    Proceedings Of Earth Retention Systems 2003: A Joint Conference - Earth Retention Systems In The Urban Environment - Special Considerations

    By George J. Tamara

    The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence

    Jan 1, 2003

  • DFI
    Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin

    By Edward Jacobsen

    The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in

    May 11, 2007

  • DFI
    Energy Geostructures: Analysis from Research and Systems Installed Around the World

    By Tony Amis, Marco Barla, Alice Di Donna

    "Energy geostructures are becoming an increasingly popular solution around the world for Developers looking to reduce CO2 and system running costs. Energy geostructures are geotechnical structures tha

    Jan 1, 2017

  • DFI
    Underpinning Atlanta International Airport Concourse E for APM Tunnel Extension

    By Clinton O. Rex, Adam S. Hurley, W. Morgan NeSmith

    "Hartsfield-Jackson Atlanta International Airport underwent a $1.2 billion dollar expansion project centered on the construction of the new Maynard H. Jackson International Terminal. Passenger access

    Jan 1, 2017

  • DFI
  • DFI
  • DFI
    Artificial Ground Freezing – A Typical Application for the Underpass of an Existing Metro Station in Rome

    By Bruno Vingiani, Alessandro Bertero

    "The use of Artificial Ground Freezing (AGF) for temporary soil strengthening and seepage control is an effective alternative to grouting when dealing with soils whose degree of finesses would imply t

    Jan 1, 1900

  • DFI
    Session 30 "Grouting for Tunnels 2"

    By Raymond Henn

    Yes we have also used some however, again because of the nature of the maintenance window where we have that two hour (at best) window every night and due to the numerous other crews that are wanting

    Feb 10, 2003

  • DFI
    Current Pile Foundation Practice In Taiwan ? Synopsis

    By Za-Chieh Moh

    This paper presents a summary of the current pile foundation practice in Taiwan. Constructions of driven piles, drilled shafts, and barrette foundations are reviewed. This paper also briefly summarize

    Jan 1, 1996

  • DFI
    East Boston Branch Sewer Relief Project: Support Of Excavation Case Study

    By Eric P. Bregman

    As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed

  • DFI
    East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)

    By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan

    "As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed

    Jan 1, 2017

  • DFI
  • DFI
    Partnering And Technical Innovation Used To Stabilize Slurry Trench Walls Under Commuter Rail Station For Boston's Big Dig

    By Paul Pedini

    The challenge of Contract C19E1 of Boston's Central Artery Project called for the construction of two roadways under the commuter rail yard at North Station. Two options were offered for the meth

    Jan 1, 2002

  • DFI
  • DFI
  • DFI
    Acrylamide Grouting: Successfully Controlling Groundwater from Canada to South America

    By Daniel Magill, Jim Gentry

    "Acrylamide chemical grout (C3H2NO) has been successfully used for over 50 years to control groundwater and stop infiltration. This paper will address three unique projects involving the control of gr

    Jan 1, 2017

  • DFI
  • DFI
    Session 32 "Grout Mixtures and Materials 3"

    By Lois G. Schwarz

    I did a project (Sungai Piah) as a consultant to your firm in Malaysia, where we were faced with a similar situation as sketched out in your question. The following is what we did for the grouting of

    Feb 10, 2003

  • DFI
  • DFI
    Northeast Boundary Tunnel – Mount Olivet Road Drop Shaft

    By Jeremiah M. Jezerski, Russell H. Lutch

    The Mount Olivet Road Drop Shaft (MOR-DS) support of excavation (SOE) is a circular unreinforced concrete shaft with an inside diameter of a 30.5 ft (9.3 m) and depth of 120.5 ft (36.7 m), constructed