    Resolution Of Prestressed Concrete Pile Splice Problems - Summary

    By David Siu

    Many problems were encountered with the mechanical wedge-type splices used for the 15-inch square precast prestressed concrete piles installed at an industrial plant site. Many of the wedges were brea

    Jan 1, 1991

  • DFI
    Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, La

    By Antal Partos

    ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test boring

    Jan 1, 1992

  • DFI
    Press-In Piling Technology For Sustainable Construction

    By Philip Dubbeling

    Conventional dynamic sheetpiling techniques are ill-suited to urban development because of the emission of excessive noise and ground vibrations. Drilled shafts and slurry walls alleviate some of thes

    Jan 1, 2006

  • DFI
    Piling Practice in Sedimentary Granular Soils of Santa Cruz, Bolivia

    By Mario Terceros H, Bengt H. Fellenius

    "ABSTRACTThe city of Santa Cruz, Bolivia, is historically dominated by houses and three to five storey buildings.The geology in and around the city is such that even very light buildings need to be su

    Jan 1, 2014

  • DFI
    Optimization of the Piled-Raft Foundations Considering the Soil-Pile-Raft Interaction

    By Hessam Yazdani

    In comparison to the conventional piled foundations, the piled-raft foundations provide a more economical solution to support high-rise buildings constructed on soft soils. In this type of foundations

    Jan 1, 2013

  • DFI
    Geojet®-Turbojet® - A Deep Mixing Method For The Solution Of Geotechnical Problems

    By Maurizio Siepi

    The realisation of most of the civil engineering works is subordinate to the execution of consolidation works, in order to improve the soil physical-mechanics characteristics. The works classifiable w

    Jan 1, 2002

  • DFI
    Innovative Methods for Underground Parking in Central Cities

    By Qi Wang, Zengzhu Kang, Jianguo Liu, Guanglei Liu

    "Due to the increase of automotive vehicles, available parking spaces become a new type of limited resource in central cities of China, especially in those old districts without visionary urban planni

    Jan 1, 2017

  • DFI
    Installation Of Augerpiles In Low Headroom And Restricted Access Conditions

    By Jim Steding

    L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th

    Jan 1, 2003

  • DFI
    Increase In Shear Modulus By Soil Mix And Jet Grout Methods

    By Paul J. Axtell

    The results of in-situ geophysical cross-hole tests on improved soil by soil mixing (SM) and jet grouting (JG) are described. This testing was conducted on soil improved by SM and JG columns construc

    Jan 1, 2008

  • DFI
    New Piling System With Multi-Head Hammer Drill Capable Of Drilling Including 35,000 Psi Rock "Mach Drilling System" And Some Construction Examples - 1. Incentive Of Development

    By J. Nakayama

    For drilling large diameter holes for deep foundations, the common and distressing difficulty of long standing has been in coping with ground containing rocky formations and boulders. Where geological

    Jan 1, 1988

  • DFI
    Integrity Testing Of Deep Foundations - Synopsis

    By R. T. Stain

    Integrity testing of deep foundations is now common practice in Europe, indeed in the City of London such testing is a contractural requirement on every site. This paper is in two parts: Part

    Jan 1, 1987

  • DFI
    Simulation of Brittle Failure of Cement Treated Soil Using Smoothed Particle Hydrodynamics

    By Tomohide Takeyama, Yuki Yoshida, Masaki Kitazume

    "Abstract A series of centrifuge model tests was conducted to investigate the failure pattern and stability of cement treated clay ground having an unsupported vertical slope. The model ground was sub

    Jan 1, 2014

  • DFI
    Load Testing High Capacity Drilled Shafts - Summary

    By Jorj O. Osterberg

    Until ten years ago, the largest load tests on drilled shafts (bored piles) were about 3,000 tons (27MN). These tests were made with kentledge (large weights, usually concrete blocks) stacked up as a

    Jan 1, 2002

  • DFI
    Drilled Pier Foundations In Downtown Seattle - Introduction

    By Thomas M. Gurtowski

    This paper presents a summary of allowable bearing pressures and skin friction values that have been used to design drilled pier foundations for support of high-rise structures in downtown Seattle, Wa

    Jan 1, 1990

  • DFI
    Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central Station

    By Wolf-R. Under

    For improvement of urban traffic infrastructure, the City of Amsterdam is cur­rently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti

    Jan 1, 2006

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (b596934a-6910-4dd1-8c4a-72745306d21b)

    By Tracy Brettmann

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2001

  • DFI
    High Stress Pile Testing At Soldier Field

    By Michael H. Wysockey

    The load test program for the pile foundation at Soldier Field included static and dynamic load tests at four locations around the site. The dynamic tests were run with no knowledge of the static resu

    Jan 1, 2002

  • DFI
    Ground Support And Its Toolbox

    By G. Sauer

    "More Skill is needed to avoid rather than to handle heavy ground loads." This finding, from a tunneling engineer of the nineteenth century, is still relevant today with all advanced sequential excava

    Jan 1, 2003

  • DFI
    Macropiles: Ultra-High-Capacity Micropiles For Foundation Support

    By John R. Wolosick

    MACROPILES are defined as ultra-high-capacity micropiles, with working loads in excess of 250 tons. The piles are typically 9-5/8 to 24 inch (244 to 610 mm) outside diameter. They are drilled and gr

    Jan 1, 2006

  • DFI
    Kirkpatrick Street Pump Station Addition Excavation: Small Project, Big Twist

    By James P. Stewart

    This case history describes the engineering design and construction for the Contractor of a 35-ft-deep excavation for an 800-square-foot addition to an existing sewage pump station. The site posed une

    Jan 1, 2003