Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Construction Contract C916 Beauty World Station and Tunnels, Singapore
By R McDonough
DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal
Sep 17, 2014
-
Design and Construction for the Widening of the M2 Norfolk Twin Tunnels
By A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys
The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o
Sep 17, 2014
-
Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, Malaysia
By B Chapman, B Gaida, L Drowley
The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw
Sep 17, 2014
-
Design and Construction of No. 2 Residue Dam at Rosebery
By West Coast Staff
Attention to the design of facilities for drainage, of both surface water and seepage, made it possible to attain, for a qam impounding residues from a concentrating mill, a more stable sand wall whic
Jan 1, 1958
-
Design and Construction of Sydney’s South West Rail Link Hume Highway Underpass
By B Chapman, R Nievergelt, J Hill
A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume
Sep 17, 2014
-
Design and Construction of the Access Tunnels for the New Top Ryde City Shopping Centre, Northern Sydney
By Q Yang
This paper describes the design and construction of three 7.2 m span access ramp-tunnels to the three level underground car park of the newly redeveloped Top Ryde City Shopping Centre in northern Sydn
Mar 8, 2011
-
Design and Construction of the City West Cable Tunnel, Sydney Australia
EnergyAustralia is a state-owned corporation in the state of New South Wales, whose responsibility includes ownership and management of an electricity distribution network. Expansion of the high volta
Jan 1, 2008
-
Design and Construction of the First Major Diamond Mine in Canada's Northwest Territories
No paper was submitted for the proceedings, verbal presentation only (no material available).
Jan 1, 1998
-
Design and Construction of the New Car Dumper Facility for the Dampier Port Upgrade Project
By A Radici, M Attwill
The Dampier Port Upgrade Project (DPU) involves an upgrade to Hamersley IronÆs Parker Point iron ore port facility at Dampier, Western Australia. The $US700 million DPU Project will increase Hamersley
Jan 1, 2005
-
Design and Construction of the Yarra River Crossing
By R Blair
The Domain and Burnley Tunnels, which are major features of the Melbourne City Link Project, are MelbourneÆs first road tunnels. They are 1.6 km and 3.5 km in length respectively and are being constru
Jan 1, 1999
-
Design and Construction of Tunnels for Northern Gateway Project, New Zealand
By M Behrens, A McPhee, B D. Hegan
This paper describes the design and construction of twin 400 m long road tunnels as part of the Northern Motorway Extension Project in Auckland, New Zealand. Construction of the tunnel civil works is
Jan 1, 2008
-
Design and Development of Energy-efficient Secondary Axial Flow Fans
By J J. L du Plessis, S Viviers, G Ratner
Escalating electricity costs are one of the biggest operational cost drivers in mining. The trend to use high-powered auxiliary fans delivering increased airflow to meet the dilution requirements of d
Aug 31, 2015
-
Design and Development of Slurry Sampling Equipment for Mount Isa On-Stream Analysis Equipment
By Wickham P, Raeburn M. R
The design and development of slurry sampling equipment for the Mount Isa Mines Limited on stream analysis installations is discussed in detail. Emphasis is given to the critical areas of slurry t
Jan 1, 1976
-
Design and Engineering of Flotation Circuits (in Australia)
By D Mcleod, S Brindley, S Green
The design and engineering of flotation circuits is driven by numerous inputs, including (in no particular order) testwork outcomes, site considerations, type of separation required, energy sensitivit
Jan 1, 2005
-
Design and Evaluation of Dry Fill
By Blair J. R, Barrett J. R
In many underground mining applications where-dry fill is used, only a token acknowl- edgement of the fill properties is given. It is the aim of this paper to induce mining engineers to consider dry
Jan 1, 1973
-
Design and Ground Support Monitoring of the Brunswick Street Rail Tunnels, Brisbane
By Baxter D. A
This paper, one of two written about the Queensland Railways Brunswick Street tunnels presented at the VIII Australian Tunnelling Conference, 1993, describes the design and monitoring aspects of the r
Jan 1, 1993
-
Design and Implementation of the In-the-Wall Ramp at Marvel Loch South Pit
By K Williams
Marvel Loch South Pit has had a number of stages of open and underground mining activities before acquisition by Sons of Gwalia. The historical pit had achieved a completed pit depth of 150 metres and
Jan 1, 2003
-
Design and Operation of a Counter Current Gas Scrubbing System
For many years the scrubbing of roaster gas carrying sulphur dioxide has been carried out at the plant of the Electrolytic Zinc Co. of Australasia Ltd. at Risdon, Tasmania, using long horizontal tubes
Jan 1, 1949
-
Design and Operation of Backfill for Reliable High Solids Concentration Discharge
By A G McLean
This paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying p
Jan 1, 1998
-
Design and Operation of Backfill Silos for Reliable High Solids Concentration Discharge
This paper will first discuss the fundamental requirements for reliable discharge of backfill by gravity alone at high per cent solids. This discussion will include brief mention of the underlying pri
Jan 1, 1998