Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Long-Term Scheduling

    This paper describes modern long-term mine scheduling and gives an example of its application. It then discusses the obstacles to the implementation of such schedules.

    Sep 26, 2011

  • AUSIMM
    Long-term Stability of Mine Tailings, Macraes Mine, Otago: Comparison to a Geological Analogue

    By D Craw

    Bulk ore tailings from the Macraes gold mine gold extraction process are stored in a large (ca 0.6 km2, 80 m deep) mixed tailings impoundment whose pH is maintained near 8 by natural rock neutralizing

    Jan 1, 2000

  • AUSIMM
    Long-Term Water Management - The Forgotten Legacy of Mine Closure

    By G Byrne

    Long-term water management is typically ignored in mine closure planning. A review of 73 mine closure plans dating from 2007 to 2013 shows that, on average, relinquishment is proposed to be achieved i

    Nov 26, 2013

  • AUSIMM
    Longhole Open Stoping in the ZC ""Crack"" Zone

    By Matthews SM, Gooding JE

    N Longhole Open Stope at The Zinc Corporation Mine was developed in an area with large and continuous tension cracks. These cracks resulted fran widespread block subsidence into previously mined areas

    Jan 1, 1985

  • AUSIMM
    Longhole Open Stoping Practice at the CSA Mine Cobar

    By Jackson GS

    Since 1983 Cobar Mines Pty Ltd has madea concerted effort to improve the performance of its long hole open stopes, especially in the areas of dilution and fragmentation.This has resulted in modificati

    Jan 1, 1985

  • AUSIMM
    Longhole Open Stoping Practice in 'B' Lode at New Broken Hill Consolidated Limited

    Longhole open stoping was introduced in the zinc-rich 'B' lode at New Broken Hill Consolidated Limited (NBHC) during 1968. Since then one longitud- inal and a series of transverse longhole

    Jan 1, 1971

  • AUSIMM
    Longhole Pillar Mining at Pasminco Broken Hill Mine with Particular Reference to Driving through Sandfill

    By P Ormsby, T Hewitt

    Ore in pillars constitutes a significant proportion of the ore reserve at PasmincoÆs Broken Hill Mine. Many of these pillars are narrow (5 -6 m) and high (16 û 35 m) vertical blocks. High-grade ore ha

    Jan 1, 1998

  • AUSIMM
    Longitudinal and Torsional Displacements of Winding Ropes

    Hoisting ropes are constructed of wires and strands positioned helically around the axis. This helical positioning causes that, in the rope loaded at the end with the weight Q, the longitudinal dis

    Jan 1, 1995

  • AUSIMM
    Longwall Automation ù An ACARP Landmark Project

    By P Lever, D Hainsworth, H Gurgenci

    The ACARP Landmark initiative has created the opportunity to advance the level of automation in the coal industry by first focusing on the core production area of longwall mining. A Landmark Longwall

    Jan 1, 2002

  • AUSIMM
    Longwall Caving in China - The Practice of a New Thick Seam Mining System in China

    By Yu H, Wan B

    40 percent of the coal reserves and 40 percent of the ouput of coal in China is of thick coal seams. The sub-level caving in Yangguan has evolved together with the hydraulic supports, to provide recov

    Jan 1, 1991

  • AUSIMM
    Longwall Coal Cutting Machines the Future

    By Carthew J

    For more than 30 years shearer loaders have been the most important winning machines for,longwall mining. While the machines of the first generation had a driving power of only 100 or so kW, the p

    Jan 1, 1988

  • AUSIMM
    Longwall Coal Mining Current and Future

    A comparison is made between bord and pillar and longwall coal mining. Longwall mining presents a challenge to raise the level of management and engineering practice. To maintain a competitive posi

    Jan 1, 1987

  • AUSIMM
    Longwall Extraction at South Bulli Colliery

    The Bellambi Coal Company Limited com menced longwall mining at South Bulli Colliery in 1965. At present it operates three long- wall units in two seams. Although results to date have been less succ

    Jan 1, 1976

  • AUSIMM
    Longwall face floor failure assessment using a semi quantitative risk rating methodology

    By S Grimsey, E Janetzki, J Emery

    Floor failure on the longwall face is a complex problem due to the dynamic interaction between the surrounding strata and powered roof supports involving multiple variables. It can also be highly prob

    Nov 29, 2022

  • AUSIMM
    Longwall Face Outputs Present æState of the ArtÆ -- Alternative Future Trends

    By Duncan GR

    Having passed through a number of previous phases the best longwall results in Australia have shown a significant increase in the last two years. The results expected from a longwall face can be es

    Jan 1, 1988

  • AUSIMM
    Longwall Goaf Gas Drainage and Control Strategies for Highly Gassy Mines

    By N Tuffs, R Peace, S Xue

    Mine gas control is a major issue in most of the gassy underground coal mines, due to its direct impact on safety, production delays and cost of production. Analysis of the gas data, from different co

    Jan 1, 2005

  • AUSIMM
    Longwall Mining at Appin Colliery

    A four monthly period was analysed for each retreating longwall face which indicated that output increased from 1140 tonnes/day for Longwall 1, to 1620 tonnes/day for Longwall 2 and to 2090 tonnes

    Jan 1, 1976

  • AUSIMM
    Longwall Mining at Huntly West

    By W Farnworth

    The Huntly West Mine has undergone significant changes in the last two years, which will affect the remainder of the mine's life. The paper describes the evolvement of plans and an overview of th

    Jan 1, 1991

  • AUSIMM
    Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, Australia

    By T J. Sullivan, H Pinkster, G Swarbrick

    From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o

    Nov 5, 2014

  • AUSIMM
    Longwall Production - Review of Scheduling Factors and Overall Effects of Some Natural Hazards

    The results expected from a longwall face can best be estimated from the ideal production rate, determined by the capacity of the equipment and the conditions in which it is installed, the effective o

    Jan 1, 1991