Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Sealing Of Shafts, Tunnels, And Boreholes For Waste Repositories
By R. D. Ellison, D. K. Shukla, D. E. Stephenson
Seals for man-made penetrations into or nearby nuclear waste repositories require several unique capabilities not common to seals for conventional underground activities. Design criteria include long
Jan 1, 1981
-
Road-Testing the ITA Contractual Practices Checklist
By David Caiden, Petros Fortsakis, Alan Hodgkinson
"1. INTRODUCTIONDo contractual practices affect project outcome? Can better contractual practices improve the likelihood of project success? The consensus amongst experts is that better contractual pr
Jan 1, 2016
-
Shotcreting Automation
By T. M. Karppanen
Shotcrete is used both in mining and tunnelling for supporting rock. Both dry and wet processes are used for shotcreting, and each produces good quality concrete. Thick shotcrete layers function a
Jan 1, 1989
-
Grouting Cohesionless Water-Bearing Soils In City Tunnels
By Marcel Haffen, Jean Janin
The purpose of grouting is to modify the permeability and strength characteristics of the subsoil in such a way that the planned structure can be efficiently constructed at a given location. This t
Jan 1, 1997
-
IH-635 (LBJ Freeway) Corridor Section 4-West Traffic Tunnels
By Matthew E. MacGregor, Hugh T. Kelly
I.H. 635 (LBJ Freeway) was constructed as a loop freeway around the city of Dallas in the late 1960s and early 1970s with a design capacity of 160,000 vehicles per day (vpd). Today’s facility is carry
Jan 1, 2005
-
Building The Tunnel And Reservoir Plan Using The Contracting Practices Of The Metropolitan Sanitary District Of Greater Chicago
By Frank E. Dalton, Forrest C. Neil
INTRODUCTION The Tunnel and Reservoir Plan (TARP) (Figure 1) was adopted in 1972 as the most cost-effective way to bring Chicago area waterways up to Federal and State water quality standards. TARP
Jan 1, 1981
-
Laboratory Studies Of Disc Cutters For High Speed Tunnel Boring In Soft Rocks
By Levent Ozdemir, Gerald Dollinger
An extensive series of linear and rotary cutting tests were run in soft and medium strength rocks at the Earth Mechanics Institute of the Colorado School of Mines to investigate the possibility of ver
Jan 1, 1989
-
Gas Explosions And Fires In Tunnels - A Chemical Viewpoint
By Jerome F. Thomas
The primary purpose of this paper is to review the fire and explosion hazards associated with hydrocarbons heavier than methane. Methane is the classical hydrocarbon encountered in mines whose presenc
Jan 1, 1974
-
The Alptransit Lötschberg Project, Switzerland: High Performance Wet-Mix Sprayed Concrete During TBM Excavation of Two High-Speed Railway Tunnels
By Jens Classen, Thomas Kurth, Karl G. Holter
High performance sprayed concrete equipment installed on two 9.4 m diameter hard rock TBMs enabled a continuous sprayed concrete lining for the entire contour in both tunnels to be performed concurren
Jan 1, 2003
-
CERN’s LHC Project–Large Caverns in Soft Rock at the Edge of Feasibility
By Hans-Christian Kurzweil, Klaus Mussger
CERN, the European Laboratory for Particle Physics, are upgrading their existing particle accelerator for the next generation of experiments and have three major packages of underground construction w
Jan 1, 2003
-
Gravity Concentration: Research, Design and Circuit Performance at Montana Tunnels
By Steve Lloyd, Mary Anne Antonioli, Byron Darnton
The Pegasus Gold/Montana Tunnels Mine is a hightonnage, low-grade, base and precious metal operation in Jefferson City, Montana. Gold heads are typically 0.02 opt with the dominant gold mineral being
Jan 1, 1992
-
City of Los Angeles Large-Diameter Interceptor Sewer Tunnels
By Baron Miya, Keith Hanks, William Edgerton, Francis Fong
The City of Los Angeles capital improvement program includes the construction of a new 35-km interceptor sewer. This sewer will be built as a deep tunnel with finished diameters ranging from 2- to- 4
Jan 1, 1999
-
TBM Technology for an Australian Coal Drift: The Grosvenor Project
By Robert Marks, Enrico Dal Negro, Richard Schulkins
"In July 2012 construction started on the Grosvenor project, a five million tonne per annum underground longwall mine planned for Moranbah in Central Queensland. Grosvenor is located immediately to th
Jan 1, 2016
-
Evaluation of Ground Improving Measures to Prevent TBM Jamming in Squeezing Ground
By Jamal Rostami, Jürgen Schmitt, Rohola Hasanpour
"Double Shield TBMs can be used in fast track projects for accelerated completion where there is limited information available on ground conditions and there are possibilities of encountering weak gro
Jan 1, 2016
-
Shaft Sinking on the MetroWest Water Supply Tunnel Project
By A. J. Stewart, M. Guay, J. W. Critchfield, A. P. Hoddeson
The MetroWest Water Supply Tunnel project includes three main work shafts, excavated primarily in rock. Shaft L is 9.8 m (32 ft) diameter and 124.1 m (407 ft)deep. Shaft E is 7.0 by 12.8 m (23 by 42 f
Jan 1, 1999
-
Investigations Into Methods For The Protection Of Underground Workers Against Radon And Its Daughter Products
By W. Haupt, M. Thormé, H. J. Ertle, K. Reim
Though Germany has a very old mining history, her experience in uranium mining only started in the late sixties. Today in the Federal Republic of Germany (FRG) there are only 5 small mines in the exp
Jan 1, 1981
-
Montana Tunnels – start-up efficiencies improves, expansion considered
By Daniel J. Turk, William R. Banning, John Paterson, Thomas J. Weitz, Michael L. Clark
Introduction Pegasus Gold's Montana Tunnels mine is a large surface gold, silver, lead, and zinc mine located 37 km (23 miles) south of Helena in southwestern Montana. Milling operations comm
Jan 1, 1989
-
An Innovative Method of Large Space Underground Construction in Soft and Shallow Ground Using Concrete Arch Pre-Supporting System, CAPS Method
By Mohammad Hossein Sadaghiani
"Construction of underground structures in urban areas is a very challenging work. There are generally two methods of construction, an open cut-and-cover and underground method. To eliminate the subsu
Jan 1, 2016
-
Construction Management And Team Effort Soft Ground Tunnel Project, Alexandria, Egypt
By Chaitanya "Teny" Mittal
INTRODUCTION A team effort by the Owner, Engineer, and Contractor can help avoid serious problems on a construction project. It can save cost and time for both Owner and Contractor, as illustrated
Jan 1, 1989
-
Subsidence - A Real Or Imaginary Problem
By August E. Vandale
I speak to you today on the subject assigned to me, "Subsidence - a Real or Imaginary Problem", as a representative of Consolidation Coal Company (a wholly owned subsidiary of Continental Oil Company)
Jan 1, 1967