Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Appendix D - Methods For Controlling Respirable Coal Mine Dust From Overburden Drilling At Surface Coal Mines - D.l Engineering ControlsEngineering controls for overburden drilling include dry dust collection systems, wet dust suppression systems, and enclosed cabs [Zimmer and Lueck 1986; Volkwein et al. 1979]. Proper maintenance of t
Jan 1, 1997
-
Appendix D - Shuttle Car - Weighing ExperimentBy Thomas V. Falkie, R. Venkataramani
Hand portable truck axle scales were purchased from the Martin¬Decker Company, Santa Ana, California, for weighing the rubber-tired mine shuttle cars. The scales consisted of two hydraulic load-pads,
Jan 1, 1972
-
Appendix D - USBM Method Program OutputBy R. V. Ramani, R. Stefanko, G. W. Luxbacher
TEST DECK – ALTMETER SURVEY WITHOUT PLTTMETER TEMPERATURE CCRRECTION DATA INPUT
Jan 1, 1977
-
Appendix E - Equipment Used For Field Testing Of Mine Sealing SystemBy David A. Monaghan, Kenneth R. Maser, Adi R. Gurdar, D. Randolph Berry
APPENDIX E EQUIPMENT USED FOR FIELD TESTING OF MINE SEALING SYSTEM I. Drilling Operation - Equipment supplied by local drilling contractor 1. Mobile drill rig. 2. Flat bed truck, containing 2
Jan 1, 1973
-
Appendix E - Refuge Chamber Leakage AnalysisBy David Hoadley, Kenneth R. Maser, Ashok B. Boghani, James E. Billar, D. Randolph Berry, Mackenzie Burnett, Robert H. Trent
APPENDIX E REFUGE CHAMBER LEAKAGE ANALYSIS Variables p 0 = pressure outside of chamber (psi) p = pressure inside of chamber (psi) i q = leakage flow rate (cfm) Q= total leakage (cu ft. ) V
Jan 1, 1976
-
Appendix E - Unsaturated FlowBy Dale R. Ralston, Roy E. Williams, Gerry V. Winter, George L. Bloomsburg
The term unsaturated flow refers to the conditions in which soil pores are filled partially with water and partially with air. This situation constitutes a porous material filled with immiscible fluid
Jan 1, 1986
-
-
Appendix F - Simulation Summaries of the Uranium and Lead MinesBy Dale R. Ralston, Roy E. Williams, Gerry V. Winter, George L. Bloomsburg
Jan 1, 1986
-
Appendix F – Free Read Program For PSU/MVSBy R. V. Ramani, R. Stefanko, G. W. Luxbacher
THIS PROGRAM TRANSFORMS FREE FORHATED BRANCH DATA INTO A FORMAT SUITABLE FOR INPUT TO THE PENNSYLVANIA STATE UNIVERSITY MINE VENTILATION SIMULATOR (PSU/HVS 1. BRANCH RESISTANCES ARE ASSUMED TO H
Jan 1, 1977
-
Appendix G - Table Ix - Mine ABy David Hoadley, Kenneth R. Maser, Ashok B. Boghani, James E. Billar, D. Randolph Berry, Mackenzie Burnett, Robert H. Trent
APPENDIX G TABLE IX MINE A 1 General Total Employees 3000 Maximum No, of Men Underground/Shift 800 Shifts/Day 3 Type of Ore Copper Daily Production (TPD) 25,000 Mining Method Room and Pillar
Jan 1, 1976
-
Appendix G – Input Data fort initial SimulationBy R. V. Ramani, R. Stefanko, G. W. Luxbacher
1 9 THIS IS A DIGITAL COMPUTER SIMULATION OF THE VENTILATION SYSTEM OF A MINE LOCATED IN WASHINGTON COUNTY; PENNSYLVANIA. THE VENTILATION SURVEY ON WHICH THIS SIMULATION IS BASED WAS RUN FROM OCT. 27
Jan 1, 1977
-
Appendix H – Computer Output for Initial SimulationBy R. V. Ramani, R. Stefanko, G. W. Luxbacher
MINE VENTILATION NETWORK ANALYSIS
Jan 1, 1977
-
Appendix I - Cost Analysis SystemBy R. V. Ramani, V. T. Burgos, J. A. McClay
Introduction The Cost program was developed to provide the planning engineer with a tool to evaluate the cost implications of the technical mine design decisions. Direct costing methods are empl
Jan 1, 1975
-
Appendix I - The Art of Creating a Financially Rewarding RoyaltyBy Craig Haase
A. Introduction
Jan 1, 2003
-
Appendix I – Computer Program ListingBy R. V. Ramani, C. B. Manula, A. Owili-Eger
• MINE VENTILATION NETWORK PROBLEM (NATURAL SPLITTING; FIXED • QUANTITY BRANCHES; METHANE SIMULATION; NETWORK TOPOLOGY REVISION; • ABSOLUTE PRESSURE) • NFIXB = NO. OF FIXED QUANTITY BRANCHES • DD(
Jan 1, 1975
-
Appendix II – Model Verification Test IBy R. V. Ramani, V. T. Burgos, J. A. McClay
The data for Test I describes an underground bituminous coal mine operation in a 48 inch seam, with an estimated production rate of 1,056,000 tons per year. The system includes four continuous mining
Jan 1, 1975
-
Appendix II – Part I to Part IV - Each part contains the input, output, and a schematic showing the flows from computer solutionsBy R. V. Ramani, C. B. Manula, A. Owili-Eger
PART 1 THE INPUT AND OUTPUT DATA AND THE MINE SCHEMATIC SHOWING THE FLOWS FROM COMPUTER SOLUTIONS FOR APPLICATION I
Jan 1, 1975
-
Appendix III - Analytical Pressure - Volume Computations For The Mine PrototypeBy R. V. Ramani, C. B. Manula, A. Owili-Eger
ANALYTICAL PRESSURE - VOLUME COMPUTATIONS FOR THE MINE PROTOTYPE A new coal mine is projected, with entrance by slope 1,500 feet long. Nine main entries will be standard for development, five as in
Jan 1, 1975
-
Appendix III - Joint Venture Agreement Table of Contents, AnnotatedBy Karl J. C. Harries
"The Table of Contents that follows is only an example and is the Table of Contents from an actual negotiated agreement. It is merely intended to show how an agreement might be set out and the nature
Jan 1, 2003
-
Appendix III – Model Verification Test IIBy R. V. Ramani, V. T. Burgos, J. A. McClay
The data for Test I1 describes an underground bituminous coal mine operating in a 72 inch seam, with an estimated production rate of 4,257,000 tons per year. The system includes 15 continuous mining s
Jan 1, 1975