    Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley Mine

    By Terry Eldridge, Keith MacKay, David Siddle, Luke Moger

    On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water

    Jan 1, 2016

  • DFI
    St. Louis Service Base Floating Wharf Mooring System Replacement

    By A. Bozorgzadeh, B. M. Jensen, B. N. Koelling, B. R. Murtaugh

    "The Service Base mooring system originally consisted of two general types of structures, 19 timber piles cabled together and steel three-legged pipe piles. The St. Louis District fleet moored to the

    Jan 1, 2017

  • DFI
    The Use of DSM Columns to Control Heavy Haul Railway Embankment Stability

    By Kim Chan, Bryn Thomas, Ben Dening

    "Increased rail capacity is required into Kooragang Coal Terminal near Newcastle, NSW, Australia to relieve rail traffic congestion and improve management of train arrivals. An additional arrivals tra

    Jan 1, 2015

  • DFI
    Cost Effective Drilling Of Extra Large [XL] Monopile Foundations

    By Phil Wilkinson, Sam Whitaker

    "The installation of large (XL) diameter monopiles offshore typically requires expensive and specialist plant, equipment and vessels. Due to the increasing size (weight, diameter and length) of the fo

    Jan 1, 2017

  • DFI
    A Resilience Approach for Design of Earth Retaining Systems with Application on MSE Walls

    By George Gazetas, Sissy Nikolaou, Fani Gelagoti, Irene Georgiou, Rallis Kourkoulis

    "The need to shift geotechnical design from a “factor of safety” to a “performance based” design (PBD) approach has increased rapidly in the past years following examples from structural engineering.

    Jan 1, 2016

  • DFI
    Innovative Alternate Underpinning Solution for Historic Structure in Boston Suburb

    By Eric P. Bregman, Justin Zarrella, Ryan M. Coulson, Connor Johnson

    Within a prominent Boston, MA suburb are a pair of historic stone and mortar structures built in the late 1800’s. Both the Main House and Carriage House have been maintained and occupied throughout th

    Sep 8, 2021

  • DFI
    Innovative Design for Retaining Structures using Combined Products

    By Clifford Taylor, Alexander Zöhrer

    "The execution of deep basement excavations under narrow conditions is one of the most challenging tasks in geotechnics. The vicinity of neighbouring buildings, roads, and underground structures such

    Jan 1, 1900

  • DFI
    30 Hudson Street Foundation Design and Construction in Variable Rock

    By Joel Moskowitz, George J. Tamaro

    "A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140m by 100m, will include 4 basements under the entire footprint. The perimeter was to be s

    Jan 1, 2004

  • DFI
    Quality Assessment of Seismic Data Sets and the Impact on Interval Velocity Estimates in DST

    By Gerald Verbeek, Erick Baziw

    "Downhole Seismic Testing (DST) is an important geotechnical testing technique for site characterization as it provides low strain (<10-5) in-situ interval compression (Vp) and shear (Vs) wave velocit

    Jan 1, 2017

  • DFI
    PPP Contract Delivery System- Contractual Risks and Ethical Issues Regarding Deep Foundation Subcontractors

    By Alexander Filotti, Richard Kalson

    "1. INTRODUCTION- WHAT IS P3 OR PPP ?The Public Private Partnership (PPP or 3P) is a project delivery scheme based on the government providing land and/or a concession agreement, and on a private enti

    Jan 1, 2017

  • DFI
    Level Crossing Removal Project – Package 1

    By Andrew Middleton, Mick Stadter, Chris Crowe, David Chong

    "The Level Crossing Removal Project – Package 1 is part of the Victorian Governments commitment to remove 50 of the most dangerous and congested level crossings across Melbourne. This involved removin

    Jan 1, 1900

  • DFI
    Foundation Rehabilitation of the Henry Hudson Bridge

    By Dharmil S. Patel, Zoyav S. Benyaminov, Cassandra A. Wetzel

    Rehabilitation of the Henry Hudson Bridge is nearing completion, connecting Spuyten Duyvil in the Bronx to Inwood Hill in Manhattan, New York. Constructed in 1936, the Henry Hudson Bridge spans 840 fe

    Sep 8, 2021

  • DFI
    Dynamic Response of Short Piles under Lateral Transient Load

    By Ambarish Ghosh, Rituparna Dey, Indrajit Chowdhury

    "In port and harbor facilities, jetties and cargo berth terminals are usually installed on piles that remain partially embedded in soil, while a part of it behaves as columns supporting top deck. Tech

    Jan 1, 2015

  • DFI
    Hudson’s Revitalization: The Use of Robotics in the Work Place

    By Dave P. DeClerck

    Hardman Construction was faced with the challenge of completing a large earth retention project on a constricted downtown Detroit site, while maintaining a safe and productive worksite. To do so, new

    Jan 1, 2019

  • DFI
    Undergraduate Learning Commons

    By William M. Tanner, Daniel C. Brahana

    "A drilled pier foundation was originally designed to support the proposed G. Wayne Clough Undergraduate Learning Commons on the campus of Georgia Tech in Atlanta, GA. Reflective of the site geology,

    Jan 1, 2015

  • DFI
    Wolf Creek Dam Foundation Remediation – An Innovative Solution

    By Fabio Santillan, Lyndon Bedford

    "This paper presents the main features of the Wolf Creek Dam Foundation Remediation Project, highlighting the innovative construction approach and stressing on how the collaboration between the contra

    Jan 1, 2015

  • DFI
    Seepage Barrier at Bolivar Dam

    By Mohamed Elgouhary, Carol L. Tasillo, Daniel Koziol

    "The Bolivar Dam, located near the Village of Bolivar, Ohio is one of a system of dams designed to provide flood control and water conservation in the Muskingum Watershed. The Bolivar Dam is a “dry da

    Jan 1, 2016

  • DFI
    The Use of Rigid Inclusions to Support Large Spans

    By Michael Shedlosky, Sonia Sorabella Swift, Nina Carney, David Tarasovic

    Rigid inclusions were used to support roadway fills and mechanically stabilized earth (MSE) walls for the South Capitol Street Corridor project. The first phase of this two-phase, nearly $1 billion pr

    Jan 1, 2019

  • DFI
    Testing and Optimizing Rammed Stone Columns Design as a Soil Improvement Method on Soft Soils for MSE Walls Foundations

    By Bernardo J. Jiménez Vega, Edy L. T. Montalvan

    Rammed stone columns and similar reinforcement systems are used worldwide more frequently as a cost-effective method for improvement of foundations on soft soils. The effectiveness of the treatment me

    Sep 8, 2021

  • DFI
    Ground Improvement Using Compaction Techniques on Calcareous Sands and Verification Tests Procedures

    By Vijaya Bhushan Rao, Jason Redgers

    A mixed-use development comprising of multistoried residential towers, retail and associated infrastructure covering an area of 500,000 m2 is under construction in Dubai. The subsoil conditions consis

    Sep 8, 2021