Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Examples Of The Use Of Temporary Works Soil Nailing In The UK And Ireland

    By Martin J. Pedley

    The use of soil nailing has grown steadily in the UK over the last 15 years and it has recently become more popular in the Republic of Ireland. This paper presents three soil nailing temporary works c

    Jan 1, 2000

  • DFI
    Stabilization Of Organic Soil With The Limix System

    By Magnus Ruin

    The dry deep mixing method for stabilization of soft soil has been used in the Scandinavian countries for 25 years. The typical application has been stabilization of soft inorganic clay. Today the met

    Jan 1, 2001

  • DFI
    Classical And Finite Difference Method To Estimate Pile Capacity Compared With Pile Load Testing Results

    By Yogesh Prashar

    Three conventional uplift tests and 12 Rapid Pile Load Tests (RLT) were performed on total of fifteen 16-inch square pre-cast concrete driven piles at a test site in Emeryville California in December

    Jan 1, 2002

  • DFI
    Interlocking Caisson Walls

    By William E. Lardner

    Interlocking caisson walls developed from conventional "soldier pile and lagging" shoring. In the latter, the soldier piles receive directly most of the soil load. Natural arches form in the soil behi

    Jan 1, 1987

  • DFI
    Deep Soil Mixing for Contaminated Soil Remediation at a Superfund Site

    By Larry Stearns, Lori Tiefenthaler

    Remediation of contaminated soil represents a significant market for application of Deep Soil Mixing (DSM). Eighty-one percent of U.S. Environmental Protection Agency (EPA) Superfund Program’s site re

    Jan 1, 2018

  • DFI
    New Technology For An Old Seawall: Micropile Installation At Ellis Island National Park In New York Harbor

    By Helen D. Robinson

    The seawalls that surround Ellis Island were constructed in the early 1900s and now show varying degrees of deterioration. An innovative approach to the structural repair of the seawalls was develope

    Jan 1, 2008

  • DFI
    Jet Grouting And Safety Of Tuttle Creek Dam

    By Timothy D. Stark

    Jet grouting has increasingly become a ground improvement technology used to address seepage concerns and provide strength improvement to soils underlying dams. The technique of jet grouting uses high

    Jan 1, 2012

  • DFI
    Ground Improvement By Cement Grouting Combines With Pipe Piles In Bridge Construction - Summary

    By Peter White

    A bridge reconstruction project involved driving pipe piles for the new foundations. Disturbances within soil layers at depth caused sinkholes to open up within the construction site. After a near fat

    Jan 1, 1997

  • DFI
    Double Rotary CFA Piles: Performance In Cohesive Soils

    By Michel Bustamante

    The occasional substandard performances of continuous flight auger in particular soil conditions have prompted the drilling rig manufacturer to improve the standard CFA in order to reduce its negative

    Jan 1, 2002

  • DFI
    Evaluation of Crane Pad Performance on Partially Improved Ground Adjacent to a Seawall

    By Paul J. Sabatini, Yazen A. Khasawneh

    "A Demag CC1800 crawler crane was partially erected on crane mats adjacent to a seawall when settlements near a corner of the crane mat area were observed to be slightly larger than previously assesse

    Jan 1, 2017

  • DFI
    Innovative Application Of Piled Raft Foundation To Optimize The Design Of High-Rise Buildings And Bridge Foundations

    By Y. El-Mossallamy

    The piled raft foundation was extensive applied in the last two decades in different soil conditions e.g. in soft to stiff clay as well as in medium to dense sand and even in highly weathered rock. Th

    Jan 1, 2006

  • DFI
    Kinematic Load Tests On A Model Pile In Clay

    By Michael J. Brown

    Load testing is important for controlling the quality of piled foundations. The Statnamic test is an alternative to existing testing methods with a load duration that lies between that for static and

    Jan 1, 2002

  • DFI
    High Capacity Drilled Cast-In-Place Piles, House Of Representatives Building, Lansing, Michigan - Summary

    By Robert C. Rabeler

    Soil and Materials Engineers, Inc. (SME) has utilized drilled cast-in-place (D-CIP) piles on a number of projects in the midwest. These foundation systems have typically consisted of drilling an 8 to

    Jan 1, 1999

  • DFI
    Static Uplift and Lateral Load Testing of Piles for a New Power Plant

    By José L. M. Clemente, John R. Davie

    "Abstract An extensive pre-production static and dynamic pile load testing program was conducted for a coal-fired power plant. The static load testing program included axial compression, uplift (tensi

    Jan 1, 2014

  • DFI
    Vibwall Installation - Cardiff Bay Barrage ? Synopsis

    By Graeme McWhirter

    This paper discusses the Installation of a Vibwall for the Cardiff Bay Barrage Project Wales, UK, by Kvaerner Cementation Foundations. Only the second use of the technique in the UK the wall was succe

    Jan 1, 2000

  • DFI
    Seattle Shored Excavation - Design, Construction, Monitoring

    By David Winter

    The geotechnical design, construction, and monitoring aspects of a tied back excavation 85 feet deep in Seattle, Washington are presented. The excavation was completed in overconsolidated deposits of

    Jan 1, 1987

  • DFI
    Toward Understanding the Seismic Performance of Rigid Inclusions

    By J. Tanner Blackburn, James R. Gingery, Lisheng Shao

    Rigid inclusions consist of grout columns installed using displacement auger or vibrated tooling. The columns are typically installed in an array to provide support for footings, mats, or embankments.

    Jan 1, 2018

  • DFI
    Accessing History

    By Richard Pizzi

    Built in 1806, Boston's African Meeting House is the oldest surviving Black church building in the country. A $7 million dollar renovation was begun in 2006 to restore this historic building to

    Jan 1, 2011

  • DFI
    Insight to Foundation Construction of Extradosed - 3rd Narmada Bridge over River Narmada, Bharuch, Gujarat

    By Ekhlaq A. Khan

    "The new third Bridge over Narmada River at Bharuch which was recently completed is characterized by some aesthetically appealing elevations of the pylon and large size of the deck. This paper gives a

    Jan 1, 2017

  • DFI
    Assessment Of The Risk Of Pile Driving To Juvenile Fish - The Problem

    By James J. Anderson

    In this talk I will report on an effort to reassess the risk of pile driving to juvenile salmonids migrating through Puget Sound. The study was motivated by the concern of the construction industry th

    Jan 1, 1990