Bagdad Concentrator Process Control Update
By Peter Amelunxen, Craig Lockhart
Significant effort was made in 2003 and 2004 to upgrade the existing instrumentation and process control infrastructure at the Phelps Dodge Bagdad copper concentrator. Specifically, • cameras were
Jan 1, 2005
-
Dynamic Simulation Of Grinding Circuits As An Aid For The Diagnosis Of Hydrocyclone Malfunction - Preprint 09-100
By C. Bazin
Grinding circuits are operated in the presence of disturbances due to ore changes and equipment malfunctions. One of the challenges faced by the operators is the detection of a disturbance, the identi
Jan 1, 2009
-
Virtual Reality In Mine Training (3eb7dfa5-08f9-4834-9597-81542b7b8eb6)
By R. Unger, L. Mallett
The use of virtual reality (VR) technologies to train miners is an evolving area in research and development. In July 2006, representatives of 14 international organizations met to discuss current VR-
Jan 1, 2007
-
Estimation of Optimum Line of Extraction for Continuous Miner Workings and Development of Continuous Miner Stability Index (CMSI) using 3D Numerical Modeling and Statistical Approach
By Sunil Bodakunta, Sreenivasa Rao Islavath
The abstract highlights the importance of determining the optimum line of extraction in continuous miner workings for improved safety and productivity. The study investigates three extraction techniqu
Apr 28, 2022
-
Characterization of Different Road Dusts in Opencast Coal Mining Areas of India
By L. K. Bandyopadhyay, P. K. Mishra, S. K. Chaulya, R. S. Singh, A. Kumar, N. Tripathi, K. Mandal
A comprehensive field study has been carried out to measure the background air quality status and identify the air pollution sources from opencast mines around a heritage site in India. Air quality mo
Jan 12, 2022
-
Though Not a Record Year, the Coal Industry Performs Well in 1983
By L. Westerstrom
Supply and Demand After a dismal first half, the industry saw a marked improvement in its markets during the final six months of 1983. Domestic consumption was 17.6% higher in the second half of th
Jan 5, 1984
-
Elm Road Generating Station Water Intake Tunnel
By Brendan Reilly, Jon Isaacson, Paul McDermott
Kenny/Shea JV is constructing the water intake tunnel for the new Elm Road Generating Station, a supercritical coal-fired power plant in Oak Creek, Wisconsin, being built by Bechtel Power Corporation.
Jan 1, 2007
-
The Use Of Radiotracer Techniques In The Development Of A Phenomenological Model For Continuous Flotation Processes
By R. P. Gardner
Results of work on the development of a phenomenological model for the continuous flotation process using short-lived radioactive tracer techniques for the determination of model parameters is reporte
Jan 1, 1985
-
Geochemistry of ilmenite and applications to ilmenite provenance and Ti-mineral exploration
By Antonio Pineda, Roger K. McLimans, Felicity E. Lloyd
lmenite is a primary ore feed to the DuPont chloride process for the manufacture of titanium diox-ide pigment. We seek to determine ilmenite geochemistry as a function of original source and as-certai
Jan 1, 2005
-
Incorporating Cycle Time Dependency In Truck-Shovel Modeling
By A. Anani
The need to optimize surface mining operations has led to the use of discrete event simulation (DES) modeling of truck-shovel systems. Often, these models assume truck cycle times are independent and
Feb 27, 2013
-
The Madrid Renewal Inner Ring Calle 30 with the Largest EPB Machines—Planning and Results
By Enrique Fernandez
M-30, Madrid’s inner ring, covers 42 sq km of the city centre where one million people reside. It was constructed in several phases during the sixties and the eighties. The design criteria applied to
Jan 1, 2007
-
Pump And Cyclone Design/Optimization To Maximize Grinding Circuit Efficiency
The design/optimization of the pump and cyclones to maximize grinding circuit efficiency first requires a concise understanding of, and clearly defined specifications for, desired grinding circuit per
Jan 1, 2011
-
Site Specific Blasting Model For Mine-To-Mill Optimization
By K. M. Kim
A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in-situ block size (F80), the post-blast fragmentation (P80) and the intact tensile
Jan 1, 2011
-
Engineered Pumpable pHoam?: A New Innovative Method For Mitigating Ard
If one can embrace the medical analogue, much of the mining industry currently suffers from a massive bacterial infection. When pyrite-bearing or sulfide-bearing rock formations, tailings, or mine was
Jan 1, 2012
-
History And Development Of Aeration In The Cerro Verde Mine
By G. Velarde
This paper presents the metallurgical results of column and stockpile leach tests with forced aeration to determine the usefulness of this process in the operational leaching at Sociedad Minera Cerro
Jan 1, 2006
-
Autogenous Grinding At Rana Mines
By Olav K1omstad1ien
The lean, but extensive iron ore deposits of the Dunderland Valley north of Mo i Rana, Norway, is the raw material for the Rana Mines which is a division of the state owned steel mill A/S Norsk Jernve
Jan 1, 1978
-
Evaluating Underground Mining Hazards By Fuzzy FMEA
By S. K. Oraee
Managers always look for systems with minimum hazards. The hazards create problems for performance of projects. The largest and most important hazards of working underground mine can be related to he
Jan 1, 2011
-
Mineral Resources and Land Use Planning Conflicts in Norway
By K. Nielsen
The paper presents a brief overview of the mineral industry in Norway, followed by a description of the mineral policy and relevant legislation including the roles of the Norwegian Directorate of Mini
Jan 1, 2005
-
Hindsight Is 20/20?Reverse Engineering Tunnel Risk Analyses
By Lee W. Abramson
Performing risk analyses on tunnel projects has become common place and on many projects it is required from an owner or regulatory perspective. After the project is planned, designed and constructed,
-
Ventilation System Operating Cost Comparison Between A Conventional And An Automated Underground Metal Mine
By C. K. Kocsis, S. Hardcastle
Mine ventilation, requires electricity to operate the fans and fossil fuel for heating. Typically, this accounts for approximately 40% of the overall underground energy consumption. This is considerab