Gowanus Pumping Station; Jet Grout Bottom Seal and Deep Support ColumnsBy Paul C. Schmall, Kevin Clarke, Paul J. Lewis, John M. Stanbury
"The $200M rehabilitation of the more than 100-year-old Gowanus Flushing Tunnel and pumping station located on the Gowanus Canal in Brooklyn, NY required deep excavations in an extremely congested urb
Jan 1, 2016
-
Water Powered Percussive Downhole Hammers – Energy Savings And ProductivityBy Shyam Chengalath, Johan Jeansson, Magnus Hörman
Down-The-Hole (DTH) drilling usually uses compressed air to power the hammer. However, there are now DTH hammers on the market which instead of compressed air use high pressure water to power the hamm
Sep 1, 2022
-
Data Drives Herbert Hoover Dike (Hhd) Rehabilitation EffortsBy Michael Arnold, Jignyash Manyam, Yoav Rappaport
The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun
Oct 1, 2022
-
Instrumented Pile Load Tests on ACIP Piles for a Real Estate Project in Kolkata-A-Case StudyBy Krishnendu Mandal
"For a multi-story building project in Kolkata, a pile load testing program was conducted to minimize pile performance uncertainty resulting from variable subsurface conditions and to verify the pile
Jan 1, 2015
-
Jet Grout Underpinning to Support the Waterman HospitalBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
The Waterman Hospital in Tavares, Florida was undergoing an expansion and required a below-grade excavation immediately adjacent to the Emergency Department. This wing of the hospital was under high t
Jan 1, 2019
-
John F. Kennedy Airport Site Redevelopment: Tapertube Pile FoundationBy Gisele R. Passalacqua, Aly Mohammad, Joanna Smith
The $13 billion John F. Kennedy (JFK) airport construction redevelopment program includes new terminals and buildings that are supported on piles to meet the airport expansion demand due to increased
-
The Potential Impacts Of Questionable Instrumenation DataBy Giovanni A. Bonita, Asher H. Peltz, Sean D. Johnson
This paper examines a complex earthwork project in the Washington DC metro area that had project delivery directly impacted by questionable instrumentation monitoring data. The case study summarizes t
-
Today’s Connectivity: Using Historical Data to Anticipate Future RiskBy Michael Frawley, Deana Ruud, Jessica Turner
Technology is allowing for new ways to mitigate risk associated with subsurface exploration and unanticipated subsurface conditions during construction. Unanticipated subsurface conditions have the po
Jan 1, 2019
-
Nicholson In The Neighborhood: Virginia’S North Hill ProjectBy Dominic Ammon, Mark Rothbauer, Paul Landers P. E.
Across the Potomac River from the location of the DFI47 Annual Conference (October 2022), in Alexandria, VA, two large permanent anchored walls with a decorative shotcrete face were recently construct
Oct 1, 2022
-
Levee Rehabilitation, Lower Wood River Phase II– East Alton IL. Deep Cutoff WallBy Gene Bryant, Wesley Schmutzler, Matteo Bertoni
The levees where the Mississippi River and the Lower Wood River meet near East Alton Illinois have been a problem area for years due to underseepage. The first phase of the deep cutoff wall was a 2,00
Jan 1, 2019
-
Urban High Capacity Deep Foundation Solutions in Sites with Complex History and GeologyBy Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith
New York City is an urban environment with a history spanning over 200 years. The coastline of New York has changed over the years. In the East River, old bulkhead and remnant of relieving platforms t
Jan 1, 2019
-
Cement Deep Soil Mixing Shear Wall Stabilization Calaveras Dam Replacement Project, CaliforniaBy Michael Forrest, John Roadifer, Glen Gorski
"The Calaveras Dam Replacement Project (CDRP) requires large disposal sites to store excess excavated materials that could not be utilized for dam construction. Because of access restrictions during d
Jan 1, 2015
-
Excavation Support by Deep Soil Mixing- Challenges on Depth and Long Term ExposureBy D. Barber, A. D. Miller, P. A. Bray
The project was to develop an area within the existing West County Wastewater Treatment Plant which would enable the construction of a new Raw Wastewater Pump Station (RWPS) with a footprint of approx
Jan 1, 2017
-
Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off WallBy James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.
"The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150
Jan 1, 2016
-
Large Scale Geotechnical Works on Norways Largest Infrastructure ProjectBy Brandon M. Robinson, Osman F. Besler, Dominik Gaechter
With the increase in population over the last decade, and anticipated population growth over the coming years, Norway is making significant investments in the Country’s infrastructure. Part of this in
Sep 8, 2021
-
The Need For Air Control In Down The Hole Hammer Casing Advancement DrillingBy Frank J. Purcell
“Down The Hole” (DTH) hammer drilling is often necessary to advance the casing during pile construction where the test bores have determined difficult drilling conditions with obstructions such as bou
Nov 1, 2022
-
Efficient Deep Foundations, Earth Retention Systems and Ground Improvement – New School Techniques for Columbia Manhattanville’s Subsurface ChallengesBy Justin Lukens, Di Stasim Jeffrey, Frank Di Salvo
Columbia University’s Manhattanville Campus expansion includes the construction of two new business school buildings. The new buildings require development of an entire city block bound by 12th Avenue
Jan 1, 2019
-
Solving Variable Bedrock Challenges With Ductile Iron PilesBy Kevin R. Johnson, Matt Caskey, Bryan Plaskett
Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical design and construction. These challenges can include constrained si
Oct 1, 2022
-
Design, Installation And Performance Of Earth Retention System To Limit Ground Movements Around Sensitive Structures In Washington, DcBy Douglas R. Hardin, Stanley L. Worst, Joanna Mason
A challenging earth retention project presented itself in Washington, DC in the backyard of the historic House of the Temple (The Scottish Rite of Freemasonry, Supreme Council 33°). Located at 15th St
Oct 1, 2022
-
Horseshoe Secant Compression Shoring System For Tunnel RepairBy Karen Talbot, Noah Maier, Rob Jameson, Giuseppe Gaspari
A storage and drainage tunnel advancing below I-75 in Detroit, Michigan experienced sudden subsidence. The Tunnel Boring Machine (TBM) was damaged to the extent that its shield, cutting head and exten
Oct 1, 2022