typical skarn deposit in NE China. Skarn and orebodies

    Mar 18, 2015

  • SME
    Raleigh-Durham International Airport, Westside Storm Water Management Facility Project

    By L. M. Lenahan, J. D. Sheets

    INTRODUCTION The Raleigh-Durham International Airport (RDU) in North Carolina is the fourth largest airport in the southeast region of the United States. The Raleigh-Durham Airport Authority is cur

    Jan 1, 2005

  • ISEE
    Experimental and Computational Investigation of the Fundamental Mechanisms of Cratering (c03a8e57-961a-42b6-9348-3dd891fa944e)

    By B Brown, P J. Hommert, B J. Thorne

    "Early attempts at estimation of stress wave damage in blasting by use of finite element analysis met with limited success due to numerical instabilities that prevented calculations from being carried

    Jan 1, 1990