Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Atlanta—Plain Train Tunnel West Extension Project— Progressive Design-Build Risk Management Approach - RETC2023
By Jake Coibion, Elmira Riahi, Dominic Reda, Walter Klary, Vojtech Gall
Progressive Design-Build is becoming a more common delivery method in the tunneling industry. This approach allows the Owner to select a design-builder primarily based on qualification instead of lowe
Jun 13, 2023
-
Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023
By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline
Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump
Jun 13, 2023
-
Planning for Emerging Technology Underground Connection Between Rancho Cucamonga Metrolink Station and Ontario International Airport
By Mike Wongkaew, Brandon Kluzniak, Per Vilhelmsson
Rail access to Ontario International Airport (ONT) has long been a goal of San Bernardino County Transportation Authority (SBCTA) to increase public transit options to ONT and provide incoming ONT pas
Dec 1, 2022
-
Unprecedented In-Tunnel Diameter Conversion of the Largest Hard Rock TBM in the U.S. - NAT2022
By Evan Brinkerhoff, Steve Chorley
The largest hard rock TBM ever to bore in the USA, an 11.6 m diameter Robbins Main Beam TBM, recently underwent a planned in-tunnel diameter change to a more compact 9.9 meters. The first-of-itskind c
Dec 1, 2022
-
Deep Portal Shafts of the Annacis Island Outfall Tunnels— Building on Pacific Northwest Shaft Design Experience - RETC2021
By John Newby, Ulf Gwildis, Fred Marquis
From the Brightwater Conveyance System in Seattle to the Second Narrows Water Supply Tunnel in Vancouver, BC, the design and construction of deep-lying tunnels in the Pacific Northwest often require t
Jun 13, 2021
-
EPB Bypass and Hanging of 2.6 m Dia. Sewer under Live Flow Conditions
By Matthew Geary, Stephen J. Marino, Jordan A. Schreiner
"INTRODUCTION Project Overview The Southeast Collector (SeC) is a new 15km long 3.0m internal diameter wastewater tunnel designed by Hatch Mott MacDonald (HMM) that twins the existing 2.6m diameter Yo
Jan 1, 2016
-
Design and Engineering during the Construction of Los Leones Station (Line 6, Santiago Subway, Chile)
By Jaime Adasme, Héctor González, Benjamín Celada
"INTRODUCTION Santiago de Chile is a 7 million inhabitant city which has a 103 Km long subway network operated since 1975 by Metro S.A. This network is used on a daily basis by 2.3 million people. In
Jan 1, 2016
-
Unique Challenges for the Construction of PATH’s Exchange Place Cross-Passage Tunnel - NAT2022
By Todd Kilduff, James Grillo, Shrey Arora
In efforts to improve ingress/egress from the existing subway platforms in PATH’s Exchange Place Station, a new 18-foot horseshoe cross-passage tunnel was constructed by Walsh Construction who retaine
Dec 1, 2022
-
Applications of Artificial Intelligence in Tunnel Design and Construction - NAT2022
By Gunjan R. Bhattarai, Kumar Bhattarai
Recently, there has been an enormous increase of interest in artificial intelligence (AI), machine learning (ML), and their applications by researchers, government agencies, and the underground constr
Dec 1, 2022
-
To Swell or Not to Swell—Design of Underground Structures in the Presence of Swelling Clays - NAT2024
By Daniel Maine
Swelling clay soils have been problematic to many types of infrastructure in the United States. However, their impact on underground construction is often misunderstood. The use of swell pressures in
Jun 23, 2024
-
Unique Aspects of Remote High Altitude Water Tunnel Repair - NAT2024
By David Jurich, Ed Perko, Jacob Prezkuta
Numerous Colorado mountain tunnels that date to the late 1800s convey water to the farming and urban communities of the eastern Front Range. Repairs to these remote facilities, often located in public
Jun 23, 2024
-
Re-Entrainment Of Coal Dust Particles: Wind Tunnel And In-Mine Studies (58089787-9484-4f12-b082-1f7f0e4fae1f)
By S. Shankar
Available literature on the effect of re-entrainment on overall airborne dust concentration in mine airways or the fundamental mechanisms of coal dust re-entrainment in mine atmosphere is scant. There
Jan 1, 1995
-
Rail Systems Approach to Design Fires
By Peter Johnson, David Barber, Lachlan Henderson
"Within underground portions of metro rail networks the traditional approach to a design fire has been to assume a worst credible railcar fire and develop ventilation and egress measures for life safe
Jan 1, 2016
-
Missouri River Intake Screen Structure and Tunnel: Overcoming Underground Challenges to Build Vital Infrastructure - RETC2023
By Ryan Ward
The Missouri River Intake Screen Structure and Tunnel (MRISST) is one phase of the Red River Valley Water Supply Project (RRVWSP), a vital piece of infrastructure in the state of North Dakota to trans
Jun 13, 2023
-
Quantitative Description and Definition of Soft Rock Tunnel
By Guangming Zhao, Nianjie Ma, Demao Guo, Denghong Chen, Yingming Li
Based on the mechanical essence that large-scale plastic failure zone appears in all or part of surrounding rock in soft rock roadway, the numerical simulation method is used to study the rectangular
Jun 25, 2024
-
Rehabilitation of New Croton Aqueduct Shafts
By W. James Marold
The New Croton Aqueduct (NCA) was the first major water supply tunnel for New York City. The 50-km (31-mi) long tunnel has 33 open shafts 6 m (20 ft) to 121 m (397 ft) deep. The tunnel and shafts are
Jan 1, 2008
-
Suppressing Dust during Tunnel Construction Using Automated Mist Technology
By Mike Lewis
"Descending several stories down a metal staircase into a shaft spanning a quarter city block -- soon to become Roosevelt Light Rail Station in Seattle, WA -- visitors are greeted with four perfectly
Jan 9, 2017
-
Design of a Laboratory Scale Wind Tunnel for Studying of Mine Fires
By K. D. Luxbacher, J. T. Davis
"A wind tunnel was designed to examine air flow, heat transfer and layering near an active fire at a working face. This tunnel simulates an active entry in an underground coal mine including an attach
Jan 1, 2017
-
Design of the Underground Structures of the Railway Link between the Town of Thumrait and the Port of Salalah: Segment 4c of the “Oman National Railway Project”
By Pedone Ezio Michele, Mohamed Dahir Holad
"The 4c segment is a part of the ""Oman National Railway Project” linking the mining area in the surroundings of Thumrait and the port of Salalah. It is 90 km long and the last 40 km stretch crosses a
Jan 1, 2016
-
Ground Improvement Works and Construction of Six SEM Adits as Part of the Northeast Boundary Tunnel Project in Washington, D.C. - NAT2022
By Basilio Giurgola, Federico Bonaiuti, Norbert Fuegenschuh
The North East Boundary Tunnel (NEBT) project in Washington, D.C. requires design and construction of several SEM adits which have to be built between lateral shafts and the NEBT-TBM Tunnel. The paper
Dec 1, 2022