Issues Related To Selection, Design Optimization, And Performance Prediction Of Tunnel Boring Machines (TBM) For Mining ApplicationsBy Jamal Rostami
With the recent technological advances; Tunnel Boring Machines (TBM) have become a viable economic alternative to drill and blast in hard rock excavation. These machines are finding increasing use in
Jan 1, 1997
-
Slope Stability In Dragline Stripping OperationsBy J. L. Workman
The stability of spoil and highwall slopes are important to successful strip mining. This paper discusses soil parameters of importance in stability analysis. The common mechanisms of spoil failure ar
Jan 1, 1996
-
The Development And Commercialization Of The Hicom High Intensity Grinding Mill (edb9c907-4f44-4787-9b35-11f12e176296)By T. A. E. Breen
A new high intensity grinding technology has been developed and is now being commercialized by Hicom International of Australia. This has led to the development and manufacture of Hicom 120 grinding m
Jan 1, 1999
-
The Role Of Virtual Reality In Safety Training Of Mine PersonnelBy B. Denby
Recent advances in Virtual Reality (VR) technology have resulted in major opportunities to improve safety training of mine workers, supervisors and managers. The hazardous nature of both surface and u
Jan 1, 1998
-
Innovative Rehabilitation of Existing Tunnels under Minimum Impact on OperationBy A. G. Nitschke, I. Ossenbühl, W. Dolsak, J. Dase
"The authors have successfully developed an innovative rehabilitation concept, which meets actual technical standards and minimizes the impact on the operation of a key conveyor tunnel. A flexible and
Jan 1, 2015
-
Synchronous Electric Drives For Grinding MillsBy M. Ploc
The grinding process in the mining industry has seen an increased throughput to accomplish greater production and lower overall production costs. Up to 8-9 MW, a single motor can be connected to dri
Jan 1, 2010
-
Massive Pillar Collapses in U.S. Underground Limestone Mines: 2015–2021By Gregory M. Rumbaugh, Todd Kostecki, Christopher Mark
From 2015 to 2021, five massive pillar collapses occurred at four underground stone mines in the eastern United States. These events resulted in powerful airblasts that damaged mine infrastructure and
-
Applied Geology: The Foundation For Mine Design At Exxon Minerals Company's Crandon DepositBy R. G. Hite, R. G. Rowe
The Crandon deposit, located in northern Wisconsin, is a 65.8 million ton Precambrian volcanogenic massive sulfide deposit which averages 1.4% copper and 5.8% zinc. The deposit is classic in origin, m
Jan 1, 1992
-
Characteristics of the Clay-based GroutsBy Yu. A. Polozov, V. A. Lagunov, O. Yu. Lushinkova, Yu. I. Svirskiy, Eh. Ya. Kipko, Roy A. Williams
4.1 THE GENERAL COMPOSITION AND PROPERTIES OF CLAY-BASED GROUTS Clay-based grouts are visco-plastic systems; they are made by adding structure-forming reagents to a clay mineral mortar. Small amounts
Jan 1, 1993
-
Sublevel Caving at Craigmont Mines Ltd.By R. A. Basse, W. D. Diment, A. J. Petrina
INTRODUCTION In 1957, diamond drilling on a magnetic anomaly indicated an extensive zone of copper mineralization on what is now the Craigmont Mines property. By mid¬1958, drilling established a copp
Jan 1, 1982
-
Cut-and-Fill at the Bruce MineBy Keith E. Dyas, John Nelson, Ronald T. Johnson
GENERAL DESCRIPTION The Bruce mine of Cyprus Mines Corp. is located in Bagdad, AZ. The mining method used is open cut-and-fill. Of the annual production of 81 647 t (90,000 st), approximately 83% i
Jan 1, 1982
-
Adaptation of Surface Mining Machines to Underground MiningBy W. A. Haley
The use of diesel engines in underground hard-rock mines dates back to the late 1940s. For the first several years, they were used only occasionally, being limited to a few metal mines that experiment
Jan 1, 1982
-
Discussion - Flotation Of Boron Minerals - Celik, M. S., et alBy M. R. Yalamanchili, J. D. Miller
Discussion by M.R. Yalamanchili and J.D. Miller The authors, M. S. Celik et al., should be recognized for their efforts to describe the flotation behavior of boron minerals. In the case of borax an
Jan 1, 1995
-
Continuous Improvements In Mine Ventilation And Fire SimulationBy Rudolf E. Greuer
Modeling a mine ventilation system is a formidable mathematical problem requiring the solution of twice as many equations as there are airways with half of these being quadratic equations. The additio
Jan 1, 1994
-
Raise ClimbersBy Hans Svensson
INTRODUCTION The Alimak method of raising (Fig. 1) was intro¬duced in 1957. Because of its flexibility, economy, and speed, it soon became the most used system of raising in the world. With the sam
Jan 1, 1982
-
Trail Mountain Mine: A Case Study For Improving Locations Of Mining-Induced Seismicity With Double-Difference RelocationBy Eleanor Sonley
In October 2000, temporary seismographic stations were installed above the Trail Mountain Mine, Emery County, Utah, USA to supplement a regional network. Over seven months, 1826 mining-induced seismi
Jan 1, 2009
-
3D Dynamic Simulation Of Reinforced Concrete Seals For 120 Psi Design StandardBy R. Reddy Kallu
Prior to July 2007, the only accepted method by MSHA for evaluating the mine seal design and performance is the full-scale explosion tests conducted in the NIOSH?s Lake Lynn Experimental Mine (LLEM) f
Jan 1, 2009
-
Top Coal Failure Mechanism Of Extremely Thick Seam In Top Coal Caving MiningBy Nan Hua
As a high production and high efficient mining method, top coal caving method is now widely used in China. However, as more extra-thick coal seams are mined, it becomes more and more difficult to make
Jan 1, 2009
-
Applying Fly Ash as a High Strength Water-Resistant Precast Construction Material through GeopolymerizationBy Q. Feng
Study has been carried out to apply fly ash as a high strength, water-resistant precast construction material through geopolymerization. Experiment results show that the working conditions such as wat
Jan 1, 2019
-
Calibrating Numerical Model For Room-And-Pillar Coal Mining Simulation In Weak Immediate Roof Based On In-Situ TestsBy Andre C. Zingano
It is a very difficult task to estimate the immediate roof and support behavior in a room-and-pillar mining section in the initial phase of the mining project. There is little information available at