Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Incorporation of a Full Process Plant Model as an Active Constraint for Mine Planning and Production Scheduling

    By P Cesare, S Munro, D Wandel, R A. Bearman

    Consideration of the processing plant operational envelope is a key factor in production scheduling,and therefore mine planning, for any mining operation. In many cases hard-wired or regressionbased t

    Nov 24, 2014

  • AUSIMM
    Incorporation of ore sorting into a proposed greenfields tin mining and processing project in Morocco

    By A N. Parry

    In May 2018 Kasbah Resources Limited (“Kasbah”) completed an ore sorting test work program which was a precursor to releasing in July 2018 an updated Definitive Feasibility Study (“DFS”) for the Achmm

    Nov 10, 2020

  • AUSIMM
    Incorporation of Pebble Crusher Specific Energy Measurements for the Optimisation of SABC Grinding Circuit Throughput at Telfer

    By X Zheng, P Manton

    Pebble recycle crushing circuit performance at Telfer has historically fallen significantly short of the design product P80 of 12 mm. An investigation was undertaken to evaluate the current pebble cru

    Jan 1, 2009

  • AUSIMM
    Increased drilling accuracy leads to significant improvement in ore recovery and dilution

    By R Stimpson, B Johnson, B Hesse

    During a period of twelve months between FY18-19, a series of trials were conducted to compare production drilling accuracy using two different methodologies, and the subsequent impact this had on sto

    Mar 15, 2021

  • AUSIMM
    Increased Flexibility Using Waterjet Assisted Blasthole Drilling

    By P J. A Lever

    This paper presents details of CRC MiningÆs work with waterjet assisted blasthole drilling. The objective of this work was to investigate techniques that reduce the cost and increase the productivity

    Jan 1, 2004

  • AUSIMM
    Increased Gold Recovery at PT Freeport Indonesia Using Aero« 7249 Promoter

    By Gorken A, Mular M, Stewart A

    PT Freeport Indonesia operates one of the largest copper and gold concentrator complexes in the world. Flotation is used to produce a single copper-gold concentrate. In 1995, PT Freeport Indonesia a

    Jan 1, 1997

  • AUSIMM
    Increased Performance Through Flash Flotation and Cyclone Optimization

    By Rais SA

    In June, 1986, Freeport Indonesia, Inc., in conjunction with Out- okumpu USA, laboratory tested the Flash flotation concept on Primary ball mill underflow. These laboratory results indicated a possib

    Jan 1, 1988

  • AUSIMM
    Increased Productivity At The C. S. A. Mine, Cobar

    Due to collapsing copper prices during 1974/75, a rapid changeover was made at the C.S.A. mine from mechanised cut and fill stoping with incline access to the more economic long hole open stoping

    Jan 1, 1977

  • AUSIMM
    Increased Productivity through Short-Term Scheduling and Management Operating Systems at the Hilton Mine

    By A Clark

    When production targets are not being reached it is essential to determine what the operating problems are so that remedial action can be taken. It is also imperative that all persons who are part of

    Jan 1, 1998

  • AUSIMM
    Increased productivity using theory of constraints at the Argyle Diamond Mine

    By B Murphy, N Strong, J Albrecht

    Rio Tinto’s Argyle Diamond Mine has a history of underperformance with delivery of ore from the underground operation to the surface for processing with no real clarity in sources of loss and value. I

    Mar 15, 2021

  • AUSIMM
    Increased Profits Through Mine-and-Mill Integration

    By P D. Munro

    The Mine to Mill concept, as it has become known, is a philosophy which is being increasingly embraced by mining companies committed to increasing their profitability through better integration and gl

    Jan 1, 2000

  • AUSIMM
    Increased Rolling Mill Capacity at Kwinana and Newcastle

    The large increase in secondary industries in this country, during the war and post war periods, has caused a shortage of capacity for the production of merchant bar.To overcome this shortage, an expa

    Jan 1, 1957

  • AUSIMM
    Increasing Capacity and Efficiency of Grinding Circuits with High Frequency Screens

    By J Wheeler

    The objective of this paper is to examine the operation of high frequency screens in closed circuit grinding, where the outcomes achieved indicate favourable economic gains at the comminution stage an

    Aug 8, 2011

  • AUSIMM
    Increasing Face Ventilation in Coal Mines

    The author summarizes and extends the relevant results of papers previously published by various authors and presents these results in chart form. The charts are used to demonstrate the theory on a hy

    Jan 1, 1958

  • AUSIMM
    Increasing Grinding Circuit Robustness with Advanced Process Control

    By A Rantala, K Aberkrom, O Haavisto, P Blanz

    More complex ore bodies with lowering grades increase the challenges of maintaining high throughput, energy efficiency and required particle size for optimal downstream processing in grinding circuits

    Sep 7, 2015

  • AUSIMM
    Increasing Mine Profitability ù Technical Partnership to Reduce Coal Loss

    By D Hope, D Mitchell, B Metcalfe

    In recent years there has been a major change among mining companies in their mining methods. This has been driven by the need to increase shareholder value and optimising the value from an operation.

    Jan 1, 2001

  • AUSIMM
    Increasing Net Present Value by a Third at an Operating Sublevel Cave Mine Using Draw Strategy Optimisation

    By A D. Campbell, G R. Power

    The objective of the draw strategy in a caving mine is to maximise economic return by minimising waste dilution3 and maximising ore recovery4. The draw strategy must also include suitable controls for

    May 9, 2016

  • AUSIMM
    Increasing Production Control Through Reliable Geological Predictive Techniques

    By English W, Poppit I

    COALEX Pry Limited operates two underground steaming coal mines on the western edge of the Sydney Basin near Lithgow, New South Wales. Baal Bone Colliery uses longwall technology for an output of over

    Jan 1, 1991

  • AUSIMM
    Increasing production systems availability through remote support discipline

    By A Innis, A Bye, B McCarthy, S Glover

    Technology adoption in the mining industry has been steadily increasing over the past decade, driven by the need to improve operational efficiency, safety, sustainability, and profitability. As mining

    Sep 1, 2024

  • AUSIMM
    Increasing stope recovery in an underground gold mine by using effective analysis, corrective action and employee engagement processes

    By R F. Cota, C Freeman, A Heberle

    "The Lamego mine is an underground gold mine in the Iron Ore Quadrangle in Minas Gerais state, Brazil. The mine produces 48 to 50 koz per annum, as part of the larger Cuiabá-Lamego Complex. This combi

    Oct 16, 2017