CSM-USBM Rotary Cutting Machine: Research Capabilities And Trials For Improving The Performance Of Tunnel, Shaft And Raise Boring Machines
By Levent Ozdemir, Robert J. Evans, Russell J. Miller, William Sharp
This paper describes the specifications and capabilities of a 6 ft (1.83 m) diameter laboratory rotary cutting machine which was designed and fabricated under a Bureau of Mines (USBM) contract awarded
Jan 1, 1983
-
Performance of a TBM and a Roadheader in the Coal Measure
By Athorn Mary-Lee, Randall A. Snowdon
During the development of the Selby Coalfield, UK, a Robbins full-face tunnel boring machine (TBM) and a Thyssen Titan roadheader were used to drive a pair of parallel spine roadways. This paper prese
Jan 1, 1986
-
Geotechnical Baseline Reports?A Review
By T. Freeman
In the past ten years, the Geotechnical Baseline Report (GBR) has arguably become the key document for tunnel construction. This report not only allocates much of the risk involved with the work, it s
-
Evaluation Of Alternative Shaft Sinking Methods For Nuclear Waste Repositories
By Stephen Phillips, Luigi P. Gonano
Vertical circular shafts have been proposed for multiple access to high level nuclear waste deep geologic repositories. Shaft construction is a critical path item in the commissioning of a repository.
Jan 1, 1983
-
Recent Developments In High-Pressure Water-Jet Assisted Cutting Of Rock And Coal
By George K. Schenck
INTRODUCTION Recent advances in high-pressure water jet technology can be effectively employed in mining and tunneling. The new equipment is based on available industrial hardware such as pumps, no
Jan 1, 1983
-
New Techniques In Beneficiation Of Florida Phosphates Of The Future - Part III - Beneficiation, Waste Disposal And Environmental Regulations - Abstract Of Parts I And II And Introduction To Part III.
By James E. Lawver
Part I describes the general geology of the Florida deposits. As the lucrative Bone Valley Formation is depleted, replacement production will move progressively into areas of total Hawthorn production
Jan 1, 1983
-
Underground Mining: Caving Methods
By George A. Mealey
Caving mining methods that are based on a planned caving of rock above and/or at times surrounding the material being mined can be classified in three broad categories: longwall mining, sublevel cavin
Jan 1, 2008
-
Evaluation of Mining Methods and Systems
By Jan M. Mutmansky
Since 1973 when the first edition of the SME Mining Engineering Handbook was published, many significant changes have occurred in the US mining industry. The industry went through a fairly prosperous
Jan 1, 2008
-
Recent Application of Slurry- and EPB-Technique in Europe
By Claus Becker
In Europe, approx. 50 km of traffic tunnels are under construction using Slurry-or EPB Shields or Convertibles of all sizes, among them the biggest slurry shield ever built up to now with 14,20 m diam
Jan 1, 1999
-
Estimation of Leakage Quantity for Long Auxiliary Ventilation Systems
By Pierre Mousset-Jones, Felipe Calizaya
This paper summarizes the current research trends in the ventilation design for the construction of very long tunnels, and presents the results of leakage flow measurements in three auxiliary ventilat
Jan 1, 1997
-
Battery Park Truck Sewer Emergency Tunnel Project
By Mark Rybak
On August, 31, 2006, Tropical Storm Ernesto hit the City of Richmond, Virginia. The Battery Park area was hit particularly hard, as flooding forced an evacuation of the area. A large sinkhole collapse
Jan 1, 2008
-
Environmental Evaluation Of The Belle Eldridge Mine Near Deadwood, South Dakota
By A. D. Davis, C. J. Webb, C. S. Johnson
The Belle Eldridge Mine is an inactive lead-zinc mine in Spruce Gulch south of Deadwood, South Dakota. Acidic mine drainage (AMD) produced at the site drains into Spruce Creek, a tributary of Whitewo
Jan 1, 2000
-
Designing the Alaskan Way Tunnel to Withstand a 2,500-Year Earthquake
By Gordon T. Clark, James R. Struthers, Celal Kirandag
INTRODUCTION Project Background The Washington State Department of Transportation (WSDOT) hired the Seattle office of Parsons Brinckerhoff to lead a team of consultants to produce an Environ-men
Jan 1, 2007
-
The Menominee Iron District
By Alexander N. Winchell
"Location: The Menominee district has been described geologically in several units, because the known iron-bearing formations of the larger region are not a really connected. From the commercial and m
Jan 1, 1920
-
Heat Stress in Underground Mines and its Control Measures: A Systematic Literature Review and Retrospective Analysis
By Siddhartha Roy, Hemant Agrawal, Ram Madhab Bhattacharjee, Devi Prasad Mishra
Heat stress is a major concern for the health, safety and productivity of miners working in hot and humid underground mines. At greater depth, heat inside underground mines increases due to geothermal
Jan 14, 2022
-
East Side Access project taking shape beneath the streets of Manhattan
Beneath some of New York?s most iconic buildings ? The Met Life Building, the Helmsley Building, the Waldorf Astoria ? crews are busily at work on the Metropolitan Transportation Authority?s long-awai
Jan 3, 2010
-
Current State Of Disc Cutter Design And Development Directions
By Joe Roby
Rolling disc cutters are the business end of hard-rock and mixed-face tunnel boring machines (TBMs). Since their first successful employment on a TBM more than 50 years ago, disc cutter technology ha
Jan 1, 2009
-
Surface Mine Development
By William A. Hustrulid
The subject of surface mine development is large. This section covers the fundamental concepts involved in both the open pit mining of thick or steeply dipping deposits as well as the strip mining of
Jan 1, 2008
-
Environmental Assessment Study For Extension Of Spadina Subway In Toronto
By Verya Nasri, Scott Thorburn
The City of Toronto and the Toronto Transit Commission (TTC) have conducted an Individual Environmental Assessment (EA) for a 6.2 km, 4-station underground extension of the Spadina Subway from Downsvi
Jan 1, 2007
-
Truth, Judgement, Responsibility, Integrity, Conflict And Resolution In Exploration And Heavy Construction
By Peter J. Tarkoy
A great deal of attention has been directed toward the complexities and inadequacies of exploration and pre-bid geotechnical information for heavy construction projects, differing site conditions, and
Jan 1, 1983