Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Channel Iron Deposits - A Major New District Around the Caliwingina Creek, Central Hamersley Ranges,Western AustraliaBy T Gill, A Faragher, B Scott, V Kakebeeke
In 2000, after six year intensive exploration for high-grade haematite deposits, Rio Tinto included the channel iron deposits (CID) as a specific iron ore target in the Hamersley Province iron ore exp
Jan 1, 2009
-
Reduction of Mechanical Entrainment by Polymer DepressantsBy Y Peng, D Wannas
In the fine particle flotation technologies being developed today the fine hydrophilic (gangue) particles are usually well dispersed. These highly dispersed fine particles can be recovered into the fl
Jan 1, 2005
-
Wallaby - The Horizontally Challenged OpportunityBarrick Gold Granny Smith Mine is currently undergoing conversion from an open cut operation to an underground mine at the Wallaby deposit. The underground project commenced in 2005 with the developme
Jan 1, 2008
-
Reducing the Effect of Wind on Airblast Measurement During BlastingBy K Henley
One of the greatest practical difficulties of measuring airblast occurs when a significant wind is blowing onto the microphone. Small windscreens are usually used to mitigate the wind noise on the mic
Aug 24, 2015
-
Vivien Mine modelling back analysis to forecast ground conditions and ground supportBy J Player, P Mikula, G Sweby
A numerical modelling back-analysis exercise was carried out at a WA gold mine at which early signs of seismicity (rock noise, scatts from active faces) were becoming apparent as depth of mining incre
Nov 29, 2022
-
Global Lessons for a Local Problem – Rehabilitation Bonds and Victoria’s Latrobe Valley CoalminesBy M L. Cramer, N P. Wines
"On 9 February 2014, bushfire embers landing on exposed coal in a disused pit at the Hazelwood mine in Victoria’s Latrobe Valley ignited a coal fire that burned for 45 days. The fire was the largest a
Jun 28, 2016
-
Computer Assisted Ore Reserve Calculations at Western Mining Corporation Ltd's Kambalda Nickel OperationsBy Reichman J. P
Extensive use is made of a small scale computer (IBM 1130), in the calculations of ore reserves for Western Mining Corporation's nickel mine at Kambalda, W.A. All surface drilling data such a
Jan 1, 1973
-
Alternative Access, Mining and Hoisting for Underground DepositsIt is proposed to consider a new access, mining and hoisting system for underground deposits, as an alternative to the commonly used decline or vertical shaft access. The proposed system offers fundam
Jan 1, 2000
-
Comparison of One Stage and Two Stage Classification ù A Case StudyBy M N. Mian
The Cayeli volcanogenic massive sulphide deposit is located in Black Sea region of Turkey. Cayeli Bakir Isletmeleri (CBI) was formed as a joint venture between Inmet (Canada) and Eti Holding (Turkey).
Jan 1, 2003
-
Reducing the environmental and economic cost of metal extraction by optimal blast designBy A Tsang, D La Rosa, L Julian, W Hunt, R Pratama
Mineral extraction is facing the twin challenges of finite resources and increasing environmental and economic costs. Society’s growth is matched by an increase in demand for the earth’s resources. It
Sep 1, 2024
-
A Simplified Creep Analysis for Low Strength Seams in Rock PillarsBy M Habte
This paper presents a simplified method for the assessment of creep deformations in rock masses containing bands of low strength or soil strength rock. The main impetus for this work was the need to a
Mar 8, 2011
-
Strategic thinking about long-term ‘above ground’ orebody complexity using scenariosBy T Craske, J Sykes, T C. McCuaig, M Jessell, A Trench
The prevalent strategic approach in the mining industry is one of planning. However, it is widely recognised that planning does not work in complex and uncertain situations (Mintzberg, 1994), such as
Nov 21, 2018
-
Conducting comprehensive evaluations of preconcentration optionsBy P Holtham, K Duffy, B, W Valery, E Tabosa, rade
Pre-concentration has potential to significantly improve Mineral Resource efficiency by removing gangue early in the process, before energy intensive and expensive comminution and fine processing. How
Nov 10, 2020
-
Progress towards Data-driven Mine Planning via a Virtual Geometallurgical LaboratoryBy E Vargas, A Egana, M Alarcon, X Emery, A Barberan, A Lopez, N Morales, C Friedrich
"As the cost in time and money of data from sensors and small-scale tests has reduced, additional challenges have arisen. Although many mine data sets are not big relative to those in other discipline
Jun 15, 2016
-
Processing of Magnetite Iron Ores - Comparing Grinding OptionsBy A Jankovic, D David, P Payne
Although the majority of current steel production is supported by iron ore sourced from high-grade haematite deposits, the long-term growing demand for steel has led to higher raw material prices and
Jan 1, 2009
-
Impurity capacities of non-ferrous slagsBy R G. Reddy
The complexity in treating environmentally harmful impurities such as As, Sb, Bi from the base metal matte or metal in the smelting stage are responsible for the high cost of the refining process. The
Aug 21, 2024
-
Is a 2.5áper cent Success Rate Good Enough? Traditional Mine Development Methods have the Tail Wagging the DogBy J Jackson, D C. Curry, A C. Keith
Australian Bureau of Statistics (ABS) data shows that since 2006 the balance of capital costs associated with mine development has become weighted greater than 75 per cent to enabling infrastructure a
Sep 29, 2013
-
Structural Controls and Strain Partitioning in the Red October Gold Mine, Western AustraliaBy D Howe, J Conn, J G. McLellan, K Gates
The Red October Gold Mine, owned by Saracen Gold Mines Pty Ltd, is located approximately 80 km south of Laverton, Western Australia. It is considered to be of a similar nature to many of the Archaean
Aug 18, 2014
-
An Integrated Economics Model for In Situ Resource Utilisation in Support of a Mars ColonyBy C Tapia Cortez, A G. Dempster, R Fradet, S Saydam, T de Roche, R Shishko, J Coulton
Human ventures into space are entering a new phase in which missions formerly driven by government agencies are now being replaced by those led by commercial enterprises – in launch, satellite deploym
Nov 4, 2015
-
Metal cap versus steel lining system at Philsaga Mining Corporation’s Ø6100 mm SAG millBy N S. Weerasekara, S Town, E Lessing, J A. De Torres
Philsaga Mining Corporation (Philsaga) had three main aims in converting their lining system from steel to metal cap. They wanted to increase mill availability, minimise localised high wear and optimi
Aug 29, 2018