Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Regeneration of 2-Naphthol from Cobalt Precipitate

    By Haigh C. J

    A process has been developed to recover at least 75% of the 2-naphthol contained in cobalt precipitate produced during the removal of cobalt from electrolytic zinc plant solution. The recovered mat

    Jan 1, 1977

  • AUSIMM
    Formation and Particle Size of Jarosite

    By Phipps P. J

    The rate of precipitation of ferric iron as ammonium jarosite, NH4.Fe3(SO4)2(0H)6 from acidic solutions near 100¦C, was found to increase with weight of jarosite seed crystals, and with concentrati

    Jan 1, 1977

  • AUSIMM
    Making Rectangular Tunnels with the Mobile Miner

    Throughout 1992 Pasminco conducted field trials of the Mobile Miner MM130 at Broken Hill. The goal was to develop the machine to achieve acceptable reliability and establish production rates.

    Jan 1, 1993

  • AUSIMM
    Prediction Of Gate Roadway Closure in Longwall Advance Mining

    By Unver B

    Longwall advance mining is still the predaninant system of coal extraction in the U.K., contribiiting to sane 70 % of underground coal production. Gate roadways providing access to a longwall adva

    Jan 1, 1986

  • AUSIMM
    The Increasing Acceptance of Fly-in/Fly-out Within the Australian Mining Industry

    By Wu H. W, Jones S. J

    Australia wide, over 40 fly-in/fly-out mining operations and other forms of long distance commuting now exist, with coverage of about 5000 employees. The substantial majority of these operations are

    Jan 1, 1997

  • AUSIMM
    Investigation into Cable Bolt Corrosion at Mt Whaleback Mine, Newman, Western Australia

    Cable bolts have been used extensively in the development of the footwall of the Mt Whaleback Mine as a part of the ground improvement program since 1986. High tensile seven wire stress relieved steel

    Jan 1, 1992

  • AUSIMM
    Maintaining and Improving the Economics of Open Pit Mining

    Maintaining and improving the economics of open pit mining in the future requires understanding of the characteristics of open pit mining that are different to other mining or business activities, des

    Jan 1, 1992

  • AUSIMM
    Gold, Silver and Base Metal Deposits of the Chillagoe District, Australia: Hypothermal to Epithermal Overprinting (33335b9b-7938-472c-8a61-62e4b140b295)

    By Nethery JE

    At the Red Dome and Mungana deposits in north Queensland, Australia, it is proposed that mineralisation and alteration developed as a "telescoped" overprinting continuum, ranging in style from hypoth

    Jan 1, 1995

  • AUSIMM
    GEMNet - Using Neural Networks to Approximate the Location-Grade Relationship in Mineral Deposits

    By Burnett C. C H

    GEMNet, (Grade Estimation using Mapping Networks), is a grade/reserve estimation software system that uses the artificial intelligence technique known as neural networks to perform reserve estimate

    Jan 1, 1995

  • AUSIMM
    Base and Metal Mineralisation in the Gympie Composite Terrane

    By Robertson A. D C, Cranfield L. C, Murray C. G

    Most base and precious metal mineralisation in the Gympie Province is genetically linked to intrusion of branitoids of Late Permian to Late Triassic age. Most lodes are hydrothermal quartz and quartz-

    Jan 1, 1990

  • AUSIMM
    Direct Leaching of Pb and Zn from Complex Sulphide Ore and Concentrate

    By Sharma T

    Laboratory investigations have been carried out on direct leaching of lead-zinc complex sulphide ore and zinc concentrate using ferric chloride. From the investigation it was observed that the use o

    Jan 1, 1992

  • AUSIMM
    Drilling Techniques for Investigation and Operation of Large Open Pit Coal Mines in the Latrobe Valley

    By Mountiney B

    The development and operation of three large open cut brown coal mines in the Latrobe Valley, Victoria, Australia, requires a wide range of drilling techniques for coal resource evaluation and strat

    Jan 1, 1989

  • AUSIMM
    Arc-Continent Collision in the Banda Arc: New Gravity Observations Integrated with Geological and Geophysical Data

    The Banda arc, a U-shaped orogenic belt which separates oceanic crust of the Banda Sea from continental crust underlying the Australian- New Guinea shelf, has been interpreted to mark the convergen

    Jan 1, 1987

  • AUSIMM
    Community Consultation for the Wimmera Industrial Minerals Project (WIM)

    Although a formal EES was not prepared for the WIM project due it winding down, CRA Ltd has been through the EES and planning scheme amendment process for its demonstration plant. Community consultati

    Jan 1, 1992

  • AUSIMM
    Learning from Nuclear Waste Repository Design: the Ground-Control Plan (9344425e-0fdb-451a-8179-1134301c90ee)

    With mining development on hold and other underground works in a slowdown, the development of nuclear wa te repositories takes centre tage on the American rock engineering scene. Three repositorie for

    Jan 1, 1988

  • AUSIMM
    Microstructural Changes During the Reduction of Wustite (0fae6247-cbaa-4434-8050-a887fa11bf4e)

    By Hayes P. C, Matthew S. P

    The product morphologies formed on the reduction of dense wustite crystals are classified into three types, A) porous iron, B) porous wustite covered with dense iron, and C) dense wustite covered with

    Jan 1, 1985

  • AUSIMM
    Selective Mining at Ok Tedi - Past, Present and Future

    Selective open pit mining for gold has been in progress at Harbour Lights since the onset of mining in March 1985. Selective mining techniques used are similar to those in other recently opened gold m

    Jan 1, 1986

  • AUSIMM
    Prediction of Groundwater Flow in Fissured Limestone, Blendevale Prospect, Western Australia

    Current problems in predicting sub-surface strata movement and fracture development due to longwall mining have highlighted the need for more accurate, dependable methods of physical modelling of r

    Jan 1, 1988

  • AUSIMM
    Statistical Analysis of Dragline Monitoring Data

    By Baafi E. Y

    Dragline monitoring systems are normally the best tool used to collect data on the machine performance and operational parameters of a dragline operation. This paper discusses results of a time stud

    Jan 1, 1998

  • AUSIMM
    Probabilistic Stability Analysis of Embankments and Slopes

    This study introduces a new probabilistic approach to seismic stability analysis of embankments and slopes. The approach is based on Sarma's solution, which is modified through presentation of

    Jan 1, 1992