Search Documents

  • SME-ICGCM
    Gate Entry Design For Longwalls Using The Coal Mine Roof Rating

    By Chris Mark

    Successful longwall mining requires a stable tailgate entry. Gate entry performance is influenced by a number of geotechnical and design factors, including: - Pillar size and pillar loading; - Ro

    Jan 1, 1993

  • SME
    Electric Rope Shovel Monitoring

    By J. Hansen

    This paper has been written for presentation during the Open Pit Mining Session at the SME Annual Meeting and Exhibit, Denver, Colorado, February 26 to 28, 2001. The paper addresses the application o

    Jan 1, 2001

  • CIM
    Development Status of Thin, Spray-on Liners for Mining and Civil Engineering Applications

    By James F. Archibald

    Research has been conducted for the Workplace Safety and Insurance Board of Ontario (WSIB) to characterize thin, spray-on lining materials (TSLs), as well as combinations of TSLs and conventional spra

    May 1, 2006

  • SME
    EPB TBM Tunnelling in Singapore Old Alluvium

    By N. Loganathan, Tan Boon Tee, Joe O’Carroll, Richard Flanagan

    In recent years, tunnelling activities in Singapore have increased considerably with the construction of extensions to the existing sub-surface transport system, a deep tunnel sewerage disposal system

    Jan 1, 2005

  • NIOSH
    OFR-89-82 Trolley Carrier Phone Mine Communications - Adaptive Volume Control And Use Of A Dedicated Wire Or A Low Impedance Line For Improved Carrier Phone Communications In Mines

    By Robert L. Lagace

    A prototype adaptive volume control for the loudspeaker output of mine trolley carrier phones was designed, built, and tested in the laboratory and in a mine. This volume control senses, and adapts to

    Jan 1, 1979

  • SME
    Regulation Of Surface Subsidence In Nest Virginia

    By Steve Meador

    West Virginia's basic coal mining regulatory programs are not unique when compared to Federally approved programs implemented by other coal producing states. In fact, the language in The West Vi

    Jan 1, 1986

  • AUSIMM
    PeckÆs Centrifugal Elevator

    The centrifugal elevator invented and patented by the writer is designed for the purpose of conveying the tailings of a gold dredge to such a distance that it shall not impede the dredging opperations

    Jan 1, 1904

  • CIM
    Vibration analysis of mining shovels

    By P. N. Saavedra, E. A. Salamanca

    "The maintenance strategies in the mining industry are changing from operative and periodic inspection strategies to a condition-based, predictive maintenance strategy centred in vibration analysis pl

    Jan 1, 2002

  • AUSIMM
    Heat Transfer Mechanism in Ignition of Nickel Sulphide Concentrate under Simulated Flash Smelting Conditions

    For small particles of niekel flotation eoncentrate (av. size 50 pm) the predominant heat transfer mechanism under suspension smelting conditions, prior to ignition, is conduction from the gas and not

    Jan 1, 1979

  • SME
    The 1980’s – Hard Times With a Golden Lining

    By William R. Yernberg

    The early part of the decade was marked by world-wide problems and economic difficulties. In 1980, President Jimmy Carter ordered the failed military mission to rescue hostages in the U.S. Embassy in

    Jan 1, 2007

  • SME
    Prediction of Ground Vibration Induced Due to Single Hole Blast Using Explicit Dynamics Mining, Metallurgy and Exploration (5745d634-e632-4178-ad6f-441932595fe2)

    By R. K. Sinha, B. S. Choudhary, Desh Deepak, A. K. Mishra, Hemant Agrawal, Shankar Kumar

    There are several methods (empirical, statistical, and machine learning tools) to calculate blast-induced ground vibration. Still, due to complications in the blasting procedure, under varying blastin

  • SME-ICGCM
    Top Coal Failure Mechanism Of Extremely Thick Seam In Top Coal Caving Mining (b4774a45-fd0f-4916-8ea9-0dac0bf96077)

    By Nan Hua

    As a high production and high efficient mining method, top coal caving method is now widely used in China. However, as more extra-thick coal seams are mined, it becomes more and more difficult to make

    Jan 1, 2009

  • AUSIMM
    Golden Cross Mine Rehabilitation Update - September 2000

    By A Goldstone, T Maton

    The Golden Cross Mine is located on the North Island of New Zealand, at the base of the Coromandel Peninsula, approximately 8 km northwest of Waihi. The project is operated as a Joint Venture with Coe

    Jan 1, 2000

  • DFI
    Excavation Support At Historic Buildings In An Urban Environment - A Case Study

    By Tony Mazzo

    It has often been said by consulting engineers that foundation contractors are in the business of taking risks. One would agree that the mere fact a foundation project can be budgeted, planned, engine

    Jan 1, 2003

  • CIM
    The Real Cost of Material Handling Problems – And How to Avoid Them

    By T. Holmes

    Investigations reveal that the throughput difference between a perfect production day and the average is often on the order of 40%, and that bulk solids handling system deficiencies are the largest (>

    Jan 1, 2019

  • SME
    Bauxite Residue Fractionation With Magnetic Separators (97e49229-6f62-4ed3-b3b5-93e2e0e61fbc)

    By D. William Tedder

    Several bauxite residue sands and muds produced by Bayer plants in the U.S. and overseas have been fractionated using dry and wet magnetic separators. The magnetic sand fractions typically contain abo

    Jan 1, 1984

  • ISEE
    Influence of Distance in the Effective Use of Electronic Detonators to Control Blast Induced Ground Vibrations

    By W. J. Birch, R. Farnfield

    The use of electronic detonators to control blast vibrations has been previously established by many authors. This is performed by determining the optimum delay period between the blast holes for a pa

    Jan 1, 2009

  • AUSIMM
    Removal of Arsenic in Enargite from Copper Ores by Flotation and Leaching in NaHS Media

    Removal of Arsenic in Enargite from Copper Ores by Flotation and Leaching in NaHS Media

    Sep 13, 2010

  • ISEE
    A Case Study of Dimensional Stone Blasting in Korea

    By Choon Sunwoo, Chang-Ha Ryu

    There are various methods available for the recovery of dimensional stone in open pit quarries. Explosive blasting has more advantages in the economic point of view over the other methods but was not

    Jan 1, 2003

  • DFI
    Lessons Learned From Installation Of ACIP Piles In Various Geologic Settings Of The NYC Region

    By Frank J. Arland

    Augered-Cast-in-Place piles have been used successfully for many deep foundation applications. The four case studies discussed herein describe ACIP pile projects where problems developed during ACIP p

    Jan 1, 2004