Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Key Components For An Effective Filtration And Pressurization System To Reduce Respirable Dust In Enclosed Cabs For The Mining Industry
By A. B. Cecala
Enclosed cabs have been used for many years to isolate workers on mobile equipment in the mining industry for health and safety reasons. These enclosed cabs create a microenvironment for workers where
Feb 27, 2013
-
Extruded Concrete Lining—The Future Lining Technology for Industrialized Tunnelling
By Siegmund Babendererde, Jan O. Babendererde
Extruded Concrete Lining combines technological and financial advantages. The tunnel lining is reliably embedded in the surrounding ground as the fluid concrete is extruded at constant pressure direct
Jan 1, 2001
-
2. Drill-Hole Data Management and Display ? Introduction
By Richard A. Bideaux
With both unit costs per meter and average depth of drilling constantly increasing, there is a strong incentive to maximize the information acquired from drill holes, and then to make this information
Jan 1, 1979
-
Out of the Comfort Zone: Quantifying Country Risk for Foreign Mining Project Investment Feasibilities - Mining, Metallurgy & Exploration (2021)
By MATT RENAUD, Mustafa Kumral
As high-quality mineral deposits are thoroughly exploited, mines of the future will have to move towards more remote and lower quality projects. With these projects comes an increased business risk to
Sep 30, 2021
-
Investigative Programs for Designing and Modeling Mine Water Control Systems
By Marvin V. Damm, Lloyd C. Venburg, Dan Sokol
Analytical and computer models are used to evaluate information obtained from existing data and investigation programs so mine water control systems can be designed and developed. These models allow t
Jan 8, 1982
-
Direct Measurement And Control Of Sag Volumetric Loads Using Embedded Sensors
By A. Vien
Over the past several years, Svedala has developed a continuous charge monitor (CCM) for tumbling mills. It consists of a strain gauge embedded into a rubber lifter and associated electronics. This pa
Jan 1, 2001
-
Pit Lake Water Quality In The Western U.S.: Unifying Concepts
By A. Davis
Pit lake chemistry depends on the lithology and hydrologic characteristics of the ultimate pit surface, the availability of buffering capacity in the wall rock versus oxidizable sulfide content, and t
Jan 1, 1996
-
The Cadia Gold Copper Project Exploration To Start Up
The Cadia Mine is located 25kms South West of Orange in the central west of New South Wales (NSW), Australia (Figure 1). Orange is a major regional centre with a population of 35,000 people. Cadia has
Jan 1, 1999
-
Current State Of Disc Cutter Design And Development Directions
By Joe Roby
Rolling disc cutters are the business end of hard-rock and mixed-face tunnel boring machines (TBMs). Since their first successful employment on a TBM more than 50 years ago, disc cutter technology ha
Jan 1, 2009
-
Novel Passive Technology For Entrained Air Measurement In Pipes And Gas Holdup Measurements In Column Cells
By C. Keefe, O&apos
Measurements of the quantity of entrained air within processes have challenged instrumentation developers for years. This is particularly true in the unique and demanding operating environment and ap
Jan 1, 2008
-
Electrical Accidents In The Mining Industry, 1990-1999 (a667b09a-202f-425d-9b08-95e0dee3b098)
By J. C. Cawley
This National Institute for Occupational Safety and Health study was conducted to focus future research on the most significant electrical problems in the mining industry. Data from 1,926 mine electr
Jan 1, 2002
-
Risk Management For Mining Industry Operations - Risk Management Overview
By S. E. Younis
The mining industry is currently looking to better understand, anticipate, and be able to mitigate business and operational risks in order to deliver the rewards of risk taking, and to minimize the fr
Jan 1, 2012
-
Government Minerals Policy Assailed at AMC Conference
"Lax, misguided, and dangerous" is Rep. James Santini's description of the official US position on strategic nonfuel minerals. Santini (D-NV), chairman of the House Mines and Mining Subcommittee,
Jan 11, 1980
-
Austrian Method Of Tunnel Building In Very Heavily Squeezing Ground In Mountainous Terrain Theory And Practice
By Horst Pöchhacker
The largest structure along the Tauern highway section between Salzburg and Villach is the 6.4-km-long Tauern Tunnel. The major geotechnical problems that came up surprisingly while driving the headin
Jan 1, 1976
-
Earthquake Response Of Caverns: Empirical Correlations And Numerical Modeling
Tunnel damage from explosion and earthquake excitation is correlated with strain and particle motions. Critical strains and motions are then correlated with focal distance, which is so small that perm
Jan 1, 1985
-
Construction of a Low Rock Cover Cavern for the Neutrinos at Main Injector Facility
By Bhaskar B. Thapa, Christopher Laughton, Michael P. Bruen
At Fermilab, located in Batavia, Illinois, a 4,000-foot underground complex of tunnels and caverns is being excavated on a decline of six percent, at depths of up to350 ft, below grade. The site geolo
Jan 1, 2001
-
Rochester Mine Reaches 100 Million Ounces of Silver Production
The Coeur Rochester Mine is one of the largest and lowest cost primary silver mines in the United States. In January, the mine surpassed 3.1 kt (100 million oz) of historic silver production. Rochest
Jan 1, 2004
-
Determination Of Volumetric Changes From Laser Scanning At An Underground Limestone Mine
By B. Slaker
The ability to detect and quantify ground movements in underground mine workings is of the utmost importance to the safety of miners and continuity of operations. Rib sloughage is one of the most comm
Feb 27, 2013
-
Cutoff Grade Optimization (PREPRINT NUMBER 93-247)
By K. Dagdelen
The definition and shortcomings of traditional cutoff grades are discussed. The concept of optimum cutoff grade policy which maximizes the Net Present Value (NPV) of annual cash flows coming from a mi
Jan 1, 1993
-
Metallurgical Development And Design For The Pascua Lama Project
By R. A. Williams
The Pascua Lama Project is situated on the border of Chile and Argentina at an elevation of 4,800 m. The ore contains gold, silver and copper, and an initial milling production rate of 33,000 t/d is
Jan 1, 2001