Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    RETC 2011 Full Proceedings - RETC2011

    By Victor Romero, Steve Redmond

    All Rights Reserved. Printed in the United States of America. Information contained in this work has been obtained by SME, Inc. from sources believed to be reliable. However, neither SME nor its autho

    Dec 1, 2011

  • SME
    Mining At Aspen

    By Bruce Bryant

    Silver ore was discovered at Aspen in 1879, but the district did not reach full production until 1888 after lawsuits were settled and railroads furnished less expensive transportation to the outside w

    Jan 1, 1982

  • SME
    Geology Of Wyoming's Powder River Coal Field

    By G. B. Glass

    In 1996, 92.5% or 233 Mt (257.4 million st) of coal produced in Wyoming came from the Wyodak coal zone in the eastern Powder River Coal Field. While the mined portions of the zone consist of one to th

    Jan 1, 1998

  • SME
    Underground Mine Air and Strata Temperature Change Due to the Use of Refuge Alternatives

    By M. A. Reyes, L. Yan

    Heat and humidity buildup within refuge alternatives (RAs) may expose occupants to physiological hazards such as heat stress. The Mine Safety and Health Administration (MSHA) regulations require RAs i

    Nov 22, 2019

  • SME
    Modelling Global Nickel Mining, Supply, Recycling, Stocks-in-Use and Price Under Different Resources and Demand Assumptions for 1850–2200 "Mining, Metallurgy & Exploration (2021)"

    By Harald Ulrik Sverdrup, Anna Hulda Olafsdottir

    The long-term supply of nickel to society was assessed with theWORLD7 model for the global nickel cycle, using new estimates of nickel reserves and resources, indicating that the best estimate of the

    Jan 26, 2021

  • SME
    Limestone Marketing In A Changing Economy - The Economic Realities

    By Robert C. Freas

    While on the surface limestone marketing may appear mundane, it has continued to provide a series of challenges beyond the realm normally envisioned with this industry. This paper presents a case hist

    Jan 1, 1981

  • SME
    Hydrothermal activity and first characterization of hydrothermal mineralization and fluids from the Southern New Hebrides Arc (Vanuatu, SW Pacific)

    By Florian Häckel, Ulrich Schwarz-Schampera, Benjamin Bühring, Katja Schmidt, Dieter Garbe-Schönberg, KoschinskyM Andrea

    "The Vanuatu island arc and its adjacent back-arc basins form part of the southern New Hebrides subduction system in the southwestern Pacific Ocean within a triangle defined by the Solomon Islands, Ne

    Sep 1, 2014

  • SME
    Case Study in Monitoring Mining Induced Subsidence Using Photogrammetry and Conventional Surveys

    By Rodger C. Fry

    Underground coal mining has been active within the East Mountain property since the mid 1950's. As a result, coal from two seams has been extracted within large areas allowing surface subsidence

    Jan 1, 1986

  • SME
    Mine Ventilation at Kiruna

    By Lennart Mukka

    The Kiruna Mine in Sweden currently has three ventilation systems. The first two (a new and old system) serve the production areas. The third system is used for the facilities on the former main hau

    Jan 1, 2002

  • SME
    Thermal Exposure Limit in a Simulated Refuge Alternative

    By C. D. Ashley, X. P. Garzon-Villalba, R. M. Lopez, T. E. Bernard

    Federal standards for refuge alternatives (RAs) mandate that they not exceed a Steadman apparent temperature (AT) of 95 °F (35 °C) at an assumedmetabolic rate of 325W, a limit that appears to be arbit

    Nov 8, 2019

  • SME
    Design and Implementation of Solar‑Powered Optical Fiber‑Based Illumination and Communication System for Underground Coal Mines - Mining, Metallurgy & Exploration (2023)

    By Dushasan Kundu, B. N. Shivakiran Bhaktha, Khanindra Pathak, Sarbojit Mukherjee

    Mine safety and quality of life of miner working in underground mines depend to a large extent on mine illumination and communication. The provisioning of reliable, safe, and cost-effective illuminati

    Apr 14, 2023

  • SME
    A century of mining safety and health research A century of mining safety and health research A century of mining safety and health research

    By John A. Breslin

    The year 2010 will mark the 100th anniversary of the beginning of the research efforts by the U.S. government to improve the health and safety of miners working in the United States. This research

    Jan 1, 2010

  • SME
    Bias And Error In Mine Project Capital Cost Estimation

    By J. Bertisen, G. Davis

    Previous analyses of small samples of mining projects have found that feasibility studies tend to well under-estimate the actual capital costs of the project. Our review of 63 mining and smelting pro

    Jan 1, 2007

  • SME
    Optimal Pitwall Shapes to Increase Financial Return and Decrease Carbon Footprint of Open Pit Mines

    By G. ALBORNOZ, S. Utili, A. AGOSTI, C. VALDERRAMA, R. PELL, N. Morales

    The steepness of the slopes of an open pit mine has a substantial influence on the financial return of the mine. The paper proposes a novel design methodology where overall steeper pitwalls are employ

    Feb 9, 2022

  • SME
    Computerized Design Of Comminution Circuits

    By J. A. Herbst

    A state of the art computer simulation package, named UTAH-MODSIM is being developed. This package can run on a mainframe (eg. UNIVAC) as well as on a microcomputer (eg. IBM/PC with at least 512 kByte

    Jan 1, 1986

  • SME
    Reducing The Fire And Explosion Hazards Of Flame Cutting And Welding In Underground Coal Mines - Preprint 09-007

    By W. D. Monaghan

    Flame cutting and welding is one of the major causes of fires and explosions in underground U.S. coal mines. On May 20, 2006, a flame cutting operation at the Darby Mine No. 1 led to an explosion tha

    Jan 1, 2009

  • SME
    Impacts Of Ground Convergence On TBM Performance In Ghomroud Tunnel

    By Ebrahim Farrokh

    Ghomroud water conveyance tunnel project is under construction using shield Tunnel Boring Machines (TBM) for a total length in excess of 50 km. Phase 1 of the project included 36 km of tunnel divided

  • SME
    Low-Rank Coal Ash Characterization- Washability And Utilization Implications – Preprint 97-132

    By P. D. Rao, D. E. Walsh

    Chemical and physical properties of typical low-rank coal (LRC) ash are significantly different than bituminous coal ash. With the exception of extraneous ash, which is incorporated during mining or i

    Feb 24, 1997

  • SME
    Status Of A Reclaimed Mine Site In Colorado After 10 Growing Seasons – Preprint 97-54

    By J. J. Gusek

    Several final pits in the Seneca No. 1 Surface Coal Mine were abandoned in the 1960's without king reclaimed. In addition, a progressive landslide aggravated by the abandoned mine land conditions

    Feb 24, 1997

  • SME
    A Life-Cycle Approach to Coal Resource Analysis: Examples From the Appalachian and Illinois Basins – Preprint 97-25

    By R. C. Milici

    Historical production data and reserve decline rates can be used both to predict future coal production rates and to estimate when the reserve will be depleted. Reserve estimates inferred herein from

    Feb 24, 1997