Proceedings Of Earth Retention Systems 2003: A Joint Conference - Earth Retention Systems In The Urban Environment - Special Considerations
By George J. Tamara
The urban environment presents special challenges for the design and construction of earth retention systems. Complications arising from difficult subsurface conditions are compounded by the presence
Jan 1, 2003
-
Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin
By Edward Jacobsen
The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in
May 11, 2007
-
Energy Geostructures: Analysis from Research and Systems Installed Around the World
By Tony Amis, Marco Barla, Alice Di Donna
"Energy geostructures are becoming an increasingly popular solution around the world for Developers looking to reduce CO2 and system running costs. Energy geostructures are geotechnical structures tha
Jan 1, 2017
-
Underpinning Atlanta International Airport Concourse E for APM Tunnel Extension
By Clinton O. Rex, Adam S. Hurley, W. Morgan NeSmith
"Hartsfield-Jackson Atlanta International Airport underwent a $1.2 billion dollar expansion project centered on the construction of the new Maynard H. Jackson International Terminal. Passenger access
Jan 1, 2017
-
-
-
Artificial Ground Freezing – A Typical Application for the Underpass of an Existing Metro Station in Rome
By Bruno Vingiani, Alessandro Bertero
"The use of Artificial Ground Freezing (AGF) for temporary soil strengthening and seepage control is an effective alternative to grouting when dealing with soils whose degree of finesses would imply t
Jan 1, 1900
-
Session 30 "Grouting for Tunnels 2"
By Raymond Henn
Yes we have also used some however, again because of the nature of the maintenance window where we have that two hour (at best) window every night and due to the numerous other crews that are wanting
Feb 10, 2003
-
Current Pile Foundation Practice In Taiwan ? Synopsis
By Za-Chieh Moh
This paper presents a summary of the current pile foundation practice in Taiwan. Constructions of driven piles, drilled shafts, and barrette foundations are reviewed. This paper also briefly summarize
Jan 1, 1996
-
East Boston Branch Sewer Relief Project: Support Of Excavation Case Study
By Eric P. Bregman
As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
-
East Boston Branch Sewer Relief Project: Support of Excavation Case Study (FULL Project)
By Eric P. Bregman, Franklin M. Grynkewicz, John E. Regan
"As part of an on-going effort to improve water quality and reduce discharge into Boston Harbor, the Massachusetts Water Resources Authority (MWRA) East Boston Branch Sewer Relief Project was designed
Jan 1, 2017
-
-
Partnering And Technical Innovation Used To Stabilize Slurry Trench Walls Under Commuter Rail Station For Boston's Big Dig
By Paul Pedini
The challenge of Contract C19E1 of Boston's Central Artery Project called for the construction of two roadways under the commuter rail yard at North Station. Two options were offered for the meth
Jan 1, 2002
-
-
-
Acrylamide Grouting: Successfully Controlling Groundwater from Canada to South America
By Daniel Magill, Jim Gentry
"Acrylamide chemical grout (C3H2NO) has been successfully used for over 50 years to control groundwater and stop infiltration. This paper will address three unique projects involving the control of gr
Jan 1, 2017
-
-
Session 32 "Grout Mixtures and Materials 3"
By Lois G. Schwarz
I did a project (Sungai Piah) as a consultant to your firm in Malaysia, where we were faced with a similar situation as sketched out in your question. The following is what we did for the grouting of
Feb 10, 2003
-
-
Northeast Boundary Tunnel – Mount Olivet Road Drop Shaft
By Jeremiah M. Jezerski, Russell H. Lutch
The Mount Olivet Road Drop Shaft (MOR-DS) support of excavation (SOE) is a circular unreinforced concrete shaft with an inside diameter of a 30.5 ft (9.3 m) and depth of 120.5 ft (36.7 m), constructed
Oct 1, 2022