Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The reduction of fluxed and non-fluxed manganese, ores by ferromanganese silicide
By W. P. Channon, J. B. See
The reduction of fluxed and non-fluxed manganese, ores by ferromanganese silicide by W. P. CHANNON, B.Se. (Eng.), M.Sce. (Eng.) Wits. (Visitor) and J. B. SEE, B.Sce. Hons., Ph.D. (New South Wales), M.
Jan 3, 1977
-
Transport Of High Clay Content Thickened Tailings: A Case Study
By N. Saldía, C. Riveros, R. Hills, S. Barrera
The transport of tailings composites provided by different sources is a field of study where a limited amount of research has been conducted. Nevertheless, such systems are important sources of operat
Jan 1, 2007
-
Microwave-Assisted So2 Flushed Acid Leaching Of Mixed Cobalt-Copper Oxidised Ores
By B. B. Mamba, J Ndalamo
The existence of an impressive reserve of oxidized cobalt-copper bearing ores in the African copper belt area lead the GECAMINES (DRC) to develop specific and adapted mineral processing routes (Mulaba
Jan 1, 2007
-
A pilot-plant investigation of a kinetic model for flotation
By R. P. King
The flotation behaviour of phoscorite from the Phosphate Development Corporation was measured in a pilot plant, the flotation cells in the plant being varied in configuration so as to operate with or
Jan 1, 1978
-
Electrokinetic solid-liquid separation of an ultrafine kimberlite suspension
By W. Wilmans
Electrokinetic dewatering of kimberlite slime under constant direct curents of 0,5 to 2 A and dewatering under constant applied potentia Is of 16,5 to 46,5 V are considered. The combined efects of ele
Jan 1, 1987
-
The Dual-Electrode DC Arc Furnace?Modelling Brush Arc Conditions ? Synopsis (33ce1b78-a71f-4fad-b87a-23567a029921)
By Q. G. Reynolds
The dual-electrode DC arc furnace, an alternative design using an anode and cathode electrode instead of a hearth anode, was studied at small scale using computational modelling methods. Particular at
Jan 1, 2012
-
The control of autogenous and semi-autogenous mills: the relationship between measurements of bearing pressure and parameters describing the mill load
By M. H. Moys
The capacity of grinding mills can be maximized by use of measurements of mill power and bearing pressures. The criterion is as follows. If the derivatives with respect to time of the power and bearin
Jan 1, 1980
-
The Influence Of Microstructural Parameters On The Yield Stress And Fracture Toughness Of 3CR12 Steel
By B. Z. Weiss, N. R. Comins, F. Blum
The effect of microstructure on the deformation and fracture properties of 3CR12 steel was investigated at different strain rates in the temperature range -196 to 200°C. The yield stress of the as-rec
Jan 1, 1992
-
A 100-MN Jacking System for Testing Coal Pillars Underground
By K. Hodgson, J. P. M. Hojem, N. G. W. Cook
Already about one-third of South Africa's coal is mined at depths exceeding 100 metres. Almost all this mining is done by the bord and pillar method. Conventional design procedures call for ever
-
A Model Study Of Copper Rougher Recovery Optimisation At PT Freeport Indonesia
By S R Grano
A fundamental model, which considers the subprocesses of particle collection by bubbles in flotation, is applied to two comprehensive flotation surveys in the rougher stages of C3 concentrator, PT Fre
Jan 1, 2007
-
Abrasive and impactive wear of grinding balls in rotary mills
By L. A. Vermeulen, D. D. Howat
New distribution functions are derived to describe the size distribution of grinding elements in ball mils. The formulations are based on the assumption that abrasive as well as impactive interactions
Jan 1, 1986
-
Managing The Study Risk (bcec2d80-a6d7-40d3-8d47-d5d646e10702)
Project evaluation is completed through individual studies covering technical and financial aspects of the mine to market. These studies are completed at various levels of detail depending on where th
Jan 1, 2007
-
A Back To Basics Approach To Mining Strategy Formulation
By P. De Kock
Strategic mine planning is concerned with the decisions that determine the value of the business, while tactical planning deals with the tasks to realize that value. When tasked with formulating a str
Jan 1, 2007
-
Next Generation Project Management In The Platinum Industry
By H. W. Read
The South African platinum industry finds itself in the midst of a rapidly evolving society that is no longer characterized by the apparent stability of the previous decades. The features of this soc
Jan 1, 2006
-
Geostatistical Simulation of a Commercial Polymetallic Nodule Mining Site
By J. -M. Chautru
A geostatistical simulation of a typical mining site for polymetallic nodules in the North Pacific Ocean is presented. This is the first stage in the design of an industrial mining system. Two varia
Jan 1, 1987
-
The Application Of Viscometry To The Hydraulic Transport Of Backfill Material
By P. T. Slatter
The role of viscometers for rheological characterization in the hydraulic transport of solids is discussed, and rheological models and phenomena pertinent to the hydraulic transport of backfill materi
Jan 1, 1988
-
Modern Asset Pricing - A Valuable Real Option Complement To Discounted Cash Flow Modelling Of Mining Projects (33aaf4ac-edd9-4b8a-9f3d-42631f810fa2)
For resources projects with healthy net present value (NPV) and low cash flow volatility, conventional discounted cash flow (DCF) analysis will continue to provide the dominant investment decision-mak
Jan 1, 2007
-
International Rock Excavation Data Exchange Standard: Basis to broaden the use of mine automation and push for new markets
By C. Mueller
Automation of mining operations is pushed by cost pressure and cyclical product prices. However, until now the different types of equipment were not able to communicate electronically with each other
Sep 1, 2001
-
Froth flotation of coal fines: The influence of turbulence on cell performance
By G. A. Matthrsuis, R. N. Morris
The paper identifies two zones in a Leeds flotation cell. The ratio (13)of the dissipative forces and the interfacial tension force acting on a bubble and a solid particle are shown mathematically to
Jan 1, 1988
-
Optimizing Design Capacity and Field Dimensions of Underground Coal Mines
This paper presents a quantitative approach to the problem of determining design capacity and field dimensions of underground coal mines using room- and-pillar mining systems. In evaluating these desi
Jan 1, 1987