Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Slope stability is a critical issue for the open pit mining community

    By M Edgar, G Pattemore, M Auad, K Job, A Job, S Gale

    In recent decades, significant advances have improved the modelling techniques for predicting slope failure. Predicting failures is vital in open pit mining due to the significant risk posed to person

    Jun 22, 2022

  • AUSIMM
    Mine Hoists for the Nickel Rim South Project

    By T Gartner

    This paper describes the design, manufacture and site services associated with the supply of mine hoists for the new mine under construction by Falconbridge Limited in Ontario, Canada. Two new shafts

    Jan 1, 2005

  • AUSIMM
    Assessment of Ecotoxicology and Health Risk from Bioaccumulation in Fish of Heavy Metals and Metalloids from Historical Mine Practices in the Leichhardt River, Queensland, Australia

    By T Huynh, V Matanitobua, J Zheng, B N. Noller, J C. Ng, H H. Harris

    A risk assessment was undertaken of the aquatic ecosystem and bioaccumulation of metals and metalloids in fish at the Leichhardt River, Mount Isa, Queensland. Residual contamination of metals and meta

    Jul 16, 2014

  • AUSIMM
    Long-term Monitoring and Targeted Assessments to Improve Management of Mine Wastes – the Batu Hijau Project

    By S L. Simpson, J Waworuntu, B M. Angel

    "The Batu Hijau copper/gold mine, operated by PT Newmont Nusa Tenggara, is located in the south-western part of Sumbawa Island, Indonesia, and is situated ~10 km from the south coast at an altitude of

    Jun 28, 2016

  • AUSIMM
    Embedding Geometallurgy into Mine Planning Practices – Practical Examples at Olympic Dam

    By H Bruyn, K Ehrig, V Liebezeit, A Robertson, M Smith, D Grant

    "The Olympic Dam geometallurgy program has generated a large quantity of data that has been used to create a geometallurgically enabled block model. An ongoing challenge is to convert data into usable

    Jun 15, 2016

  • AUSIMM
    Filtration Test Work – Extracting the Whole Story for Studies and Design

    By G Bickert

    Australia is currently developing and engineering a range of specialised processing options for rare earth (RE) (Lynas, 2011, Alkane, 2005), zirconia (Alkane, 2005), lithium (Galaxy Resources, 2008) a

    Aug 8, 2011

  • AUSIMM
    Ferroalloy extraction from a Zimbabwean chrome ore using a closed DC furnace

    By S Bright, M J. Masamvu, E K. Chiwandika, S Dandi, S M. Masuka

    The depletion of high-grade hard and lumpy chrome ores has forced Zimbabwean ferrochrome producers to resort to low-grade friable ores that have an average of 28 per cent fines against a set limit of

    Jun 19, 2024

  • AUSIMM
    Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mine

    By S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi

    Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine

    Aug 2, 2023

  • AUSIMM
    Effect of Al2O3/SiO2 ratio on structure and properties of mould flux for high-Al steel continuous casting

    By J Zhang, O Ostrovski, C Zhang D Cai, Q Wang

    The conventional CaO-SiO2-based mould fluxes are not suitable for high-Al steel casting because of the strong reaction between silica in the flux and aluminium in the steel strand. In the process of c

    Aug 21, 2024

  • AUSIMM
    Development of a remotely operated robotic mechanism for accessing and removal of metal tramp from primary gyratory crushers

    By H Lemos, E Nunes, D Jacobson, R Costa, L Ono, A Alves, H Delboni Jr

    Oversize rock breaking and metal tramp removal are key issues for reducing primary crusher downtime, as well as improving the safety associated with its operation. Remote operation of such tasks would

    Nov 8, 2021

  • AUSIMM
    Do We Maximise the Value of Our Operations through Our Definition Drilling, Resource Estimation and Mine Planning Strategies?

    By S O’Connell, M Scholz, A Robertson, M L. Bloss

    The value created in any mining operation is a function of the mine plan. The quality of this plan is dependent on the strategies employed during definition drilling, resource estimation and mine plan

    Jun 22, 2016

  • AUSIMM
    The Benefits of Using SmartEar™at Pueblo Viejo

    By D Shuen, R Sales, D La Rosa

    Semi-autogenous grinding (SAG) mill control is complex and depends on many dynamic process variables. Good control strategies ensure that a mill is operating as close to optimal as possible, resulting

    Sep 1, 2014

  • AUSIMM
    Geometallurgical Modelling and Ore Tracking at Kittilä Mine

    By M Wortley, J Korteniemi, D La Rosa, L Rajavuori

    Geometallurgical modelling of an orebody provides benefits to a mine by gaining a better understanding of the ore characteristics and how they affect the performance of the concentrator. With this kno

    Nov 24, 2014

  • AUSIMM
    Blast Fragmentation Impacts on Downstream Processing at Goldfields Cerro Corona

    By D La Rosa, K Caron, H Mamani, W Valery, R Diaz

    The Gold Fields Cerro Corona copper-gold deposit in Peru has heterogeneous rock characteristics in terms of its mineralogical, geological and geotechnical properties. Blast design variations in these

    Aug 24, 2015

  • AUSIMM
    Seam Gases in Major Australian Coalfields

    The major coalfields of Australia are almost unique in the occurrence in some areas of CO partly or almost completely replacing CH4,t1e normal seam gas from metamorphism of coal due to time and de

    Jan 1, 1986

  • AUSIMM
    Vaal Reefs Mine, South Africa, and the Role of the Geologist

    Vaal Reefs Mine annually produces some 75 tonnes of gold. Stoping operations, using a scattered mining method, are conducted on several reef horizons within Witwatersrand Supergroup metasediments of t

    Jan 1, 1990

  • AUSIMM
    The McArthur River Project (734176fa-ffb4-43c7-95c3-495d0f273632)

    The HYC mineral deposit at McArthur River is about 1.5 kilometres long by 1.0 kilometres wide and 55 metres thick, and contains 227 000 000 tonnes of ore of average grade 9.2% Zn, 4.1% Pb and 41 g/

    Jan 1, 1984

  • AUSIMM
    The Geology of the Eloise Copper-Gold, Deposit, NW Queensland, Australia

    By T. Baker

    The Eloise Cu-Au deposit is 60 km SE of Cloncurry in NW Queensland and has a current indicated reserve of 3.2 Mt @ 5.8 per cent Cu, 1.5gA Au and I9g/t Ag. It is hosted by metasediments and metabasic

    Jan 1, 1994

  • AUSIMM
    The Introduction and Application of Carbon-in-Pulp in a Heap Leach Project

    By Mann LD

    The Haveluck gold deposit, located 2.5km north of Meekatharra, contained 1,284,000 tonnes at an average grade of 1.8 g/t gold of drill delineated proved and probable ore prior to commencement of pro

    Jan 1, 1982

  • AUSIMM
    A Conceptual Framework to Understand the Local Community/Social Impacts of Mining

    By T G. Measham, D A. Fleming

    When attempting to understand potential regional or community socio-economic changes that resource-extraction industries may produce, it is important to analyse the channels that promote these changes

    Jun 28, 2016