Geochemical and Groundwater Factors Contributing to the Corrosion of Rock and Cable Bolts – An Experimental StudyBy H. L. Ramandi, P. Moore
"The corrosion of support bolts in underground mines has become an increasingly prevalent issue over the past two decades. With an increase of premature failures due to Stress Corrosion Cracking (SCC)
Jan 1, 2017
-
A Geometric Scaling Approach to Evaluate Tire-Oil Sand InteractionsBy T. G. Joseph, A. Sharma
ABSTRACT: Ultra-class haul trucks operating in oil sand face operational and maintenance issues as a result of soft underfoot conditions (Joseph, 2002). With exposure to frequent high g loading events
Jan 1, 2011
-
Agnico-Eagle Laronde Plant: Metallurgical Challenges Present and FutureBy J. Cayouette, . Blatter, P. Cousin
The Laronde mill was commissioned in 1988 and has been treating the Laronde Perim ore since 2000. The Laronde plant, situated in the Abitibi region of Quebec, has experienced mill expansions to accomm
Jan 1, 2011
-
The Wellington Lake Power ProjectBy E. M. Stiles
THE Wellington Lake power plant of the Consolidated Mining and Smelting Company of Canada, Limited, about 25 miles from Goldfields, Saskatchewan, is the second hydro-electric project operating in that
Jan 1, 1940
-
Probabilistic Analysis for Mine Design, Using Coal Pillar Design to Illustrate its Potential UsefulnessBy T. R. Kostecki, J. Hirschi
"Analytical engineering design is based upon a trial-and-error iterative and deterministic process. Within this process, the engineer obtains some estimated values, plugs them into de facto closed-for
Jan 1, 2015
-
Advances in Infrared Spectroscopic Sensing Towards Improvements in Geological and Geotechnical ModelsInfrared spectroscopic data collected using HyloggerTM technology is being used to assess the mineral composition of Archean iron ore bedrock and Cenozoic detrital units in Western Australia’s Pilbara
Jan 1, 2015
-
The Electric Mining Shovel as a Primary Digging Tool for Open-Pit MiningBy W. J. Cherones
This paper describes the history of the development and application of the electric mining shovel in open-pit mining, dea1ing particularly with far-reaching advancements in three primary areas: metall
Jan 1, 1972
-
Size Enlargement by Agglomeration in Mineral ProcessingBy W. Pietsch
For a number of reasons, solids entering and leaving facilities for the treatment of minerals are becoming increasingly finer. Such materials pose problems throughout processing. Solids featuring smal
Jan 1, 2004
-
Mount Milligan Mine Performance UpdateBy B. Simonian
"The Mount Milligan mine, located in central British Columbia, began operation in September 2013 with a design nameplate capacity of 62,500 dry metric tonnes per day, using a conventional SABC grindin
Jan 1, 2019
-
Pyrrhotite Rejection at the Strathcona MillBy J. Coffin, M. Muinonen, D. Fragomeni, R. Multani, C. Deredin
"Rejection of pyrrhotite from pentlandite is of critical importance to the economics of nickel concentrate production and the main goal of the Strathcona milling operations. A joint team of XPS, Glenc
Jan 1, 2018
-
The Use of Mercury to Inhibit Autoclave Preg-Robbing of Gold: Pilot Plant TrialsBy L. V. Chugaev, Y. M. Shneerson, P. V. Zaytsev, I. V. Fomenko, M. A. Pleshkov
"Pressure oxidation (POX) is one of the most common and reliable methods of processing gold-bearing sulfide concentrates. However, when processing concentrates that contain natural carbonaceous matter
Jan 1, 2017
-
The Significance of Modeling the Excavation Sequence in Numerical Analysis of Underground OpeningsBy X. T. Feng, Y. H. Hatzor, Y. Tal, G. Yagoda-Biran
"When studying jointed rock mass deformation around underground openings it is of great importance to model correctly the excavation sequence during the numerical simulation. This is because for effec
Jan 1, 2015
-
Flowsheet Development and Integrated Pilot Plant Testing for a Pyrochlore Bearing Carbonatite OreBy S. Kelebek, B. Ingram, C. Gibson, T. MacNeil, M. Aghamirian
"The beneficiation and upgrading of pyrochlore from its ores is carried out through flotation. In industrial practice, upgrading is conducted in a two-stage flotation process in which pyrochlore flota
Jan 1, 2016
-
Incorporating Rock Reinforcement Elements into Numerical Analyses Based on the Hybrid Finite-Discrete Element Method (FDEM)By O. K. Mahabadi, A. Lisjak, B. S. A. Tatone, N. Vlachopoulos
"Numerical simulations are widely adopted in the design of several types of rock structures, including tunnels, caverns, rock cuts, and open pit and underground mines. In recent years, analyses based
Jan 1, 2015
-
Mount Isa Mines Necessity Driving InnovationBy N. Aslin, G. Heferen, H. DeWaal
"Mount Isa Mines (MIM) acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry starting in the 1978’s through until the early 2000’s.
Jan 1, 2018
-
Water Quality Monitoring at the Site Of a Proposed Base Metal Mining ComplexBy C. J. Edmonds, R. Bland, W. C. Ferguson, R. Whitehead
"In 1969, the Environmental Science Division of James F. MacLaren Limited received authorization from The International Nickel Company of Canada, Limited to carry out a water quality monitoring progra
Jan 1, 1973
-
Development of Innovative Recycling Technologies for Sustainable Metallurgical IndustryBy M. A. Halim, V. I. Lakshmanan
Recycling is one of the key elements for sustainable process development for the recovery of value-added products and reducing environmental impact. Process Research ORTECH Inc. has developed several
Jan 1, 2015
-
Canadian 1970’s Energy Strategy - Conserver Society - SustainabilityBy H. J. McQueen
About 1973 the abrupt decrease in crude oil shipments due to political action by Middle Eastern suppliers, caused a shortage and a steep price rise. In response, Canada had to develop strategies of di
Jan 1, 2015
-
Ontario?s Experimental Plant for Resource RecoveryBy B. I. Boyko
As part of the Ministry of the Environment's Resource Recovery Program, the Province of Ontario has constructed a $13 million "Experimental Plant for Resource Recovery" in Metropolitan Toronto. T
Jan 1, 1978
-
Some Testwork InterpretationsBy J. C. Loretto, H. A. Simons
The paper discusses how, in the routine testing of ores, insufficient communication between the laboratory and the design personnel can lead to misunderstanding or misinterpretation of test results an
Jan 1, 1972