Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    On Rock Failure Criteria for Coal Measure Rocks

    By Murali Gadde

    Design of underground excavations in coal mines involves two major tasks: estimation of stresses and determination of rock mass strength. Owing to the complicated nature of rock mass, progress in its

    Jan 1, 2007

  • SME-ICGCM
    Improvements in Long Tendon Support with Pumpable Resin

    By Tom Meikle

    Long tendon support systems provide several challenges when used in-cycle as part of the secondary or primary support cycle. A two-component pumpable resin, Carbothix, has been in development for use

    Jan 1, 2012

  • SME-ICGCM
    Rock Mechanics Investigations on Seismic Events Around Two Longwall Coal Operations

    By Michael Alber

    Coal mining by the longwall method typically causes seismic events. This paper describes the research on mining induced seismicity around two specific longwalls at 1100m depth under several old longwa

    Jan 1, 2008

  • SME-ICGCM
    Cavability Study Of A Competent Roof - A Case Study

    By T. N. Singh

    An evaluation was made on the cavability of the roof formation of Dishergarh seam including caving sequence, caving span, and load on powered support.

    Jan 1, 1994

  • SME-ICGCM
    Mining Method For Extracting An Eight Metre Coal Horizon Containing A Sandstone Layer

    By Freddie Hunter

    An underground mining method for extracting an eight metre (26') coal horizon, containing a sandstone layer. A decrease in the thickness of the rock strata between the number two and number th

    Jan 1, 2003

  • SME-ICGCM
    Roofbolting In The Cape Breton Development Corporation's Phalen Colliery

    By B. Macdonald

    In 1991, roofbolts were introduced as a primary support for inseam retreat longwall entries at CBDC's Phalen Colliery. Increasing mine depth (+550 m) necessitated replacing conventional inseam st

    Jan 1, 1994

  • SME-ICGCM
    The Prediction of Pillar Interaction Effects for Deep Multi-Seam Workings

    By Lightfoot. Nicholas, Na Liu

    "Mining in multi-seam workings has been undertaken for many years in the VK Remnant pillars above and/or below current working areas have an important influence on retreat gateroad conditions at five

    Jan 1, 2010

  • SME-ICGCM
    Supporting Method of the Bolted Strata in Large Deformation Roadways

    By Shuangsuo Yang

    Based on field observations and physical modeling of simulated materials, the dynamic equilibrium principle on the whole interaction process between the surrounding rocks and support of large deformat

    Jan 1, 2005

  • SME-ICGCM
    A Retrospective Assessment of Longwall Roof Support with a Focus on Challenging Accepted Roof Support Concepts and Design Premises

    By Thomas M. Barczak

    The era of the shield-supported longwall face began in the United States a little over 25 years ago. The most fundamental development of the shield in the past 25 years has been an increase in size a

    Jan 1, 2006

  • SME-ICGCM
    Fully-Grouted, High-Strength, Mechanical Shell Tensioned Bolt Improves Pittsburgh Seam Primary Roof Support

    By Daniel Su

    Approximately 90% of the primary roof bolts used in CONSOL?s Pittsburgh seam coal mines is 2-piece, 8-foot long, 7/8? (or ¾?), high-strength, resin assisted, mechanical shell tensioned bolt. The remai

    Jan 1, 2007

  • SME-ICGCM
    Design Of Longwall Extractions Under Flooded Abandoned Workings In The Sydney Coalfield

    By Peter Cain

    Longwall extraction in the Phalen Scam in the Sydney Coalfield of Nova Scotia is carried out under flooded abandoned workings in the Harbour Seam 140 m above, and at depth of up to 700 m beneath the A

    Jan 1, 1996

  • SME-ICGCM
    Detailed Stress Analysis of Longwall Panels

    By Khaled Morsy

    In the past two decades, high horizontal stress has been attributed to many ground control failures. Most believe that entries parallel to the high horizontal stress is most stable and least stable wh

    Jan 1, 2006

  • SME-ICGCM
    Innovative Tailgate Support For Heavy Ground: 11 Left Longwall Panel, Cyprus Shoshone Mine

    By Christopher C. Woomer

    Cyprus Shoshone Mine uses the longwall method to extract a deep, thick, pitching coal seam in the Hanna Basin of South Central Wyoming. The immediate, and main roof rock consists of weak, thinly-bedde

    Jan 1, 1995

  • SME-ICGCM
    Roof Stability Issues in Underground Limestone Mines in the United States (c7025d3b-53e9-40eb-abd5-d6a28b7f51f3)

    By Gabriel Esterhuizen

    The room-and-pillar mining method is used extensively in underground limestone mines in the Eastern and Midwestern U.S. The rock mass is typically a near-horizontal, bedded deposit at relatively shal

    Jan 1, 2007

  • SME-ICGCM
    3-D Discontinuum Numerical Modeling of Rock Mass Stability Investigations Due to Ore Extraction and Backfilling, and Subsidence Estimation for an Underground Mine

    By Srisharan Shreedharan, Gang Huang, Hongqing Song, Sijing Cai, Pinnaduwa H. S. W. Kulatilake

    "Subsidence prediction due to ore extraction and backfilling during open stoping operations for an underground iron mine in China is reported in this paper. Geologic complexities including faults and

    Jan 1, 2016

  • SME-ICGCM
    An Improved Technique of In-Situ Measurement Of Fracture Zones Surrounding Gateroads

    By B. G. D. Smart

    An understanding of the nature of yield zones surrounding coal mine excavations is fundamental to the design of mine support systems. Various methods have been designed for investigation of undergrou

    Jan 1, 1984

  • SME-ICGCM
    New Approach in Rock Bolting that Adds to Bearing Capacity and Yield of the Bolts without Increase to the Cost of the Technology

    By Victor Nazimko

    A new technique for reaming the holes has been tested. This technique is available for reaming a hole at its deep end creating an enlarged cavity that has helicoidal grooves oriented at less than 40 d

    Jan 1, 2008

  • SME-ICGCM
    Roof Span Design for Underground Stone Mines

    By Essie Esterhuizen, John Ellenberger, Dennis Dolinar

    "Underground stone mines in the United States use the room-and- pillar method of mining. The stability of the roof between pillars determines the mining dimensions and size of equipment that can be us

    Jan 1, 2010

  • SME-ICGCM
    Coal Mine Bumps: Case Histories of Analysis and Avoidance

    By David Newman

    In Eastern Kentucky, the Darby seam has had an extensive history of coal bumps and pillar bursts. The combination of high overburden, strong rock and coal, subjacent and superjacent mines, and retrea

    Jan 1, 2008

  • SME-ICGCM
    Prediction of First Weighting Distance in Longwall Coal Mining By 3D Numerical Modeling ? A Case Study

    By Haile Manteqi

    In longwall coal mines, estimation of roof strata condition, sequence of loading, and supporting requirements are of a high degree of importance, and they are directly related to production and safety

    Jan 1, 2012