Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Geotechnical Investigation For Deep Foundation Projects In Shanghai Area ? Synopsis

    By E. R. Wang

    This paper outlines the engineering properties of shallow soil in Shanghai area. The main points that should be paid attention to during deep foundation investigation, and general conditions of experi

    Jan 1, 2010

  • DFI
    Pressure Injected Footings Mobile Convention Centre - Introduction

    By D. G. Bishop

    This paper is intended as a review and update of the use of Pressure Injected Footings as deep foundation units in North America. We will discuss various aspects of this pile and then discuss a partic

    Jan 1, 1992

  • DFI
    Geotechnical Design and Performance of Road and Railway Viaducts Supported on DSM Columns - A Summary of Practice

    By Michal Topolnicki

    "Discussed is the use of wet Deep Soil Mixing, generally executed with single mixing tools 0.8 to 1.6m in diameter, employed in the foundation of viaduct supports. The applications involve economical

    Jan 1, 2015

  • DFI
    On The Effects Of Sand Grading On Driven Pile Performance

    Precast prestressed concrete piles designed to be end-bearing in a sand stratum at Drax Power Station met with extremely variable resistance during driving. Some piles came to virtual refusal almost i

    Jan 1, 1989

  • DFI
    Site Management Towards Pile Execution At Qurashiya Bridge

    By Emad W. Shublaq

    Contractual site plans are implemented for executing pile foundations (5 x 5) at segmental concrete bridge. Project schedule demands have forced the contractor to find out the most economical procedur

    Jan 1, 1992

  • DFI
    Micropile Foundations For Support Of New Bridge Structures Over Abandoned Mine

    By Timothy J. Myers

    Expansion and the economic growth in the southwestern region of Missouri necessitated the expansion of State Route 249 and the construction of a new interchange to provide service to the Joplin, Misso

    Jan 1, 2009

  • DFI
    Effects Of Mineral And Polymer Slurries On Drilled Shafts - 1. Introduction - 1.1 History Of And Principles Of Mineral Slurries In Drilled Shaft Construction

    By Michael W. Neill, O&apos

    Drilling slurry has become an effective aid to the construction of drilled shafts in caving and/or waterbearing soils. Historically, drilling slurry made of bentonitic clay and water was first used in

    Jan 1, 1991

  • DFI
    Design Considerations For Laterally Loaded Free-Head Rigid Piles In Engineering Practice

    By O. Craciun, C. A. Bridges, M. Cai, J. Sugawara

    There are a number of methods that can be adopted for predicting the ultimate lateral resistance of a free-head rigid pile, from the conventional Brinch Hansen and Broms solutions to three-dimensional

    Nov 1, 2022

  • DFI
    Lateral Load Test on Piles with Large Free Stand

    By P. V. Chandramohan

    "In ports, piled berths are designed and constructed for berthing of ships with a finite draught. Piles in a bridge foundation also have a large free stand above scoured level. The piles of these stru

    Jan 1, 2015

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 2003

  • DFI
    The Effects Of System Components On The Deflection Of MSE Retaining Walls

    By Scott C. Vollmer

    This paper seeks to examine some of the technical factors influencing the deflection of Mechanically Stabilized Earth (MSE) retaining walls based on the authors' field observation of numerous str

    Jan 1, 2003

  • DFI
    Deep Soil Mixed Wall And Jet Grouting For An Excavation Support System At The Museum Of Fine Arts In Boston, Massachusetts

    By Harry Schnabel

    A 6200 m² cement deep soil mixed (CDSM) wall was constructed for an addition to the Museum of Fine Arts in Boston, Massachusetts. The addition was located along the east side of the existing museum wi

    Jan 1, 2011

  • DFI
    Conventional Static And Rapid Load Tests On CIDH Piers At A University Of California Berkeley Site

    By Gyimah Kasali

    Rapid Load Testing was performed as part of an extensive drilled pier testing program for the University of California Berkeley Capital Improvement Program. The purpose of the program was to: (1)

    Jan 1, 2002

  • DFI
    Overview of Design and Practice of SDS Piles in China

    By Gang Guo, Zhong Liu, Yi Zhang, Jingchun Lu

    "Abstract Application of soil displacement screw pile (known as SDS pile) has been experiencing accelerated growth in Chinese deep foundation industry because of its technical advantages, environmenta

    Jan 1, 2014

  • DFI
    High Capacity Rock Anchors At The Bear Mountain Bridge

    By Frederick C. Rhyner

    This paper describes the design and construction of two high-capacity rock anchors to restrain a supplementary backstay for the Bear Mountain Bridge, which is a suspension bridge spanning the Hudson R

    Jan 1, 2010

  • DFI
    Limitations Of Predicting Deformations During Excavation In Soft Clay ? Summary

    By Richard J. Finno

    Detailed measurements made at a test section adjacent to a deep braced cut and other published data are combined to illustrate the limitations of the common methods of predicting movements associated

    Jan 1, 1991

  • DFI
    A Case History Studying On Displacement Controlling In Deep Excavation

    By Feng Yongxuan

    Anchored sheep pile is normally used in deep excavations, many of which only require stability in accordance with Terzaghi theory. In this paper, based on the experience, new lateral earth pressure me

    Jan 1, 1991

  • DFI
    Measurement And Analysis On The Bearing Behaviour And Driving Effects Of Piles In Shanghai Region

    By Gao Dazhao

    This paper presents some research results of pile foundation performance. Measurements on the bearing behaviour and driving effects of piles have been carried out during pile testing and pile driving.

    Jan 1, 1991

  • DFI
    Steel H-Section Piles Support 2,120-Foot Long Cable Stayed Bridge Verona Island And Prospect, Maine

    By James W. Weaver

    The 2,120-foot long cable stayed Penobscot Narrows Bridge that carries US Route 1 over the Penobscot River between Verona Island and Prospect, Maine is supported on four foundation units, one below ea

    Jan 1, 2011

  • DFI
    Mitigating Settlement with Pile-Supported Approach Slabs

    By Reda M. Bakeer

    "An approach slab is the roadway segment that immediately follows a bridge intended to provide a smooth transition between the two elements. Some approach slabs have developed rough rideability with t

    Jan 1, 2017