Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Amphibole Au-Cu Skarn and Massive Sulfide Replacement at the Peak Deposit, Eastern Interior, Alaska

    By P Illig, R Newberry

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Recent exploration efforts in Eastern Interior, Alaska have discovered significant ca 72 Ma

    Mar 18, 2015

  • AUSIMM
    Kiruna-type Iron Deposits in the Mesozoic Ningwu Volcanic Basin, Eastern China – Origin and Relationship to Subvolcanic Dioritic Intrusions

    By X-F Zhao, J-W Li, L-P Zeng

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The formation of Kiruna-type deposits has been ascribed to either immiscible iron phosphate

    Mar 18, 2015

  • AUSIMM
    Geology, Mineralisation and Alteration of the Tuwu-Yandong Porphyry Cu Deposit, North-west China

    By B Xiao, J Yang, H Chen

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Tuwu-Yandong Cu deposit, located in the East Tianshan mountains in the eastern section

    Mar 18, 2015

  • AUSIMM
    Advances in Research on Metallogenic Mechanisms for the Xitieshan Sedimentation-exhalation Lead-zinc Deposit, Qinghai Province, China

    By S Q. Zhao, J H. Wei

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Xitieshan lead-zinc deposit is located in the north margin of the Qaidam Basin, Qinghai

    Mar 18, 2015

  • AUSIMM
    Resource Definition in the World-class Macraes Gold Mine, New Zealand

    By S Doyle

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Macraes gold mine in Otago, New Zealand, is developed along the central portion of the

    Mar 18, 2015

  • AUSIMM
    Platinum Potential of the Pacific Rim of Ural-Alaskan-type Intrusions

    By G Ryan, Yu Nazimova

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. This paper aims to highlight the global exploration opportunities that exist in connection

    Mar 18, 2015

  • AUSIMM
    Fluid Inclusion and Isotopic Constraints on the Mineralisation of the Shagou Ag-Pb-Zn Deposit, Henan Province, China

    By J-S Han, J-M Yao

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Shagou deposit is located along NE-trending faults within the high-grade metamorphic ba

    Mar 18, 2015

  • AUSIMM
    Geology and Geochronology of the Mo-polymetallic Ore Deposits in Hainan Island, South China

    By Y R Fu, D R. Xu, C J. Wu, G C. Hu, H Chen

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Hainan Province (Hainan Island) in South China hosts numerous Mo-polymetallic ore deposits

    Mar 18, 2015

  • AUSIMM
    Chromite and Platinum-group Elements Coprecipitation by Crustal Contamination or Magma Mixing Revisited – Genetic and Exploration Implications

    By S A. Prevec

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Traditional models employed to genetically link associated chromite and platinum-group elem

    Mar 18, 2015

  • AUSIMM
    Elaine Dorothy Cu-Au (REE-U) Skarn Deposit

    By P Sha

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Elaine Dorothy Cu-Au (REE-U) skarn deposit in the Mt Isa Inlier, Queensland, Australia

    Mar 18, 2015

  • AUSIMM
    Application of the Theory of Constraints to Strategic and Tactical Mine Planning

    By T Elkington, A Finch

    The theory of constraints (TOC) is a business improvement method that focuses on exploiting a business’s bottleneck to deliver the highest possible profit. Early applications were mostly in the manufa

    Nov 24, 2014

  • AUSIMM
    Strategic Underground Mine Access Design to Maximise the Net Present Value

    By P A. Grossman, J H. Rubinstein, M Brazil, K G. Sirinanda

    To date, the scheduling and access design of an underground mine have only been considered as two separate optimisation problems. First, access to the mine is designed and then the scheduling is compl

    Nov 24, 2014

  • AUSIMM
    Incorporation of a Full Process Plant Model as an Active Constraint for Mine Planning and Production Scheduling

    By P Cesare, S Munro, D Wandel, R A. Bearman

    Consideration of the processing plant operational envelope is a key factor in production scheduling,and therefore mine planning, for any mining operation. In many cases hard-wired or regressionbased t

    Nov 24, 2014

  • AUSIMM
    Solving a Large Stochastic Integer Programming Model for Production Scheduling at a Gold Mine with Multiple Processing Streams and Uncertain Geology

    By M de Freitas Silva

    One of the main steps during the decision-making process of long-term mine planning is the definition of the optimal sequence of extraction, which usually is synonymous with maximising the discounted

    Nov 24, 2014

  • AUSIMM
    Optimal Inference of Modelling Parameters to Simulate Complex Trends across Soft Boundaries – A Case Study in Heavy Mineral Sands

    By T Wambeke, J Benndorf

    A risk-robust development of a heavy mineral resource requires an assessment of the geological uncertainty and spatial variability of the key factors impacting the mining and processing operation. Att

    Nov 24, 2014

  • AUSIMM
    Strategies for Mine Planning and Design

    By S Coward, C Xu, P A. Dowd

    "This paper provides an assessment of the current challenges in strategic mine planning and design and suggested approaches for addressing them. The specific challenges covered are: realistic quantif

    Nov 24, 2014

  • AUSIMM
    Not for the Faint-Hearted

    By J Whittle

    This paper describes what is involved in carrying out a comprehensive optimisation of a long-term operating schedule for a mining complex. It details the data that must be assembled and discusses the

    Nov 24, 2014

  • AUSIMM
    Adaptation of an Open Pit Optimiser for Underground Strategic Planning

    By M Bloss, B Roberts

    BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so

    Nov 24, 2014

  • AUSIMM
    Optimising a Mineral Supply Chain under Uncertainty with Long-term Sales Contracts

    By J Zhang, R Dimitrakopoulos

    A two-stage stochastic mixed integer non-linear program is formulated for a mining complex to optimise strategic and tactical plans. The objective is to find the near optimal decisions for a mineral s

    Nov 24, 2014

  • AUSIMM
    Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem

    By M W. A Asad, E Topal, D S. S Sandanayake

    Underground mine planning requires an optimal stope layout as a prerequisite for the definition of an optimal production schedule. The procedure to generate an optimal stope layout considers an orebod

    Nov 24, 2014