Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Port Authority Of Alleghany County North Shore Connector Project Tunnels And Station Shell Case History Contracts 003 And 006

    By Paul Zick

    The Port Authority of Allegheny County North Shore Connector (NSC) Project involves TBM excavation of twin 690 m (2,240 lf) precast segment lined light rail tunnels through soil and rock under the All

  • SME
    Economic Factors Of Industrial Minerals Production ? Introduction

    By A. E. J. Gallagher

    There are many influences which have a bearing on the economics of industrial minerals production. The purpose of this paper is to discuss briefly three factors which have economic significance in the

    Jan 1, 1984

  • SME
    Port of Miami Tunnel Study: Bored or Immersed Tubes?

    By Eldon L. Abbott, Rebecca K. Bolan

    The Florida Department of Transportation, Florida’s Turnpike Enterprise is studying the feasibility of a 1128 meter (3,700 foot) vehicular tunnel to provide direct access for Port of Miami traffic to/

    Jan 1, 2005

  • SME
    Small Diameter Tunneling?Pipe Jacking Under Leipzig Main Train Station

    By Klaus Rieker

    The main train station of Leipzig in Germany is currently being upgraded from a head station to a partially thru station. In order to achieve this, significant ground improvements are necessary. Soil

    Jan 1, 2008

  • SME
    Digital Assessment of Northern and Central Appalachian Basin Coals

    By Leslie F. Ruppert

    The US Geological Survey (USGS) is currently conducting a coal resource assessment of the coalbeds and zones that are projected to provide the bulk of the nation’s resources for the next few decades.

    Jan 1, 1999

  • SME
    Field Evaluation Of The Coal Dust Explosibility Meter (CDEM) (d49e1078-3f23-4b51-b4d8-ee07d3406528)

    By M. L. Harris

    In underground mines, coal dust explosions are prevented by the addition of rock dust sufficient to render the coal dust inert. The National Institute for Occupational Safety and Health (NIOSH) develo

    Jan 1, 2008

  • SME
    The Candelaria Concentrator Expansion Project

    By D. L. Ogonowski, J. O. Marsden

    The Candelaria copper-gold mine is located approximately 25 km south and east of Copiapo in Region III, Chile. The original concentrator was designed to treat 28,000 t/d (30,800 stpd) of chalcopyrite

    Jan 1, 1999

  • SME
    Technical And Commercial Benefits Of Gearless Mill Drives For Grinding Applications

    By M. Ahrens, J. Gonser

    Gearless mill drives are a well established solution for grinding applications in the minerals and mining industries. The paper describes the functionality and technical features of such drive systems

    Jan 1, 2007

  • SME
    Geology of the Brewer Gold Mine in South Carolina

    By W. Scheetz

    The Brewer Gold Mine is an open-pit, heap leach operation that processes about 122 kt/m (135,000 stpm). The mine is operated by Brewer Gold Inc., a subsidiary of Westmont Mining Inc., and is located n

    Jan 1, 1991

  • SME
    AUV- and ROV-based exploration of active and inactive seafloor massive sulfide deposits at the Semyenov and Irinovskoe sites on the Mid-Atlantic Ridge

    By J. W. Jamieson, J. Escartin, A. Steinführer

    Evidence of hydrothermal activity on two Mid-Atlantic Ridge oceanic core complexes (OCCs), at 13º30’N (the Semyenov 1 through 5 fields) and 13º20’N (the Irinovskoe field) (Fig. 1) were studied using C

    Sep 1, 2014

  • SME
    Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration - Springer

    By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer

    Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph

  • SME
    Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration

    By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer

    Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph

  • SME
    Corporate social responsibility within the mining industry: case studies from across Europe and Russia

    By E. A. Adey, C. Baciu, P. Whitbread-Abrutat, M. Varul, T. Ejdemo, R. K. Shail, F. Wall

    Responsible mining requires stakeholder engagement throughout all operational stages and after mine closure. By assessing the current and anticipated future socio-economic and environmental impacts, a

    Jan 1, 2011

  • SME
    Using lean six sigma techniques for projects at a Canadian uranium mine, mill

    By S. G. Britton

    "Strategies to improve performance in mining production, maintenance and mineral processing operations have evolved over time from straightforward time studies of individual machine performance in the

    Nov 1, 2016

  • SME
    Crud Processing Improvements Using ACORGA® CB - 1000 Crud Busting Reagent

    By T. McCallum

    Crud is a common concern in SX processes and is formed as a complex solid stabilized emulsion of aqueous and organic.1,3 Crud formation is highly dependent on the amount of solids entering the circuit

    Feb 27, 2013

  • SME
    A Speacil Report China's Emerging Mining Industry - A Long March Towards Modernization

    By K. P. Wang, Ta M. Li

    The Chinese energy and mineral industries are readying themselves for a period of dynamic transition, unprecedented in the country's long and sometimes turbulent history. The transition comes as

    Jan 3, 1980

  • SME
    Construction And Geological Engineering Of An Underground Ore Bin

    By J. F. T. Agapito, G. P. Bratton

    A 16 m by 4.7 m by 24.5 m (52 ft by 15.5 ft by 80.5 ft) underground ore bin was constructed at an 810 m (2660 ft) overburden depth in poor quality, faulted and altered intrusive rocks at Molycorp&apos

    Jan 1, 1985

  • SME
    Super Cycle: The Future

    By Douglas B. Silver

    Super Cycle future The final topic is mining?s future. The most important questions are ?How much longer is the Super Cycle going to last? What should we expect to see going forward? How will the Sup

    Jan 1, 2008

  • SME
    Practical Optimization Strategies for Coal-Washing Plants – Preprint 97-70

    By R. P. King

    The MODSIM mineral processing plant simultor is used to find optimal combinations of target separation specific gravities in a typical modem coal washing plant. A plant that is set up with these optim

    Feb 24, 1997

  • SME
    Maintenance Contract on Cat 785 Trucks Works Well at Round Mountain

    By J. B. Rasmussen

    As part of a purchase of a fleet of Caterpillar 785 trucks, Round Mountain Gold Corp., Cashman Equipment Co. and Caterpillar Inc. entered into a four-year contract for the major maintenance of the fle

    Jan 1, 1991