Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Critical Assessment of Machine Learning Algorithms as Estimation Techniques for a Polymetallic Ore Deposit

    By D Misra, R Ganguli, S Bandopadhyay

    The objective of this paper is to assess the accuracy and applicability of recent state-of-art methods such as the machine learning algorithms (MLA) for mineral resource estimation. Conventional metho

    Sep 26, 2011

  • AUSIMM
    Critical Comparison of Julius Kruttschnitt Mineral Research Centre (JKMRC) Blast Fragmentation Models

    By I Brunton

    Blast fragmentation can have a significant impact on the profitability of a mine. An optimum run of mine (ROM) size distribution is required to maximise the performance of downstream processes. If thi

    Jan 1, 2001

  • AUSIMM
    Critical control management – our journey so far and the road ahead

    By A Deakin

    It has been almost a decade since the release of the International Council of Mining and Metals (ICMM) Health and Safety Critical Control Management: Good Practice Guide (2015a). During this time the

    Apr 16, 2024

  • AUSIMM
    Critical Issues for Life Cycle Impact Assessment in Minerals Processing and Metals Refining

    By Y Hansen, J Petrie

    Life Cycle Assessment (LCA) is increasingly being used as a decision-support tool within mining and minerals processing and metals production. However, a number of initiatives have highlighted the cur

    Jan 1, 2004

  • AUSIMM
    Critical process design considerations from test work to operations

    By A Dennis, T Hunter, R Coleman

    For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin

    Sep 11, 2017

  • AUSIMM
    Critical risk management, good, but not good enough

    By D L. Head

    Critical risk management (CRM) has become one of the latest safety buzz terms in mining. Everyone seems to be doing it, everyone seems to know about it, yet we are still having fatalities in our indus

    May 5, 2022

  • AUSIMM
    Critical risks unveiled – the imperative of broad-brush risk assessments

    By C Young

    In the vast expanse of Western Australia’s mining sector, a critical issue has come to light: many mining operations overlook the power of a Broad-Brush Risk Assessment (BBRA) to uncover their critica

    Apr 16, 2024

  • AUSIMM
    Critical state soil mechanics in filtered TSF design

    By J Rola

    This paper outlines a laboratory-based design method, founded in critical state soil mechanics, for identification of an appropriate compaction specification to ensure dilative conditions prevail acro

    Jul 1, 2021

  • AUSIMM
    Cross Wellacoustic Tomography to Locate Abandoned Underground Mines and Subsidence Failure

    The U.S. Bureau of Mines has developed a prototype cross well acoustic logging system and complementary tomogr`aphic image reconstruction software for the detection and delineation of abandoned und

    Jan 1, 1992

  • AUSIMM
    Crown and Rib Pillar Recovery Techniques in Underground Hard Rock Mining

    By Szymanski J, Planeta S

    For many hard rock mines with near surface deposits, the surface crown pillars form the first line of protection for the immediate underground workings. Underground stopes are typically contained by

    Jan 1, 1995

  • AUSIMM
    Crown Minerals - Where it is at, What it Does

    My topic for today is the Crown Minerals of the future. New work initiatives are underway and the organisational structure is being overhauled. These are not insignificant changes and in this paper br

    Jan 1, 2003

  • AUSIMM
    Crusher Mainframe Failures-Mount Isa Mines Limited

    By Howell IJ, Kirsopp R

    In June/July 1981 Mount Isa Mines Limited was confronted with a crisis situation in the crushing operation of the Lead/Zinc and Copper Concentrators. Three crusher mainframes developed serious crac

    Jan 1, 1978

  • AUSIMM
    Crusher Product: An Intelligent Mechatronic Approach to Product Characterisation

    By Bearman R. A, Parkin R. M

    Traditional quality control procedures for aggregates production within the quarry industry rely on off-line laboratory analysis, resulting in poor performance and inconsistent product quality. A hi

    Jan 1, 1995

  • AUSIMM
    CrusherMapperTM - A New Tool for Crusher Condition Monitoring

    CrusherMapperTM - A New Tool for Crusher Condition Monitoring The efficiency of mineral processing plants is entirely dependent on the availability of the plant equipment critical path. This typicall

    Sep 13, 2010

  • AUSIMM
    Crushers – An Essential Part of Energy Efficient Comminution Circuits

    By R Bearman

    The importance of crushers in the mining industry declined with the introduction and resultant dominance of AG and SAG based circuits, but the recent move to consider more energy efficient circuits ha

    Aug 8, 2011

  • AUSIMM
    Crushing and Screening Operations at Bougainville Copper Limited

    By Koginmo V. I

    The concentrator at Bougainville Copper Limited has an annual throughput of 48.2 million tonnes/year producing approximately 175,000 tonnes copper, 16.1 tonnes gold, and 50 tonnes silver. Convention

    Jan 1, 1988

  • AUSIMM
    Crushing and Screening Operations at Mount Tom Price

    Mine ore, reduced to minus 71/2 in. by primary crushers, is stockpiled. Size reduction of the reclaimed material by secondary and tertiary crushers is achieved in a closed circuit crushing and screeni

    Jan 1, 1970

  • AUSIMM
    Crushing Plant Performance-Mount Isa Lead/Zinc Concentrator

    By Russell J

    A sustained drop in the grade of Mount Isa lead-zinc-silver ore occurred in mid 1980. It was decided to increase concentrator throughput from 200 000 to 240 000 tonnes/four week period to maintain

    Jan 1, 1978

  • AUSIMM
    Crushing Plant Process Optimisation

    Crushing Plant Process Optimisation Design of processes in order to find the most efficient solution to a specific task is a difficult problem. Often the number of solutions are large and the optimal

    Sep 13, 2010

  • AUSIMM
    Crust and Uppermost Structure of the Arc Regions of the West Pacific Islands

    Single station group velocities of fundamental made Rayleigh waves over the period range 15-100 s are carguted for five provincial profiles of the West Pacific. Based on recordings of earthquakes arou

    Jan 1, 1990