Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Air Pollution Control System Upgrade At Tubatse FerrochromeBy Luthie Els, Chris Coetzee, Roedolf Koekemoer, Casper Els, Olof Vorster, Frank Fereday
Three electric arc furnaces (EAFs) were constructed by Union Carbide at Tubatse Ferrochrome (TFC) in1975. This plant was expanded to four furnaces at the East Plant in 1985 and the gas cleaning system
Jan 1, 2007
-
RI 5970 A Computer Program For Calculating Coordinates And Elevations Of Survey Stations Located By Intersection ? Summary And IntroductionBy F. L. Wideman
This report describes a computer program that is used for the calculation of the coordinates and elevations of subsidence survey pins located by intersection. This program was developed for the Federa
Jan 1, 1962
-
RI 5306 Preparation Characteristics Of Coal From Logan County, W. Va. - IntroductionBy J. W. Miller
An investigation was begun by the Bureau of Mines in 1948 to determine the preparation characteristics of American coals. Results of the investigation were planned to be reported on a county basis and
Jan 1, 1957
-
Institute of Metals Division - Microstructure of Iron-Sulfur AlloysBy Lawrence H. Van Vlack, Alfred S. Keh
The distribution of sulfur in iron was found to be dependent upon the time and temperature of the treatment as well as the chemical composition of the sulfide. With higher temperatures, the sulfide ph
Jan 1, 1957
-
RI 4401 Production Of Lightweight Concrete Aggregates From Clays, Shales, Slates, And Other MaterialsBy John E. Conley
The need for lightweight aggregate for use in concrete products ,and structures has caused the Bureau of Mines to undertake an investigation to determine the availability of suitable raw materials and
Jan 1, 1949
-
Desensitization and Malfunction of Cap-Sensitive Explosives and Delay Detonators (3c055ade-7146-4060-a860-4133718a0454)By Michael S. Wieland
This report focuses on the U.S. Bureau of Mines research regarding desensitization and malfunction of delay detonators and cap-sensitive explosives. Delay blasting in underground coal generates tremen
Jan 1, 1992
-
A Study of Roof Caving in the Eastern U.S. CoalfieldsAppropriate roof control is the most important requirement in underground coal mining and, in the case of longwall panels or second mining in room and pillar extractions, this can be simply expressed
Jan 1, 1986
-
RI 9348 - Laboratory Determination of Signature Criteria for Locating and Monitoring Abandoned Mine FiresBy Ann G. Kim
The U.S. Bureau of Mines mine fIre diagnostic methodology to locate and monitor fIres in abandoned mines and waste banks is based on the controlled sampling of the mine atmosphere to determine changes
Jan 1, 1991
-
Journal: 100 Years / THE ENGINEERING AND MINING JOURNAL New York July 27, 1907 / Shot-firers, and Evils of Solid ShootingBy George Harrison
A great many labor leaders and others advocate shot-firers as the acme of relief for all the dangers connected with solid shooting, and where large quantities of powder are used in one blast in coal m
Jan 1, 2008
-
Velocity of detonation of Non-Ideal explosives: investigating the influence of confinementThe VoD of non-ideal explosives depends on the charge diameter and the thickness, strength and sound velocity of the confiner. VoD measurements are made to evaluate explosives for development, quality
Jan 1, 2007
-
Clay Veins: Their Physical Characteristics. Prediction, and SupportBy Frank E. Chase
Clay veins, also referred to as clay elastic dikes, have been responsible for numerous underground injuries and fatalities. These hazardous structures are also responsible for increased production cos
Jan 1, 1984
-
Institute of Metals Division - The Effect of Solute on the Mechanism of Grain GrowthBy W. C. Winegard, A. Galibois, C. J. Beingessner
The effects of solutes on the distribution of two-dimensional configurations of grains in zone-refined tin have been studied. When solutes with partition coefficients (ko) greater than unity are added
Jan 1, 1965
-
Information Strategy Planning on Nuclear Power Plant Project Management SystemBy Son Hye Jin
Abstract ? KHNP is participating in the construction of Nuclear Power Plant both in Korea and UAE. ? We want to improve our construction project management process. ? So we are now developing the
Aug 1, 2013
-
Characterising the mineralogy of iron ore sinters – state-of-the-art in AustraliaBy L Matthews, D O’Dea, P C Hayes, J Manuel, B Monaghan, T Honeyands, D Pinson, J Leedham
Many different approaches have been used in the past to characterise iron ore sinter mineralogy to predict sinter quality and elucidate the impacts of iron ore characteristics and process variables on
Jul 24, 2017
-
IC 8125 Mica - A Materials Survey - Introduction And SummaryBy Milford L. Skow
MICA is a group name for a number of complex hydrous aluminum silicate minerals that have a sheet or platy structure and extremely variable and complex compositions containing various metallic ions, p
Jan 1, 1962
-
Development of Cyanide Leaching Processs For Small High Grade Gold and Silver DepositsBy Michael Harris, David Mosch
The numerous small high grade gold and silver deposits of the Front Range Mineral Belt have been uneconomical because of the high costs of mill construction, transportation, and smeltering. Processing
Jan 1, 1987
-
The IPMI Journal 2020By IPMI Educational and Scientific Foundation
It is with great pleasure that we announce the availability of this fourth issue of the IPMI Journal, a publication of the International Precious Metals Educational and Scientific Foundation. This dig
Dec 1, 2020
-
OFR-3(1)-75 Design And Development Of Protective Canopies For Underground Low Coal Electric Face Equipment, Including Shuttle CarsBy R. Farrar
Protective canopies for conventional electric face equipment, including shuttle cars, operating in low coal (less than 48 inches) were designed, fabricated, installed and evaluated on in-mine machines
Jan 1, 2012
-
Aplicación de relleno hidraúlico con mezcla de cemento en las minas de Cerro de Pasco y MorocochaBy A. León
El objetivo del presente trabajo es describir el sistema de relleno hidraúlico en los tajeos de vetas angostas de la mina de Morococha a través del método "Arch Back". Actualmente el sistema de rellen
Nov 20, 1972
-
Comparison Of Predictions And Measurements Of Subsidence Caused By Underground Mining In Northern AppalachiaBy H. J. Siriwardane
This paper presents results from three case studies involving longwall mine panels at which the measured ground movements were compared with the numerical model predictions based on the finite element
Jan 1, 1988