Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Ore guiding in underground mining using MWD and machine learningBy J. Sanchidrián, A. Fernández, P. Segarra
The combination of chemical analysis techniques as XRF and measurement-while-drilling (MWD) technology in underground mining is a novel approach to gather comprehensive on-line information about physi
Jan 1, 2024
-
The Investigation Of Establishing The National Damage Criteria For Blast-induced Ground Vibrations In TurkeyBy Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Umit Ozer
The environmental problems such as vibration, and air blast are often faced, and discussed on mining, quarrying, civil constructions, shaft-tunnel, pipeline, and dam operations where blasting is inevi
Jan 1, 2010
-
A Comparative Study Of Ppv Analysis Of Tunnel Rounds Using Both Non Electric And Programmable Electronic DetonationBy Andrew Wetherelt
Blast vibrations are of paramount importance in a society where ever increasing development is putting more stringent requirements on their control. Increasing civil development and more complex extra
Jan 1, 2007
-
Blast Optimization and Vibration Control at a Multi-Seam Coal Mine, BrazilBy Enrique Munaretti, Vitor Rosenhaim, Jair Carlos Koppe, Joao Francisco Feijo
The B3 mine is a multiple coal seam strip mining in operation in Rio Grande do Sul, the southernmost state in Brazil. A traditional truck & excavator operation is used to remove the overburden and sel
Jan 1, 2012
-
Blast Optimization Through Drilling Information: GBlast®, a Predictive Modeling SoftwareBy Claudio Lechuga, Carlos Scherpenisse, Juan Rafael Otaiza
From the analysis of drilling process, Block Model information, drilling pattern data and expected fragmentation targets; GBlast® software optimizes the explosive charge design in order to standardize
Feb 1, 2020
-
Tunneling in Thinly Foliated Rockmass ConditionsBy H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen
Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne
Feb 1, 2020
-
Development of Controlled Blasting Pattern for Rock Excavation to Create Foundation of an Industrial EstablishmentBy Dipankar Gorain, A K. Vishwakarma, Vivek K. Himanshu, Murari P. Roy, Shubham Singh, R S. Yadav
The industrial establishments of a power plant consist of many important structures viz. cooling tower, wagon tippler, track hopper, plants and offices. The leveled foundation is the utmost need for e
Feb 6, 2023
-
Implementation of an Integrated Quality Assurance and Control System Applied to High Complexity Blasting Open PitBy Regina Rocha, Miguel Humpire
One of the challenges within unitary mining operations is blasting, which has a significant downstream impact on the following processes, which is why mining companies ensure the results of the blasti
Feb 6, 2023
-
Application of Geostatistical Tools in Measurement While Drilling to Assess Geotechnical Rock Conditions in Sublevel CavingBy Clara Godoy, Álvaro Dapía, Paulo Couceiro, Pablo Segarra, José Ángel Sanchidrián, Juan Navarro
This paper applies geostatistical tools in Measure While Drilling (MWD) data to estimate the probability distribution of values in all the points of the studied domain in order to assess the continuit
Feb 1, 2020
-
Modern Underground Raise and Slot DesignBy N. Rouse
Underground raises and slots are a vital part of underground blasting operations. Raises and slots are vertical shafts or openings used for ventilation, ore passes, or creating voids in stopes. In the
Jan 1, 2024
-
Using Photogrammetry and UAVs for Pattern Optimization, Quantification, and MappingBy Tony Rorke, Tamara Wiseman
Due to the advancements in technology it becomes easier to obtain accurate measurements for mining, quarry, and construction operations even in the most remote places. The use of off-the-shelf photogr
Jan 1, 2015
-
Drilling and Blasting OptimizationBy Jorge Flores, Benjamin Cebrian
Blast Optimization at a high altitude mine operation involves not only the selection of the right drilling designs and explosives but also the circumstances of operators working at low oxygen levels a
Jan 1, 2015
-
Evaluation of Emergent Electronic Detonators and Modern Non-Electric Shocktube Detonators AccuracyBy J Silva Castro, W C. Wedding, B T. Lusk, J Calnan, E G. Morris
The emergence of electronic detonators for use in production mine blasting has enabled mining professionals to rethink the traditional blast design methodologies that pertain to timing. In many ways,
Jan 1, 2012
-
Demolition of Churchill House in Belfast, IrelandBy Dick Green
During the recent troubles in Northern Ireland due to terrorist activities, there have been many buildings demolished or damaged by improvised explosives. This article explains about the Demolition of
Jan 1, 2006
-
Design of a Passive Underwater Pressure GaugeBy S. Lim, G. Walsh, V. Romero
The cable television show, Mythbusters, contacted the New Mexico Institute of Mining and Technology requesting a pressure gauge to be used in underwater testing. The requirements for the gauge were: i
Jan 1, 2009
-
Burden Profiling: Do You Measure What You Think You Do?By Greg Shapiro, Paul Dr. Worsey
Mining, quarry, and construction blasts are becoming more and more dependent on bench profiling. The use of accurate profiling gives the blaster better data for the most efficient blast results. So,
Jan 1, 2019
-
New Methodology in Measuring Experimental Results of Linear Shaped Charges Using Digital SoftwareBy Kevin Phelps, Jason Baird, Philip Mulligan, Dominique Nolan
Determining the transitions from run-up to optimal cut length and optimal cut length to run down, without bias, from the penetration of a linear shaped charge (LSC) is difficult. The stresses applied
Jan 1, 2013
-
Tunneling in Thinly Foliated Rockmass ConditionsBy G. C. Naveen
Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne
-
Non-Electric Shock Tube and Optimizer Initiation Systems, Applications and HookupsBy Tom Treleaven
This guide presents numerous patterns that provide 8 millisecond separations between initiated charges. The guide is tabulated in seven sections to provide quick reference by number of decks or bunch
Jan 1, 1997
-
Inverse Hybrid Method for Determining Pressure Loading on Plates Due To Buried MinesBy Damien Bretall, William Fourney
Due to the changing face of warfare there is an ever growing need to protect the underside of combat vehicles from mine blasts. This paper presents a new method to better characterize the pressure pro
Jan 1, 2009