Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
"Control Of Heavy Water Inflows In The Moawhango-Tongariro Tunnel, New Zealand"
By George Munro
Heavy water inflows of up to 1350 1/sec in the 19.6 km Moawhango-Tongariro Tunnel section of the Tongariro Power Development Scheme in New Zealand gave rise to severe operating problems, particularly
Jan 1, 1981
-
"Key Technologies of Large RectangularPipe Jacking Machine"
By Lianhui Jia, Yali Han
"The key technologies of a large rectangular pipe jacking machine with dimensions of 10.12m × 7.27m (width x height) include selection of rectangular cross-section cutting modes, analysis on the stren
Jan 1, 2016
-
"Stemming Tunnels At The Nevada Test Site"
By H. F. Haller
Large volume sand plugs are placed in tunnels to stem underground explosions at the Atomic Energy Commision's Nevada Test Site. Placement through long, narrow accessways is like stemming coyote h
Jan 1, 1967
-
"Testing Of Friction Rock Stabilizers*?
By James J. Scott
Friction Rock Stabilizers, trade name II Sp 1 it Sets'" have been under research and development by the author and the Ingersoll-Rand Company since February of 1973. The United States Bureau of M
Jan 1, 1977
-
100 years of mining research celebrated at SME meeting
When looking for indicators for the mining business ? and these days who isn?t? ? one might need to look no further than the SME Annual Meeting. Held in Phoenix, AZ Feb. 28 to March 3, the meeting was
May 1, 2010
-
120-Year Design Lifetime of Plastics
By Eckl, Martin, Stefan Lemke, Martin Londschien
"Tunnels are built with a design life expectancy of over 100 years. One key component of such a design is the waterproofing system, which must reliably fulfil its function during the whole service lif
Jan 1, 2016
-
2009 Permeation Test Results For Grouts Made With Ultrafine Cements
By Raymond W. Henn
The 30th annual short course ?Grouting Fundamentals and Current Practice? was held at the Colorado School of Mines, June 22-26, 2009. The field demonstration portion of the course was conducted June 2
Jan 1, 2009
-
2012 Fox Conference Turns Its Focus To International Projects
For the first time in its history, the George A. Fox Conference let its focus venture away from the friendly confines of the East Coast of the United States to spend part of the one-day conference loo
Jan 1, 2012
-
3-Dimensional Analysis of EPB TBM Operation in Close Proximity to Pile Foundations
By Mahmoud Sepehrmanesh, Verya Nasri, Maziar Partovi
"This paper presents an assessment of the impact of tunneling and its associated risks on pile foundations located in the influence zone of tunneling operation. Tunneling in proximity of pile foundati
Jan 1, 2016
-
30 Years of Advances in Risk Management for Underground Projects - RETC2023
By Kevin Lundberg, Philip Sander, Daniel Weinberger, John Reilly
Since the early days of risk management, developments in technology and guidelines (ITA, ITIG, OGG, UCA) have advanced risk management and probable cost estimating, which are now widely recognized. WS
Jun 13, 2023
-
360-Degree 3D Digital Assessment of Subsurface Water Infrastructure - NAT2022
By Cory Dippold, Michael Mett, Jérôme Steinkühler, Kristi Latimer
For decades, tunnels of all types have been a significant part of our infrastructure. In particular, water tunnels carry millions of gallons of fresh water every day to major metropolitan areas and su
Dec 1, 2022
-
3D Animation in Tunneling
By Anthony D. Songer, James E. Diekmann, Jarrett E. Carlson
Computer Aided Design (CAD) systems are currently recognized as a necessary tool for the management of projects. Currently, CAD is used for TBM and conveyor setups, concrete lift design and overall c
Jan 1, 1997
-
3D Finite Element Seismic Analysis of Large Diameter Segmentally Lined Shafts
By D. Kruse, M. Sanaei
"A three dimensional nonlinear finite element model was constructed to simulate and analyze the behavior of large diameter segmentally lined shafts when subjected to seismic waves. To reduce computati
Jan 1, 2016
-
40 Years of Experience in the Use of Umbrella Arch Method in Tunneling: Problems and Solutions
By Georgios Kalamaras, Sebastiano Pelizza, Carlo Alessio
"This article describes, through the presentation of five cases-history, technological advances that the Authors together with Tunneling Contractors devised for coping with adverse geotechnical condit
Jan 1, 2016
-
70-Foot-Deep Sheet Pile Cofferdams Driven by the Press-In Piling Method
By Takayuki Sakai, Takefumi Takuma, Lee Roesner
"70-foot deep rectangular-shaped bulkheads were built with sheet piles as launching and receiving shafts for a pipe jacking operation for new underground waterlines in a densely populated section of L
Jan 1, 2016
-
73rd Street TARP Relocation McCook Cup Reservoir: Contract 97-156-2H
By Brent Duncan, Doug Harding, Bob Stier
The 73rd Street Tunnel Project is part of “The Tunnel and Reservoir Plan” (TARP)also known as the Deep Tunnel Project, and is located in the Village of Bedford Park, County of McCook, State of Illinoi
Jan 1, 2003
-
79th Street Water Tunnel Extension
By Sara J. Heinlein, George Malkos, James E. Lindell, Tony Pestonatto
The 79th Street Water Tunnel Extension Project was initially designed by the City of Chicago, Department of Public Works, to increase the capacity of the City’s south side water distribution system. M
Jan 1, 2003
-
8 M Diameter 7 KM Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 Months
By Antonio Raschillà
On the 2nd of June 2007 SELI S.p.A. started the excavation of Beles Tailrace Tunnel (Ethiopia). The new 8,07 m diameter DS Universal TBM utilized for the tunnel excavation was manufactured by SELI S.p
-
A 108-in Storm Tunnel Underneath Active Taxiways and Apron at O’Hare International Airport - NAT2024
By Tim M. Benson, Adam L. Lamanna, Carolina Martinez-Gutierrez, Mark J. Stephani
The Lower Concourse C Extension (LCE) 108-in Storm Sewer consists of a 2,797-foot long, 27 to 55-foot deep, 108-in I.D. storm sewer tunnel. Situated beneath active taxiways and a terminal apron at Har
Jun 23, 2024
-
A 4.75m Contractor Manufactured EPB Machine
By Bruce Richardson
A contractor-manufactured 4.75m (15'-7") diameter EPB shield excavated a 115m (375 ft) long tunnel under the San Antonio River as part of the Salado Creek to Dos Rios Pipeline Interconnect Projec
Jan 1, 2008