  • CIM
    Managing pit slope displacements: Highland Valley Copper’s Lornex pit southwest wall (f470f4fd-a370-4a43-8de1-ec8dbdd94f5c)

    By C. S. Maggs, L. Shwydiuk, H. W. Newcomen

    The southwest wall of the Lornex Pit at the Highland Valley Copper mine has been experiencing slope displacements since 1978. Measures to manage the displacements on previous pushbacks have included s

    Jan 1, 2003

  • SAIMM
    Copper losses to slags obtained from the E1 Teniente process

    By M. Sanchez, I. Imris, G. Achurra

    The Smelting and Converting El Teniente Process for copper concentrates as well as Slag Cleaning Furnace Technologies to treat slags coming out from the El Teniente Furnaces are widely applied today i

    Jan 1, 2004

  • SAIMM
    Design And Operating Features Of New 27.6 Mva Furnace At Nava Bharat Ventures Limited, Paloncha

    By Y. Poornachandra Rao, P. C. Sudhakar, L. Malakondaiah

    NBV commissioned a 27.6 MVA furnace in the year 2005. This paper explains: a)Furnace design features b)Furnace process control, Direct slag granulation c)Continuous casting, Waste heat reco

    Jan 1, 2007

  • DFI
    Secant Pile Shoring - Developments In Design And Construction

    By Eric S. Lindquist

    High groundwater levels combined with variable soil and rock profiles present challenges to the design and construction of deep excavation support systems. Increasingly, secant piling techniques are t

    Jan 1, 2011

  • AUSIMM
    Multi and Synchroblasting – maximising operational productivity

    By G Wyartt

    Systems such as Davey Bickford’s Daveytronic® SP blast initiation system and electronic detonators have been an integral part of drill and blast activities in Australia for over a decade, with th

    Jul 24, 2017

  • SME
    The Importance Of Chemical And Mineralogical Data In Evaluating Apatitic Phosphate Ores

    By L. R. Gremillion

    Chemical and mineralogical data on 25 apatitic phosphate ores of diverse origins from commercial deposits around the world were widely variable. From 14 to 18 chemical constituents of each sample were

    Jan 1, 1978

  • TMS
    Study on A New Electrolysis Technology of Preparing High NB Bearing Tial Alloy From Metal Oxides

    By Fanke Meng

    Electrolyzing oxides of titanium, aluminum and niobium could prepare high-Nb bearing TiAl alloy (Ti-45Al-9Nb) at 1500°C. The chosen electrolysis voltage is 3.5V, which is lower than reducing voltage (

    Jan 1, 2009

  • CIM
    Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine

    By D Reddy Chinnasane

    Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations

    Oct 1, 2010

  • CIM
    Evaluation of the Effect of Mixing Method, Sequence and Time on the Properties of Gelfill

    By C. Doucet

    Since 2001, CANMET Mining and Mineral Sciences Laboratories (MMSL) have worked with Falconbridge Ltd. (now Xstrata Nickel) to evaluate trends in the strength development and water retention properties

    May 1, 2007

  • SME
    Geotechnical Conditions and TBM Selection for the Bay Tunnel

    By Luke Erickson

    San Francisco Public Utilities Commission is planning to replace 5 miles of pipeline under San Francisco Bay. The tunnel will be constructed using an Earth Pressure Balance (EPB) TBM and will be the f

    Jan 1, 2008

  • ISEE
    Determining the Quickest Way to Prepare a Dragline Pad Using i-PushTM Dozer Simulation Software

    By Stephen Chung, Graham Mustoe, Joe Haid

    In an open cast coal mining operation, a 305 m (1000 ft) long by 49 m (160 ft) thick overburden cast blast can produce more than a million cubic yards of broken muck that needs to be removed before th

    Jan 1, 2006

  • CIM
    Large Flotation Machine Development and Operation

    By M. Churchill, V. R. Degner

    "Over the past two decades, declining ore body grades, increased operating costs and increased construction costs have provided an incentive for the development of progressively larger flotation machi

    Jan 1, 1982

  • NIOSH
    RI 3331 Progress Reports - Metallurgical Division - 14. Annual Report Of The Metallurgical Division, Fiscal Year 1936 ? Copper Metallurgy Section

    By Dean. R. S.

    The work of the copper metallurgy section during the year was devoted to laboratory studies of sulphur recovery from smelter smoke and combination smelting of copper and manganese. Both of these subje

    Jan 1, 1937

  • IMPC
    Mongolian Fluorspar Ore Mining and Processing Rational Technological Schemes Development

    By ?. ?. Zimin, B. A. Kutlin, X. Baddamsuren

    "The ore features of Mongolian fluorspar deposits are shown in the paper. The possibilities of the technological of ore processing on the Bor-Undur combine scheme improvement are analyzed there. Some

    Jan 1, 2003

  • NIOSH
    Securing the Blast Site to Prevent Blasting Related Injuries

    By Thomas E. Lobb, Harry C. Verakis

    This article examines the factors related to injuries due to inadequate blasting shelters and blast area security, and identifies mitigation techniques. The key concepts are:(a) accurate determinatio

  • SAIMM
    Mould Powder Selection For Thin Slab Casting

    By J. A. Kromhout, J. Trouw, A. A. Kamperman, M. Kick

    Mould powders play an important role in the stability of the continuous casting process. The main functions of mould powders are to provide sufficient lubrication and to control the horizontal heat tr

    Jan 1, 2004

  • NIOSH
    RI 3579 Petroleum Engineering Study Of The Anahuac Field, Chambers County, Texas ? Introduction

    By Charles B. Carpenter

    [The Bureau of Mines selected Anahuac for a petroleum-engineering study because it is one of the notable fields of the Gulf Coast region. It is outstanding because the producing formation is very thic

    Jan 1, 1941

  • AUSIMM
    New Sampling Technologies for Ore Grade Control, Metallurgical Accounting, and Laboratory Preparation

    The optimisation of a mining operation requires precise ore grade control, metallurgical accounting, and laboratory sampling protocols, which are implemented by using accurate and flawless sampling sy

    Jan 1, 2004

  • NIOSH
    RI 3579 Petroleum Engineering Study Of The Anahuac Field, Chambers County, Texas ? Introduction (cfd55801-3bf2-4a9b-9ffc-7b04c04e59cf)

    By Charles B. Carpenter

    [The Bureau of Mines selected Anahuac for a petroleum-engineering study because it is one of the notable fields of the Gulf Coast region. It is outstanding because the producing for is very thick; eve

    Jan 1, 1941

  • SAIMM
    The Role Of Metallurgy In Enhancing Beneficiation In The South African Mining Industry

    By M. Dworzanowski

    Beneficiation, in the context of this paper, has two distinct definitions. From an economic perspective, beneficiation relates to adding value to a mined raw material. From a metallurgy perspective, b

    Sep 1, 2013