Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
- 
                     Carbothermic Reduction of Iron Oxide and Coal Composite in Packed Bed Combustion Process Carbothermic Reduction of Iron Oxide and Coal Composite in Packed Bed Combustion ProcessBy T Kitajima, T Kawaguchi, T Nakamura Carbothermic reduction of iron oxide is an attractive mechanism to produce metallic iron, since it can directly utilise coal as both reductant and fuel. To improve energy efficiency and productivity o Jan 1, 2000 
- 
                     Carboxylic Acids Modified by Dithio Fragments as Reagents for Gold and Copper Containing Ores Flotation Carboxylic Acids Modified by Dithio Fragments as Reagents for Gold and Copper Containing Ores FlotationBy Abdurazakov A, Avrakhov A, Solozhenkin P The flotation properties of acetic acids modified by xanthic and dithiocarbamic fragment in regards to copper and ferrous minerals and their noble metal containing ores have been investigated. The Jan 1, 1993 
- 
                     Carburisation and melting of hot compacted iron in a coke bed Carburisation and melting of hot compacted iron in a coke bedBy M Kim, J Park, I-K Suh, E Kim, J Lee One of the key technologies in developing hydrogen-enriched ironmaking operations is the control of the carburisation, melting, and dripping behaviour of the iron ore burden materials. When a hot comp Aug 21, 2024 
- 
                     Cardox Blasting Trials at Waihi Gold Mining Cardox Blasting Trials at Waihi Gold MiningBy A Van Kersen, J Hodson Waihi Gold Mining Co Ltd [WGM], operated by Normandy Mining, has been internationally recognised for its achievements in environmental management at the Martha Mine at Waihi. In a proactive approach t Jan 1, 2001 
- 
                     Carmen Copper – A Sustainable Approach to Tailings Thickener Upgrades Carmen Copper – A Sustainable Approach to Tailings Thickener UpgradesBy C Maloloy-on, S Morgan, M Deiparine, H Mackie There is a strong focus in the mining industry to limit its impact on water quality and usage. This is even more evident in developing countries, where mining companies operate within local communitie Sep 7, 2015 
- 
                     CaroÆs Acid its Introduction to Uranium Acid Leaching in Australia CaroÆs Acid its Introduction to Uranium Acid Leaching in AustraliaAfter extensive testing and a period of plant trials to establish the benefits of Caro's acid (H2S05) as an alternative oxidant, Queensland Mines Limited (QML) decided to replace pyrolusite w Jan 1, 1984 
- 
                     CaroÆs Acid Queensland Mines Plant Trials CaroÆs Acid Queensland Mines Plant TrialsBy Fulton E, Ring RJ, Waters DJ Laboratory leach tests of Nabarlek uranium ore carried out by the Australian Atomic Energy Commission to compare the effectiveness of Caro's Acid1 (permonosulphuric acid) as an alternative oxi Jan 1, 1978 
- 
                     Carpentaria and Mount Isa Mineral Province Study Carpentaria and Mount Isa Mineral Province StudyA unique opportunity is presented to Australia by recent developments in the Carpentaria and Mount Isa Mineral Province.Unique in two ways:The size, diversity and multiplicity of mineral finds in the Jan 1, 1993 
- 
                     Carrapateena Crows Foot Level Layout – Safety in design to support sub level cave production efficiency and automation Carrapateena Crows Foot Level Layout – Safety in design to support sub level cave production efficiency and automationBy A Mooney, J Marsden, H Grosser, G Dunstan Carrapateena is a copper-gold deposit hosted in a brecciated granite complex, located 500km North of Adelaide, South Australia. The deposit is being mined using the Sub Level Caving (SLC) Mining metho Mar 15, 2021 
- 
                     Carrapateena Crusher Station One – Optimisation and excavation Carrapateena Crusher Station One – Optimisation and excavationBy A Mooney, G Balog, P Burns, R Brooks This paper outlines the rationale for the location of the crusher, geotechnical analysis and basis of ground support design, design and scheduling of the chamber and supporting excavations as well as Mar 15, 2021 
- 
                     Carrapateena project to date – Geotechnical risks and management Carrapateena project to date – Geotechnical risks and managementBy G Balog, T Ormerod, D Cox This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana Mar 15, 2021 
- 
                     Carrapateena Vent Rise Performance – Geotechnical Design and Calibration Carrapateena Vent Rise Performance – Geotechnical Design and CalibrationBy G Balog, T Ormerod, D Sidea Carrapateena is a copper-gold sub level caving operation located in the Gawler Craton, South Australia. One of Australia’s largest undeveloped copper deposits, the project will be a 4.25 Mtpa undergro Mar 15, 2021 
- 
                     Case Examples of Stability on Surface Mining Projects Case Examples of Stability on Surface Mining ProjectsStability on surface mining projects is primarily controlled by five factors. These include structural geology, the most important of the factors, the existence of weak layers, primarily clayey go Jan 1, 1986 
- 
                     Case Histories of Hard Rock Tunnelling Using a Multi-boom Hydraulic Drilling Jumbo Case Histories of Hard Rock Tunnelling Using a Multi-boom Hydraulic Drilling JumboBy Wright R. J The Commission called tenders for a four boom hydraulic jumbo, plus basket, on an art- iculated carrier in Sept. 1977. Atlas Copco submitted the successful tender in Jan. 1978 for the supply of a th Jan 1, 1981 
- 
                     Case Histories – Roller Compacted Concrete Dam Waterproofing with a Bituminous Geomembrane in Chile and a Tailings Dam in Peru Subject to an Earthquake of 8.1 Magnitude Case Histories – Roller Compacted Concrete Dam Waterproofing with a Bituminous Geomembrane in Chile and a Tailings Dam in Peru Subject to an Earthquake of 8.1 MagnitudeBy R McIlwraith, B Breul Two case studies are presented in this paper. The first one discusses a roller compacted concrete water supply dam that was constructed in El Mauro in Chile to provide water for agriculture activities Jul 27, 2015 
- 
                     Case History of the Corridor Orebody, Mount Lyell, Tasmania Case History of the Corridor Orebody, Mount Lyell, TasmaniaBy McKenzie A. M The Corridor ore body is so named because it occurs in an east-west zone or corridor of schist bounded on the north by the siliceous conglomerates of Mount Lyell, and on the south by similar conglomer Jan 1, 1961 
- 
                     Case History of the Discovery of the Hishikari Gold Deposit, Japan Case History of the Discovery of the Hishikari Gold Deposit, JapanThe Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed e Jan 1, 1995 
- 
                     Case History of the Discovery of the Hishikari Gold Deposit, Japan Case History of the Discovery of the Hishikari Gold Deposit, JapanThe Hishikari gold deposit, discovered by the Metal Mining Agency of Japan, has become a giant class epithermal gold deposit with the highest grade of gold yet recorded in the world through detailed Jan 1, 1995 
- 
                     Case Studies Demonstrating Value from Geometallurgy Initiatives Case Studies Demonstrating Value from Geometallurgy InitiativesBy A R. Bye The mining industry is facing some key challenges that provide a compelling case for geometallurgy initiatives. Over the last 30 years, the average grade of Australian orebodies being mined has halved Sep 5, 2011 
- 
                     Case studies for integrating rehabilitation planning with mine planning in strip mining Case studies for integrating rehabilitation planning with mine planning in strip miningBy I Neilsen, A Walker, A Hooper Final landform planning in Deswik software was used to determine if integration into the mine plans could achieve better closure outcomes. Using the dump surface outputs from the Deswik Landform and H Jul 25, 2018 
