Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Optimization of POX-CIL Process for Refractory Gold-Bearing Concentrates Treatment

    By Y. Y. Yemelyanov, S. S. Gudkov, A. V. Boldyrev, A. V. Bogorodskiy, S. V. Balikov

    "A series of tests to optimize pressure oxidation- carbon-in-leach process (POX-CIL) of goldbearing flotation concentrate with the addition of sodium chloride and activated carbon were carried out. Fl

    Jan 1, 2016

  • CIM
    Optimization Of Proceeds in Changing Market and Mining Conditions

    By Stanley G. Butcher

    Predictions of coal cleaning plant performance from the washability data are traditionally used at the conceptual design stage of a coal preparation plant to confirm process selection. The development

    Jan 1, 1979

  • CIM
    Optimization of Process Variables During TLP Bonding of Nickel Superalloys

    By M. Medraj, M. A. Arafin, D. P. Turner, P. Bocher

    In this study, the kinetics of isothermal solidification during TLP bonding of Inconel 625 and 718 superalloys with nickel based multi-component filler alloy BNi-2 have been studied through a combinat

    Jan 1, 2006

  • CIM
    Optimization Of Refractory Lining Design And Installation Practice To Reduce Vessel Downtime And Maximize Performance Of Anode Refining Vessels

    By A. J. Rigby

    Anode vessels are often relined with refractory every one to two years and a typical reline time can take between 16-20 days. Modem refractory designs using dense, corrosion resistant brick applied di

    Jan 1, 2007

  • CIM
    Optimization of SAG Mill Process Control at the Raglan Mine

    By G. Couture, J. -F. Dubé, F. Letarte-Lavoie

    "The Xstrata Nickel Raglan concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. Originally designed to process 800,000 tonnes per year of high-grade nickel ore, the plan

    Jan 1, 2013

  • CIM
    Optimization of shovel-truck systems using the queuing theory - Optimisation des systèmes pelles?camions en utilisant la théorie des files d?attente

    By D. Komljenovic

    This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels a

    Sep 1, 2004

  • CIM
    Optimization of Sputtered Ti/Mo/ Au Metallization System for Solder Bonding

    By S. Akhlaghi

    In many electronic/optoelectronic devices, interaction between the metal stack and solder is undesirable. If a reaction happens, a nonuniform joint containing spikes and voids is likely to form and as

    Jan 1, 2006

  • CIM
    Optimization of the building ventilation of a bath treatment plant of an aluminium smelter using CFD modelling

    By E. Dernedde

    Industrial plants located in the province of Quebec, Canada, are subjected to large variations of the ambient air temperature, Building ventilation systems of these plants must have some flexibility i

    Jan 1, 2005

  • CIM
    Optimization of the Damang Mine

    By Charles Amoah

    Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe

    Jan 1, 2012

  • CIM
    Optimization of the Damang Mine (f1135579-fc96-4b0b-98ae-1df94fee7413)

    By Dayang Datu Khalil, Charle Amoah, Fred Kock

    Abosso Goldfields Limited has been optimizing the comminution circuit at the Damang Mine Operation for the treatment of 100% primary ore. The optimization process started at a base rate of 343 tph whe

    Jan 1, 2012

  • CIM
    Optimization of the Froth Washing System of Columns in the Rougher Circuit of the Miduk Copper Concentrator

    By M. Massinaei

    Recently constructed circuits have included multiple stages of columns in a variety of applications, from roughing to cleaning. The Miduk copper concentrator (in south-eastern Iran) is one of the uniq

    Jan 1, 2007

  • CIM
    Optimization of the Grinding Circuit of the Tata Steel Ijmuiden Pelletizing Plant

    By Willemijn Husslage

    Tata Steel Group At a glance ? Part of the Tata Group ?Tata Steel Group: ?Fortune 500 company ?Top 10 global steel producer ?Annual crude steel capacity of 28 million tonnes ?More than 80,000

    May 1, 2011

  • CIM
    Optimization of the Haile Gold Mine Grinding and Flotation Line Using Model Predictive Control

    By Quenton Johnson, W. A. Gough, David Carr

    "This paper describes the application of the BrainWave Model Predictive Controller (MPC) and Advanced Control Expert (ACE) Advanced Supervisory Control System on the SAG Mill, Ball Mill, and Rougher F

    Jan 1, 2017

  • CIM
    Optimization of the Operation of Hot Stoves

    By Henrik Saxén, Mikko Helle

    The operation of hot stoves used for preheating the blast in the ironmaking blast furnace has a strong effect on the consumption of reductants, economic performance of and CO2 emissions from the steel

    Jan 1, 2015

  • CIM
    Optimization of the paste backfill plant at Louvicourt mine

    By J. Cayouette

    In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum through

    Jan 1, 2003

  • CIM
    Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)

    By Jean Cayouette

    "In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi

    Jan 1, 2002

  • CIM
    Optimization of the Refractory Lining Life of Copper Converters

    By A. J. Rigby

    The wear mechanisms of the tuyere lines of Peirce-Smith and Hoboken converters are a subject of endless debate and speculation. However, there has been an indication that one of the primary factors in

    Jan 1, 2019

  • CIM
    Optimization of the Technological Parameters for the Copper Electrorefining Using Interference Microscopy and Digital Image Analysis

    By D. Zagidulin

    Short term electrodeposition experiments (up to 80 min.) at two current densities 220 and 275 A/m2 with varying concentrations of thiourea and glue were performed to determine the optimum levels of gl

    Jan 1, 2007

  • CIM
    Optimization of the Xstrata Copper-Horne Smelter Operation Using Discrete Event Simulation

    By J. M. Simard, S. Morissette, P. Coursol, P. Mackey

    A new, powerful model is presented that focuses on plant logistics and scheduling aspects of the smelting, converting, fire refining and casting operations at the Horne smelter. This plant complex is

    Jan 1, 2009

  • CIM
    Optimization of Water Supply and Reutilization in Base Metal Processing in Dry Regions

    By Raymond Philippe

    Background ?Hatch Water has worked with most major mining companies in Chile on water supply and optimization projects ?Many(copper) mining projects are located in Northern Chile, which hosts the

    May 1, 2009