Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Contrasting Styles of Gold Mineralization along the Grand Pabos-Restigouche Fault System: Implication for Carlin-like Au-mineralization in the Southwestern Gaspé Appalachians

    By André Chagnon, Michel Malo, Benoît Dubé, Chantal Pelchat

    "Abstract- In the southern Gaspé Appalachians, gold mineralization is spatially associated with the Acadian dextral strike-slip Grand Pabos-Restigouche fault system. Two different structurally-control

    Jan 1, 1998

  • CIM
    Effect of Processing Parameters on Laser Cladding of Magnesium Alloy Castings

    By X. Cao, M. Xiao, M. Jahazi

    Magnesium alloys have low hardness, wear, erosion and corrosion resistance. The repair of service-damaged aerospace components made of magnesium alloys is an attractive solution in terms of time and c

    Jan 1, 2006

  • CIM
    Geology of the Stall Lake copper deposit Snow Lake, Manitoba (2efa5b05-37b0-4117-9900-ec4060d7eb36)

    By R. D. Studer

    "The Snow Lake massive sulphide deposits are hosted by Aphebian volcanic rocks of the Flin Flon - Snow Lake greenstone belt, which in this area were deformed and metamorphosed to the amphibolite facie

    Jan 1, 1982

  • CIM
    Bevcon Mines Limited

    By P. B. Demarsh

    "Location: - On highway 59, 17 miles east of Val d 10r near junction of Montreal highway in Northwestern Quebec.Life; - Started production 1952, ceased 1965.Ore: - Pyrite, chalcopyrite and small amoun

    Jan 1, 1966

  • CIM
    Important Considerations in Cyanidation of Gold Ores

    By E. W. Johnson

    "The current increase in gold price may presage a resurgence of gold milling plants in Canada similar to that of the thirties. Because the industry has been at a low ebb for almost two decades, future

    Jan 1, 1979

  • CIM
    Surface Quality of 7075-T6 Aluminum Alloy Machined Using High-Speed Milling Process

    By R. Kamguem

    The surface of a mechanical part plays an important role in determining performance in service. The presence of scratches left by the cutting or tearing of the material on the surface of the workpiece

    Jan 1, 2011

  • CIM
    Metallurgical Properties of Large Aluminium Alsi7mg03 (A356) Sand Castings

    By Franco Chiesa, David Levasseur, Bernard Duchesne

    A 500kg aluminium AlSi7Mg03 casting has been poured and the metallurgical quality at different locations inside the casting has been thoroughly investigated. It included measuring the local tensile pr

    Jan 1, 2014

  • CIM
    Addressing our Workforce Challenges

    By Jerry Handford

    Investing in the Development of our Future Workforce ?Collaborative partnerships with educational institutions, industry associations, governments and other businesses. ?Programs: »Co-op / Discip

    May 1, 2006

  • CIM
    Degradation of Copper Solvent Extraction Reagents in the Presence of Nitrate ? Contributing Factors

    By G. Kordosky

    The experience of one plant regarding degradation of copper solvent extraction reagents in the presence of 20 to 30 g/1 nitrate in the leach solution was described at Cobre 2003. However, little infor

    Jan 1, 2007

  • CIM
    Haul Roads for Surface Mines in Canada

    By Dwayne D. Tannant

    This paper presents a summary of results from a questionnaire sent to surface mines in western Canada seeking information on haul road design, construction, and maintenance. There has been a marked in

    May 1, 2001

  • CIM
    Optimization of the Technological Parameters for the Copper Electrorefining Using Interference Microscopy and Digital Image Analysis

    By D. Zagidulin

    Short term electrodeposition experiments (up to 80 min.) at two current densities 220 and 275 A/m2 with varying concentrations of thiourea and glue were performed to determine the optimum levels of gl

    Jan 1, 2007

  • CIM
    Recovery of Copper from a Massive Polymetallic Sulpidde by High Concentration Chloride Leaching

    By G. B. Harris

    A new process for the recovery of copper and associated base metals from a polymetallic massive sulphide ore is described. The massive sulphide contains copper and especially nickel sulphide in a mine

    Jan 1, 2007

  • CIM
    Modeling stress relaxation at high temperatures involving delayed elasticity

    By Shoma Sinha, Nirmal K. Sinha

    Deformation in a material at any temperature is known to consist of two major components - a reversible (elastic) part and an irreversible part (often called plastic). What is not universally known is

    Jan 1, 2004

  • CIM
    Anomalous Reactivity of Gold Thin Films on Iridium

    By Michio Okada

    Dissociative adsorption of hydrogen (deuterium) on thin gold films grown on Ir{111} surface has been studied with temperature-programmed desorption using a quadrupole mass spectrometer and nuclear rea

    Oct 1, 2003

  • CIM
    Mixed Integer Programming Models for Intermediate Open Pit Scheduling with Variable Slopes

    By Hooman Askari-Nasab

    Open pit mine plans define the complex strategy of displacement of ore and waste over the mine life. The objective of the mine plan is to maximize the future cash flows within the technical and physic

    Oct 1, 2009

  • CIM
    Atomic Absorption and On-Stream Analysis

    By J. C. Ingles

    "A new technique is in the process of revolutionizing inorganic chemical analysis. Galled atomic absorption spectrophotometry, it combines the use of a special light source, a flame, and the equipment

    Jan 1, 1966

  • CIM
    Supply and Demand, Technological Development, and Future Prospect of Copper in Asia

    By M. Okada

    Consumption of refined copper in Asia, especially in China and India, has soared, and the copper price is at its historic height. New smelters and refineries have been built in the region with state-o

    Jan 1, 2007

  • CIM
    Current trends in the tax environment for Canadian mining operations

    By Robert B. Parsons

    "As the 1981 annual reports of Canadian mining companies one by one see the light of day, it becomes clear that softer metal prices and rising costs are the main problems which beset the industry toda

    Jan 1, 1982

  • CIM
    Emergency hoist system at PCS Mining

    By Donald Roberts

    "Parameters f or design and development of an emergency hoist system (Fig. I) were submitted to Timberland Equipment Limited of Woodstock, Ontario by the Potash Corporation of Saskatchewan Mining Limi

    Jan 1, 1986

  • CIM
    The geology of the McClean uranium deposits, northern Saskatchewan (4088e011-b748-401d-9c54-9c5a39eadea2)

    By N. Saracoglu, J. P. Golightly, R. H. Wallis, J. J. Brummer

    "The McClean uranium deposits are located 11 km west northwest of the Rabbit Lake Mine. Their average grade is 1.8 % U3O8 , and they contain 6. 350 tonnes of uranium oxide in seven pods of variable gr

    Jan 1, 1986