    Underpinning Of Buildings During Tunneling Los Angeles Metro Rail System - Synopsis

    By John A. Dal Pino

    This paper describes two independent building underpinning projects during the construction of the Los Angeles Metro Rail System. The first project involves pinpile underpinning of a building along th

    Jan 1, 1996

  • DFI
    Sheetpile Wall System With Tiebacks In A Soft Clay Profile - Description - A. Alignment Description

    By Jean J. Abiassi

    The Boston Marine Industrial Park (BMIP) VENT 6 project is a cut and cover tunnel, part of the Central Artery / Tunnel (CA/T) in the city of Boston. The BMIP job will serve as the south approach t

    Jan 1, 1994

  • DFI
    Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation Project

    By Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres

    In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma

    Jan 1, 2018

  • DFI
    Study Of Ground Settlement And Volume Loss Associated With Tbm Tunnelling By Analytical And Numerical Methods

    By Suresh Chikati, Gangadharan Santhanam

    Twin tunnels were constructed to a length of 863m using TBM in one of the underground metro projects. The tunnels pass through complex geological conditions (soil, rock and mixed conditions). This pap

    Sep 1, 2022

  • DFI
    Washington Avenue Tunnel Project: Fortifying Aging Underground Infrastructure

    By Andrew R. Klaetsch, Peter W. Deming

    "The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th

    Jan 1, 2016

  • DFI
    Ground Freezing Combined Method for Urban Tunnel Excavation

    By Filippo Mira-Cattò, Andrea M. R. Pettinaroli, Elena Rovetto

    "The construction of Powisle station of Metro Warsaw Line 2, in Poland, required the execution of two shafts next to an urban road tunnel adjacent to the Vistula River. The shafts were linked by three

    Jan 1, 2015

  • DFI
    Horseshoe Secant Compression Shoring System For Tunnel Repair

    By Karen Talbot, Noah Maier, Rob Jameson, Giuseppe Gaspari

    A storage and drainage tunnel advancing below I-75 in Detroit, Michigan experienced sudden subsidence. The Tunnel Boring Machine (TBM) was damaged to the extent that its shield, cutting head and exten

    Oct 1, 2022

  • DFI
    Tunnel Headwall Softeyes: Fiberglass Design Applications and Constructability Challenges

    By Shawna Munn, Jakub Hudler

    This paper outlines the use of tunneling headwall softeyes for transit construction projects in the Greater Toronto Area (GTA) over the past decade. Due to spatial constraints, tunnel boring machines

    Jan 1, 2018

  • DFI
    Grouting Methods Involved in Stabilization of TBM Tunnel near CP-06, UAA-04, Chennai Metro

    By Yeruva Ramanareddy, Sohail Wajid, Ahmed Shaz, K. Bhavani

    "CP-06 is an NATM cross passage which connects up-line and down-line metro tunnels near Kilpauk Medical College, Chennai. It lies completely in loose silty sand to dense sand with water table almost t

    Jan 1, 2017

  • DFI
    The Design of Partial Depth Cement Deep Mixing (CDM) Foundation for an Immersed Tunnel

    By J. S. Lee, R. K. Massarsch

    "A 3.2 km long immersed road tunnel forms part of the Busan-Geoje Fixed Link in South Korea, which connects Korea's second largest city Busan, with the island of Geoje. To ensure the water tightness o

    Jan 1, 2015

  • DFI
    Piling Adjacent To Rail Tunnels At King’S Cross Central

    By David A. Hart, Barry P. Osborn, Richard J. Totty, Ana T. Carvalho, Max B. Elliott

    This paper addresses the experience designing and installing bored piles for the King’s Cross area. This includes continuous flight auger and rotary bored piles, with a range of diameters between 600

    May 1, 2022

  • DFI
    Tied-Back Offset Tangent Caisson Retaining Wall For The North Bulkhead Third Harbor Tunnel Project Boston, Massachusetts ? Introduction

    By Daniel L. Hanson

    This paper presents a case history of the design, installation and performance of a tied-back tangent caisson retaining wall which was constructed as part of the Third Harbor Tunnel project currently

    Jan 1, 1994

  • DFI
    Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted Piles

    By John F. MacDonald

    From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn

    Jan 1, 1990

  • DFI
    Design and Construction of the New VDOT Midtown Tunnel

    By Rick Ellman, Ian Chaney

    "The Hampton Roads area encompassing the Norfolk, Virginia Beach and Newport News metropolitan region experiences some of the worst traffic congestion in Virginia. With continued growth of the ports a

    Jan 1, 2014

  • DFI
    Foundation Design for Cut-and-Cover Tunnels Using Cement Deep Soil Mixing

    By Shahriar Vandani, Andy Herlache, Andrew Bro, Wei-Yu Chen

    "The Presidio Parkway Project will reconstruct approximately 1.6 miles (2.6 km) of highway, including seven new bridges, three new cut-and-cover tunnels, and a new undercrossing connecting the Golden

    Jan 1, 2014

  • DFI
    Case Histories of Circular Secant Pile Access Shafts for Tunnels

    By Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann

    Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The

    Jan 1, 2019

  • DFI
    Settlement Of A Building After Cutting Off Pile Tips Due To Tunnelling

    By Richard A. Forth

    During the construction of the Island Line (ISL) in Hong Kong between 1982 and 1986 piled foundations of a building were encountered in a tunnel drive. As the tunnel alignment could not be changed wor

    Jan 1, 2002

  • DFI
    St Clair River Rail Tunnel, Sarnia Evolution Of The Design And Construction Methods For The TBM Cutterhead Retrieval

    By Peter McDonald

    In 1994 the world's largest underwater tunnel was constructed to link Canada and the U.S.A. This new tunnel was large enough to accommodate double-decker railway cars. The construction of an unpl

    Jan 1, 1997

  • DFI
    Jacked Tunnel Construction

    "Boston’s Central Artery passes beneath nine active railroad tracks carrying commuter and Amtrak trains into South Station, the City's busiest rail terminal. These railroad operations had to remain in

    Jan 1, 2003

  • DFI
    Construction of Deep Shafts in Soft Ground for the West Side CSO Tunnel Project, Portland, OR

    By Vince Luongo

    "INTRODUCTIONThe West Side Combined Sewer Overflow (CSO) Tunnel Project is located in Portland, Oregon and is part of the Willamette River CSO Control Project. The purpose of the West Side CSO Project

    Jan 1, 2006