Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Reduce Urban Tunnel Utility Relocation Risk through Early Relocation by Specialty Contractor
By Justin Carl, Aliuddin Mohammad, Gordon Evans, Steven Bealby, Carlton Ray
"The District of Columbia Water and Sewer Authority (DC Water) is implementing the $2.2-billion DC Clean Rivers Project (DCCR) to control combined sewer overflows (CSO) to the Anacostia and Potomac ri
Jan 9, 2017
-
Toledo Waterways Initiative—Completion of an 18-Year LTCP Program - RETC2021
By Leo Gentile, David Selhorst
The $528 million Toledo Waterways Initiative (TWI) was implemented by the City of Toledo in 2002 and completed in August 2020. Toledo is one of many US cities required to implement a Long-Term Control
Jun 13, 2021
-
Hard Rock TBMs—The Experience of Brenner Basis Tunnel, Construction Lot Mules 2-3, for the Evaluation of Risk Prediction Tools - RETC2023
By A. Mei, F. Amadini, F. Cernera, D. Baliani, A. Flor, M. La Morgia, F. Sassi
The risk of TBM jamming because of squeezing rock mass or excessive caving (instability of the cavity) conditions is always a focal point while boring long and deep tunnels with shielded TBMs. Mechani
Jun 13, 2023
-
Hydrologic Investigation, Design And Construction Of Flood Control Structures, Copperhill, Tennessee
By Ulrich Kappus
The purpose of the project is to divert flood flows of North Potato Creek. The project is located in the southeast corner of Tennessee near Copperhill, approximately 160 kilometers north of Atlanta, G
Jan 1, 1978
-
Monitoring and Data Management Challenges at the Metro Project Cityringen Copenhagen
By Klaus Rabensteiner, Klaus Chmelina
"INTRODUCTION Urban tunneling is often related with special geotechnical risks. Typical causes are difficult (hydro)geological conditions, a very low overburden and the presence of critical and vulner
Jan 1, 2016
-
Use Of Tunnel Boring Machines At The Stillwater Mining Company's Underground PGM Mines
Stillwater Mining Company has an extensive history with tunnel boring machines (TBM) at the Stillwater and East Boulder underground PGM mines in Montana. The first use of a TBM was a 4 m (13 ft) diame
Jan 1, 2012
-
Compensation and Jet Grouting as Mitigation Measures for a TBM Operation
By Valerio Violo, Antonio Raschilla, George Kafantaris
"The Cityringen project in Copenhagen, Denmark will form a new circular line in the city center and will consist of 21 new stations (17 + four transfer stations) and approximately 31 km (19 miles) of
Jan 5, 2017
-
Milwaukee's Northeast Side Relief Sewer System
By Theodore H. Budd, Douglas J. Heinz
This report concerns the successful construction of Contract No. 287 of the Northeast Side Relief Sewer System for the Metropolitan Sewerage District of the County of Milwaukee. The contract involved
Jan 1, 1983
-
Riyadh Metro TBM Construction and Knowledge Transfer
By Henning Schwarz, Ade Ogunsola, Anas Almousa
"The Riyadh Metro, commissioned by Arriyadh Development Authority “ADA” - the executive arm of The High Commission for the Development of Arriyadh -, forms part of a new public transport-system of Sau
Jan 1, 2016
-
Innovative TBM Launching in Urban Areas - RETC2023
By Fabrizio Fara
The Ship Canal Water Quality Project (SCWQP) includes a 2.7-mile long, 18'-10" internal diameter tunnel which is located inWest Seattle. Tunneling in urban areas and soft ground conditions (Till and T
Jun 13, 2023
-
Unique Characteristics for the Design and Construction of the New Twin Tunnel “Caltanissetta”, on Highway 640 in Sicily, Italy - Practical Experience in Using ø15.08 m (50 feet) Diameter E.P.B. Machine
By Pier Francesco Paglini, Gian Luca Menchini, Pier Francesco Boschi
"PROJECTThe “Caltanissetta” Tunnel is part of the ANAS S.p.A (National Autonomous Roads Corporation) $ 1.3 Billion Highway 640 Caltanissetta-Agrigento (Sicily, Italy) Rehabilitation Project, consistin
Jan 1, 2016
-
Value Engineering for the Shoreline Consolidation Sewer: An Example of Collaboration Between Owner, Engineer, and Contractor - NAT2024
By Colin Irwin, Adrian Naranjo-Castillo, Christopher Petta, Eric Zarobila
The Shoreline Consolidation Sewer is a CSO control project in Cleveland, Ohio that requires the installation of 5,000 feet of 72-inch inside diameter pipe using microtunneling methods. After award, th
Jun 23, 2024
-
Environmentally Friendly Soil Conditioning for EPB TBM: The State of Environmental Considerations in North America and Around the World - NAT2022
By T. Murt, C. Oñate
In recent years, environmental considerations have played a prominent role in underground construction projects. The management and disposal of the muck produced by an EPB TBM is an important aspect o
Dec 1, 2022
-
Improving Contracting Methods--The Owner's Viewpoint
By Sammie D. Guy
This paper discusses the subject of "Improving Contracting Methods" from the owners point of view, particularly the public. An overview is given of the work of the U.S. National Committee on Tunneling
Jan 1, 1983
-
Successful Project Team Integration for Riverside Badlands Tunnel
By Drupad B. Desai, James G. Gallanes
A key component of the Inland Feeder Project is the Riverside Badlands Tunnel, a7.9-mile stretch subjected to high internal and external hydraulic pressures passing beneath highly eroded hills in a se
Jan 1, 1997
-
Vermont/Hollywood Tunnel Project Los Angeles Metro Redline Contract B251 Development of the Main Work Site Los Angeles, California
By Shelley M. Burg, Dennis K. Poulton, Robert B. Gordon
This project includes the excavation and concrete lining of approximately 18 900 m (62 000 ft) of 5.5 m (18 ft) finished diameter subway tunnel for the Los Angeles MTA. The project required that four
Jan 1, 1995
-
Overview of NFPA 502 Standard for Road Tunnels, Bridges and Other Limited Access Highways, 2008 Edition
By William Connell
NFPA 502, Standard for Road Tunnels, Bridges and Other Limited Access Highways establishes minimum fire protection and fire life safety requirements for road tunnels, bridges and other roadways where
Jan 1, 2008
-
Evaluation of Alternative Techniques for Excavation Damage Characterization
By Jeroen van Eldert, Daniel Johansson, Henrik Ittner, Håkan Schunnesson
"Numerous aspects of underground construction, from structural stability to construction costs, depended on the tunnel quality, including blast damage and the Excavation Damage Zone. Accurately quanti
Jan 1, 2016
-
A Study of Jet Fan Aerodynamics
By Kuda R. Mutama, Allen E. Hall
A wind tunnel investigation into the fundamental characteristics of jet fan performance is described. The effects of varying fan positioning in a square tunnel cross section are reported for two fan o
Jan 1, 1997
-
Washington Metropolitan Area Transit Authority Underground Projects
By Richard Louis Viner, William D. Leech, Walter A. Mergelsberg
With the construction management team established and a full funding agreement secured the Washington Metropolitan Area Transit Authority (WMATA) now has the manpower and the financial resources to co
Jan 1, 1987