Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Design-Bid-Build Contracting: Climbing Out of a Paradigm Sinkhole

    By Randall J. Essex

    Public and private owners of infrastructure projects face a number of real and perceived constraints when considering design-bid-build (DBB) procurement for underground projects. Thus, they may not be

    Jan 1, 2003

  • SME
    The Rock Properties Improvement and its Simulation by Numerical Methods

    By E. V. Kuzmin

    The rock properties improvement means the exchange of natural properties: increase of stability, strain and compress tension, reduction of gas-liquid filtering property, increase Jung- module, other m

    Jan 1, 1996

  • SME
    Long Distance Pipe Jacking In Sayreville, New Jersey

    By Siegmund Babendererde

    1. Introduction In Sayreville, New Jersey, the Middlesex County Utilities Authority put the construction of a 1041 m long sewer outlet to tender in June 1989. It had an internal diameter of 3,36 m

    Jan 1, 1991

  • SME
    Influence of ventilating air temperature fluctuations on stress distribution around an airway in frozen ground

    The thermal field of a frozen rockmass surrounding an airway is often disturbed due to thermal interaction with mine ventilation air. Outside air entering an underground mine changes the parameters of

    Jan 1, 1991

  • SME
    Experiences With New Hydraulic Rock Drilling Techniques At The Hanging Lake Project, Glenwood Canyon, Colorado.

    By Svante Lundbrink

    A new generation hydraulic rock drill featuring more than 50 percent higher performance than other drills has been introduced by Atlas Copco. In conjunction with the new rock drill, control systems ha

    Jan 1, 1991

  • SME
    Design And Construction Of Shafts By The Wet Method

    By Safdar A. Gill

    The technique of installing small diameter caissons (drilled piers) through soft clays and water bearing ganular soil is well established for constructing building foundations. Over the past few years

    Jan 1, 1981

  • SME
    Deep Basing Facilities For Strategic Missiles Design And Construction Issues

    By R. K. McFarland, E. S. Diamant, L. Blake

    A number of concepts for basing strategic missiles facilities deep underground have been developed within the defense industry. Recently, several contracts were let by the Air Force Ballistic Missile

    Jan 1, 1983

  • SME
    A New Device Of A Hydraulic Drill For Anchors

    By Yuji Tsuneno, Yoshikazu Mikami, Yasuo Takeuchi

    A new device was successfully developed in order to overcome the difficulty of drilling longer holes for anchors in soft soil bedrocks or swelling bedrocks, which is one of the major impediments to ra

    Jan 1, 1981

  • SME
    Geotechnical Characterization For Caisson Sinking In Medium Stiff Clay

    By Michael S. Robinson, Serge Moalli

    Construction of the CSO Retention - Treatment Tunnel, Segment 1 in Dearborn, Michigan includes excavation for an overflow Structure with a minimum inside diameter of 15.24 m (finished). The excavation

    Jan 1, 1995

  • SME
    Design and Geotechnical Aspects of Microtunnel Crossings Below Active Rail Alignments

    By Andy J. Robinson, Mark D. Claassen

    Railroad companies and transit authorities have been slow to acknowledge that for many—utility crossings, a direct pipe installation below live rail can be just as effective as a more intrusive tradit

    Jan 1, 2003

  • SME
    Houston Pipe Jacking - Large And Small

    By George H. Klein, B. Kent Merritt, Anthony Crisci

    During the past decade, over 114-km (71-mi) of 0.25-m (10-in) to 3.7-m (144-in) finished diameter tunnels have been driven below Metropolitan Houston as part of a major program of water and wastewater

    Jan 1, 1991

  • SME
    The North Homestake Project

    By Jay A. Bowden

    In April of 1990, Homestake Mining Company began a 5,100 m (16,700 ft.) exploration drift from the Homestake Mine in Lead, South Dakota. The drift starts from the mine's 6800 level, nearly 2,100

    Jan 1, 1993

  • SME
    Rocky Mountain Project - Underground Phase

    By Leif A. Nordell, Philip E. Freeland

    A paper discussing specification, methods, situations and results encountered in underground phase construction of the Rocky Mountain Pumped Storage Project near Rome, Georgia. The scope of work in

    Jan 1, 1985

  • SME
    Ground Freezing for the Construction of Deep Shafts (cd62e630-bbbe-4bb8-bfbe-16b05dab86f1)

    By James A. Morrison, Stephane Carayol, Paul H. Madsen

    The Rio Piedras Alignment Section 7 of the Tren Urbano is currently being constructed beneath a historic commercial section of San Juan. Different portions of the section are being constructed using o

    Jan 1, 1999

  • SME
    Ultrasonic Anemometry in Underground Excavations

    By P. Mousset-Jones, F. Calizaya

    Ultrasonic anemometry is a relatively new method of measuring the air velocity in underground excavations and is not widely used. The method has been mainly used for surface applications, such as mete

    Jan 1, 1995

  • SME
    An Electromagnetic Pulse Hazard Detection System

    By David L. Moffatt, Leon Peters

    A unique electromagnetic pulse sounding system for the detection and identification of geological and man-made anomalies which represent hazards in hard rock rapid tunneling operations is described. T

    Jan 1, 1997

  • SME
    Construction Of Southwest Interceptor #3 And #4 Cleveland, Ohio

    By Lawrence M. Lenahan

    Cleveland's Southwest Interceptor Contracts No. 3 and No. 4 are continuations of Contract No. 1 addressed at the 1987 RETC with geology, equipment, and methods that differ greatly. The two con

    Jan 1, 1989

  • SME
    New Roadheader-Type Continuous Shaft Sinking Systems

    By Wilhelm J. Kogelmann

    The concept and operation of novel shaft sinking systems utilizing roadheader-type cutter booms, including mucking, conveying, and hoisting installations, are described. Selection criteria, performanc

    Jan 1, 1989

  • SME
    Remotely Controlled Direct Pipe Jacking Experiences In Oakwood Beach Interceptor, Staten Island, NY

    By Dipak D. Shah, Sajjan K. Jain

    An interceptor sewer, 2103 linear meters (6900 Ft), 1.52 meter (5 ft) in nominal diameter, is installed by a direct pipe jacking system utilizing a remotely controlled fully automatic slurry shield ma

    Jan 1, 1991

  • SME
    NS9 Drop Shaft And Ancillary Facilities - Contract I36G52 - Milwaukee, Wisconsin

    By Patrick J. Doig

    The NS9 Drop Shaft contract formed part of the Waste Pollution Abatement Program (WPAP) conducted by the Milwaukee Metropolitan Sewerage District (MMSD). The contract involved the construction of two

    Jan 1, 1991