Search Documents

  • NIOSH
    Appendix D - Methods For Controlling Respirable Coal Mine Dust From Overburden Drilling At Surface Coal Mines - D.l Engineering Controls

    Engineering controls for overburden drilling include dry dust collection systems, wet dust suppression systems, and enclosed cabs [Zimmer and Lueck 1986; Volkwein et al. 1979]. Proper maintenance of t

    Jan 1, 1997

  • NIOSH
    Appendix D - Shuttle Car - Weighing Experiment

    By Thomas V. Falkie, R. Venkataramani

    Hand portable truck axle scales were purchased from the Martin¬Decker Company, Santa Ana, California, for weighing the rubber-tired mine shuttle cars. The scales consisted of two hydraulic load-pads,

    Jan 1, 1972

  • NIOSH
    Appendix D - USBM Method Program Output

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    TEST DECK – ALTMETER SURVEY WITHOUT PLTTMETER TEMPERATURE CCRRECTION DATA INPUT

    Jan 1, 1977

  • NIOSH
    Appendix E - Equipment Used For Field Testing Of Mine Sealing System

    By David A. Monaghan, Kenneth R. Maser, Adi R. Gurdar, D. Randolph Berry

    APPENDIX E EQUIPMENT USED FOR FIELD TESTING OF MINE SEALING SYSTEM I. Drilling Operation - Equipment supplied by local drilling contractor 1. Mobile drill rig. 2. Flat bed truck, containing 2

    Jan 1, 1973

  • NIOSH
    Appendix E - Refuge Chamber Leakage Analysis

    By David Hoadley, Kenneth R. Maser, Ashok B. Boghani, James E. Billar, D. Randolph Berry, Mackenzie Burnett, Robert H. Trent

    APPENDIX E REFUGE CHAMBER LEAKAGE ANALYSIS Variables p 0 = pressure outside of chamber (psi) p = pressure inside of chamber (psi) i q = leakage flow rate (cfm) Q= total leakage (cu ft. ) V

    Jan 1, 1976

  • SME
    Appendix E - Unsaturated Flow

    By Dale R. Ralston, Roy E. Williams, Gerry V. Winter, George L. Bloomsburg

    The term unsaturated flow refers to the conditions in which soil pores are filled partially with water and partially with air. This situation constitutes a porous material filled with immiscible fluid

    Jan 1, 1986

  • NIOSH
  • SME
    Appendix F - Simulation Summaries of the Uranium and Lead Mines

    By Dale R. Ralston, Roy E. Williams, Gerry V. Winter, George L. Bloomsburg

    Jan 1, 1986

  • NIOSH
    Appendix F – Free Read Program For PSU/MVS

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    THIS PROGRAM TRANSFORMS FREE FORHATED BRANCH DATA INTO A FORMAT SUITABLE FOR INPUT TO THE PENNSYLVANIA STATE UNIVERSITY MINE VENTILATION SIMULATOR (PSU/HVS 1. BRANCH RESISTANCES ARE ASSUMED TO H

    Jan 1, 1977

  • NIOSH
    Appendix G - Table Ix - Mine A

    By David Hoadley, Kenneth R. Maser, Ashok B. Boghani, James E. Billar, D. Randolph Berry, Mackenzie Burnett, Robert H. Trent

    APPENDIX G TABLE IX MINE A 1 General Total Employees 3000 Maximum No, of Men Underground/Shift 800 Shifts/Day 3 Type of Ore Copper Daily Production (TPD) 25,000 Mining Method Room and Pillar

    Jan 1, 1976

  • NIOSH
    Appendix G – Input Data fort initial Simulation

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    1 9 THIS IS A DIGITAL COMPUTER SIMULATION OF THE VENTILATION SYSTEM OF A MINE LOCATED IN WASHINGTON COUNTY; PENNSYLVANIA. THE VENTILATION SURVEY ON WHICH THIS SIMULATION IS BASED WAS RUN FROM OCT. 27

    Jan 1, 1977

  • NIOSH
    Appendix H – Computer Output for Initial Simulation

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    MINE VENTILATION NETWORK ANALYSIS

    Jan 1, 1977

  • NIOSH
    Appendix I - Cost Analysis System

    By R. V. Ramani, V. T. Burgos, J. A. McClay

    Introduction The Cost program was developed to provide the planning engineer with a tool to evaluate the cost implications of the technical mine design decisions. Direct costing methods are empl

    Jan 1, 1975

  • CIM
    Appendix I - The Art of Creating a Financially Rewarding Royalty

    By Craig Haase

    A. Introduction

    Jan 1, 2003

  • NIOSH
    Appendix I – Computer Program Listing

    By R. V. Ramani, C. B. Manula, A. Owili-Eger

    • MINE VENTILATION NETWORK PROBLEM (NATURAL SPLITTING; FIXED • QUANTITY BRANCHES; METHANE SIMULATION; NETWORK TOPOLOGY REVISION; • ABSOLUTE PRESSURE) • NFIXB = NO. OF FIXED QUANTITY BRANCHES • DD(

    Jan 1, 1975

  • NIOSH
    Appendix II – Model Verification Test I

    By R. V. Ramani, V. T. Burgos, J. A. McClay

    The data for Test I describes an underground bituminous coal mine operation in a 48 inch seam, with an estimated production rate of 1,056,000 tons per year. The system includes four continuous mining

    Jan 1, 1975

  • NIOSH
    Appendix II – Part I to Part IV - Each part contains the input, output, and a schematic showing the flows from computer solutions

    By R. V. Ramani, C. B. Manula, A. Owili-Eger

    PART 1 THE INPUT AND OUTPUT DATA AND THE MINE SCHEMATIC SHOWING THE FLOWS FROM COMPUTER SOLUTIONS FOR APPLICATION I

    Jan 1, 1975

  • NIOSH
    Appendix III - Analytical Pressure - Volume Computations For The Mine Prototype

    By R. V. Ramani, C. B. Manula, A. Owili-Eger

    ANALYTICAL PRESSURE - VOLUME COMPUTATIONS FOR THE MINE PROTOTYPE A new coal mine is projected, with entrance by slope 1,500 feet long. Nine main entries will be standard for development, five as in

    Jan 1, 1975

  • CIM
    Appendix III - Joint Venture Agreement Table of Contents, Annotated

    By Karl J. C. Harries

    "The Table of Contents that follows is only an example and is the Table of Contents from an actual negotiated agreement. It is merely intended to show how an agreement might be set out and the nature

    Jan 1, 2003

  • NIOSH
    Appendix III – Model Verification Test II

    By R. V. Ramani, V. T. Burgos, J. A. McClay

    The data for Test I1 describes an underground bituminous coal mine operating in a 72 inch seam, with an estimated production rate of 4,257,000 tons per year. The system includes 15 continuous mining s

    Jan 1, 1975