Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Effect of Artificial Discontinuities Formed by Presplitting with Different Depths on Structural Damage Risk

    By Enver Alan

    This Research & Development (R&D) study was conducted in the field of applied blasting engineering in Ethiopia, within the AKH Railway Project, which was built in Girena, within the boundaries of the

    Feb 1, 2020

  • ISEE
    Blasting Conditions Couldn't be Worse

    By John Atkinson, Steve Repola

    This paper will describe two blasting plans that have been developed for American Aggregates' Marble Cliff Quarry located near Columbus, Ohio. Two different limestone formations are mined on different

    Jan 1, 1993

  • ISEE
    Impact of Blasting Sequence on Dilution and Benefit Through Ore Displacement Control Using Three-Dimensional Modeling

    By Paulo C. Fernández A, Sergio Matamala V, Claudio C. Gajardo, Christian A. Rees P

    In fragmentation processes in open-pit mining, it has been observed that there are many opportunities for improvement if greater control of ore displacement in blasting is achieved, reducing the perce

    Jan 26, 2026

  • ISEE
    Harmonic Delamination of Nuclear Structures

    By Frederick B. Kuhnow

    Harmonic energetic delamination a building is being considered for demolition at a formerly known atomic power lab. The building is within a containment structure under a negative pressure, so that no

    Feb 1, 2020

  • ISEE
    Ring Blasting Design Modeling and Optimization

    By María Rocha, Benjamín Cebrián, Roberto Laredo

    "Ring blasting designs have to achieve different goals in order to become efficient whether is done in up hole or downhole fashion. Ore recovery/dilution control, fragmentation and drift integrity all

    Jan 1, 2017

  • ISEE
    Vibration Data Analysis to Optimize the Blast Design and Improve Shovel Productivity

    By Luana Ferreira de Carvalho, Aurelio Manço Garcia, Gustavo Sampaio Lopes, Jose Silvio Corsini, Davi Bastos Martins de Oliveira

    The Enaex Mining Technical Solutions (EMTS) team, in partnership with the Anglo American Iron Ore Brazil drilling and blasting team, has developed a study aiming to optimize the blast design applied a

  • ISEE
    Vibration Data Analysis to Optimize the Blast Design and Improve Shovel Productivity

    By Luana Ferreira de Carvalho, Aurelio Manço Garcia, Gustavo Sampaio Lopes, Jose Silvio Corsini, Davi Bastos Martins de Oliveira

    The Enaex Mining Technical Solutions (EMTS) team, in partnership with the Anglo American Iron Ore Brazil drilling and blasting team, has developed a study aiming to optimize the blast design applied a

    Feb 1, 2020

  • ISEE
    Western Europe's Largest Underground Blast

    By P McConnell, T Garrigan

    Tara Mines Limited, in Ireland, is Western Europe's largest zinc mine. Annual metal production, from 2.5 million tonnes of ore, consists of 180,000 tonnes of zinc and 34,000 tonnes of lead.

    Jan 1, 1989

  • ISEE
    Modeling the Effect of Delay Scatter on Peak Particle Velocity of Blast Vibration Using a Multiple Seed Waveform Vibration Model

    By Mick Lownds, Ruilin Yang

    The potential advantages of electronic detonators with accurate timing have been increasingly recognized by the blasting community. However, in comparative blasts the results with pyrotechnic timing a

    Jan 1, 2011

  • ISEE
    Modeling of rock fragments trajectories ejected from blasting based on high-speed video analysis

    By Jaime Herrero, Santiago Gómez, Pablo Segarra, José Ángel Sanchidrián

    This paper presents a mathematical model for the study of the 2D movement of blast bench faces based on the high-speed video analysis of three blasts at El Aljibe quarry (Spain) recorded at 2,000 fram

    Jan 26, 2026

  • ISEE
    Examination of Dynamic Parameters of Rocks using Hopkinson Bar Experiments

    By O. Rielo, A. Pascoal, P. Katsabanis

    The dynamic parameters of two different granites have been obtained using Hopkinson bar experiments. One series of experiments were conducted using a Hopkinson pressure bar apparatus with an explosive

    Jan 1, 2011

  • ISEE
    Resolution to a Conflict Regarding Blasting Near a High Pressure Pipeline

    By Randall Wheeler

    In early 2008 we were asked by a quarry to become involved in a conflict with a pipeline company concerning blasting near one of their underground high pressure gas lines. The pipeline company, withou

    Jan 1, 2011

  • ISEE
    Analytical Measurements in Cast Blasting to Identify the Cause and Cure for "Orange Smoke" Formation

    By Charles R. Barnhart

    The Nitrogen Dioxide Cloud: After one year of testing it can be stated that we do know and understand a great deal about why the nitrogen dioxide formation is exacerbated in cast blasting. Picture 1 i

    Jan 1, 2004

  • ISEE
    Hole Diameter: Does it Affect Vibration Attenuation?

    By Tyler Acorn, Paul Worsey, Nathan Rouse

    The effect of the hole diameter on vibration attenuation has not been incorporated in most vibration models in the blasting industry. In current vibration models, the charge weight and the distance fr

    Jan 1, 2013

  • ISEE
    Effects of Mid-Field Surface Blasts on a Tall Scaled Target

    By Ethan Steward, Kyle Perry

    Blast resistant structural design continues to be a research area of major concern for governments around the world due to explosive threats from both state and non-state actors. Glass and aluminum cu

    Jan 21, 2025

  • ISEE
    Reducing Blast Vibration Amplitudes Close-In to Structures of Sub-Standard Construction

    By Enrique Munaretti, Cathy Aimone-Martin, Vitor Rosenhaim, Jair Koppe

    Production blasts at one of Copelmi’s coal mine operations will be carried out 100 m (330 ft) from a neighborhood located in the town of Butiá, southern Brazil. Mine management is concerned about the

    Jan 1, 2013

  • ISEE
    Rock Fragmentation Modeling Using a Neural Network-Based Approach in a Gold Open Pit Mine

    By Cesar Guerra, Alejandro Rojas, Dr. Jhon Silva, Luis Velasquez

    The ANN method is applied to predict the P_80 size in one open pit gold mine in Peru. The ANN was implemented in Matlab programming language, and the results from the ANN are compared with data obtain

    Feb 1, 2020

  • ISEE
    Contour Blasting in Tunneling: the Role of Drilling Precision

    By Mauro Fornaro, Marilena Cardu, Renato Mancini, Daniele Castano

    Tunneling by explosive blasting in civil works isn't merely intended to break somehow a way through the rock, rather to drive a permanent, constant cross section, lined way. The current mechanical exc

    Jan 1, 1992

  • ISEE
    "Fast Rock Segmentation Using Artificial Intelligence to Approach Human-LevelAccuracy"

    By Ian Bell, Saman Nouranian, Shahram Tafazoli, Bahram Sameti, Mahdi Ramezani

    "Image-based rock fragmentation sensing in mining and quarry applications includes an important rock boundary delineation step, which is commonly referred to as rock segmentation. This paper presents

    Jan 1, 2017

  • ISEE
    Optimization of Blast Design Parameter for Ring Blasting in Underground Hard Rock Mine Using Numerical Simulation

    By VIVEK KUMAR HIMANSHU, Murari Prasad Roy, Kaushik Dey, Rakesh Kumar Singh, Ashish Kumar Vishwakarma

    Sublevel stoping is commonly adopted method in underground hard rock mining. Proper planning and its execution is the key requirement for stope extraction using this method. The stope extraction has b

    Feb 6, 2023