Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Full PSD rejects shear strength testing for co‐disposal and assisted tailings dewatering technique selection
By G Burton, S Fityus, J Li, S Vaughan, D Payne
Daunia and Caval Ridge coal mines, owned and operated by BHP, have been co-disposing rejects and dewatered tailings within spoil dumps from the beginning of their operations in 2013 and 2014, with the
Jul 1, 2021
-
Flow sheet development for treatment of rare earth ores
By M S. Henderson, R D. Alorro, L G. Dyer
An alternative leaching system for rare earth element recovery from monazite is under development. The initial stage utilises oxalic acid to convert the rare earth phosphate into an oxalate salt throu
Aug 24, 2022
-
A short review – hydrogen reduction of copper-containing resources
By M I. Pownceby, M A. Rhamdhani, D M. Fellicia, S Palanisamy, R Z. Mukhlis
The trend of global copper production has prospectively increased over time. Based on typical mined ore grades, 1 t of copper ore generates approximately 6–10 kg of copper, which requires much energy,
Jun 19, 2024
-
Increased drilling accuracy leads to significant improvement in ore recovery and dilution
By R Stimpson, B Johnson, B Hesse
During a period of twelve months between FY18-19, a series of trials were conducted to compare production drilling accuracy using two different methodologies, and the subsequent impact this had on sto
Mar 15, 2021
-
Reduced Development through improved Rise and Widening Firings using Orica WebGen™ at Ernest Henry Mine
By J Say, M Hawtin, L Carlon, P Cann
Historically, production from sublevels of the Ernest Henry Mine (EHM) started from blind uphole rises at the end of slot drives. Where previous investigations considered removing these slot drives an
Mar 15, 2021
-
Application of three lines model in resource and reserve estimation and reporting
By D Hope, D K. Mukhopadhyay, J D. Harvey
South32 (S32), a globally diversified mining and metals company, is listed on securities exchanges around the world (ASX, JSE, LSE), with its primary listing being on the Australian Securities Exchang
May 24, 2023
-
Steve and Fred would have been mates – a comminution design evolution story
By D David
Amongst those whose task it is to design tumbling mills and other comminution machines there is an almost religious divide between devotees of the Bond method and devotees of other methods developed i
Sep 11, 2017
-
Evaluation of the Ernest Henry Cu-Au Deposit Mineral Resources
By A J. Ryan
The Ernest Henry copper-gold Mineral Resource is the major asset heldby Ernest Henry Mining Pty Ltd, comprising A$6.4 billion of containedmetal. The case history presented below describing the evoluti
Jan 1, 1998
-
Developing Assessment Methods and Remediation Protocols for New Zealand Sites Impacted by Acid Mine Drainage
By A Black, A de Jo, J Cavanagh, J Harding
Acidic and metal-rich waters have been discharging from Sullivan Mine, West Coast, New Zealand since the closure of the mine during the early- 1990s. This has resulted in a decrease in pH from a backg
Jan 1, 2003
-
The practicalities of effective stress measurement in rock
By I Gray
This paper examines the practical limitations that affect the measurement of stress in rock. As most rock stress measurement is conducted through the invasive process of drilling a hole in a rock mass
Nov 30, 2018
-
Design and Construction of Sydney’s South West Rail Link Hume Highway Underpass
By B Chapman, R Nievergelt, J Hill
A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume
Sep 17, 2014
-
Closure Planning Lessons Learnt from the Century Mine
By J Crosbie, M Lord, R Bitencourt, P Defferrard
The MMG Century mine, which is the largest zinc/lead mine in Australia, began operating in 1999 and ceased mining from the open pit in July 2015, with processing completed in early 2016. Closure plans
Jun 22, 2016
-
Unlocking Processing Potential by Empowering Our Operators
By X Li, W McKeague, M S. Powell
This paper explores the importance of operators in the overall efficiency of mineral processing plants. With the potential of future control configurations becoming more remote, it is time to review t
Oct 29, 2012
-
The Pre-Feasibility Study – Big Choices, Little Time
By D J. Logan, J Jackson
"As of 1 December 2014, the 2012 edition of the JORC Code requires Ore Reserves to be defined by studies at the pre-feasibility or feasibility level. This paper examines how the pathway for most minin
Mar 8, 2016
-
Monorail Technology - A Rapid and Cost-Effective Method of Decline Development
By B Besa
Australia is a world leader in the design and operation of mines accessed by the decline method. Literature indicates that a number of metalliferous underground mines using the decline system are also
Jan 1, 2008
-
Coal Bursts in the Deep Longwall Mines of the United States
By C Mark
Coal bursts involve the sudden, violent ejection of coal or rock into the mine workings. They are a particular hazard because they typically occur without warning. During the past two years, three US
Nov 5, 2014
-
Modelling Blast Movement for Grade Control at an Open Cut Gold Mine
By E J. Sellers, A Cocker
Movement of the fragmented rock mass is an inevitable consequence of open cut blasting. Uncontrolled, unaccounted movement from blasting commonly causes ore loss and dilution from waste mixing. Theref
Aug 18, 2014
-
Multivariate Block Simulations of a Lateritic-type Nickel Deposit and Post-processing of a Representative Subset
By J Deraisme, P Epinoux, O Bertoli
"Société le Nickel exploits the Dôme lateritic nickel orebody at its Tiébaghi operations in New Caledonia. The site geology has an obvious bearing on recovery and metallurgical performance, with contr
Nov 24, 2014
-
Negatively Geared Ore Reserves – A Major Peril of the Break-even Cut-off Grade
"Recognising that the mining industry is wedded to the break-even cut-off grade rather than a cut-off grade that optimises value, the author examines some perils and pitfalls in the use of break-even
Mar 8, 2016
-
El Teniente New Mine Level Project
By R Pozo, F Reyes
Codelco Chile is currently developing the El Teniente û New Mine Level Project (NMLP) in order to increase ore production by seeking to mine the ore deposit located under the current operational orebo
Jan 1, 2008