Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Slag Fuming Process Intensification at Trail Operations

    By K. J. Heale, G. G. Richards, D. J. Rioux, R. L. Stephens

    Slag fuming has remained a key process for the recovery of Zn, Pb, and minor elements in the integrated flow sheet at Teck Cominco's Trail Operations for more than 75 years. Since the start-up of

    Jan 1, 2008

  • CIM
    Slag loss control with Bessemer mattes

    By P. Toscano

    The objective of this investigation was to determine how the losses of nickel, copper and cobalt in fayalite slags could be controlled for nickel mattes with iron contents below 5 wt%. Laboratory-conv

    Jan 1, 2004

  • CIM
    Slag loss control with Bessemer mattes (7a7d6df1-1191-4a91-90b7-94a6293af197)

    By P. Toscano, T. A. Utigard

    "The objective of this investigation was to determine how the losses of nickel, copper and cobalt in fayalite slags could be controlled for nickel mattes with iron contents below 5 wt%. Laboratory-con

    Jan 1, 2004

  • CIM
    Slag Reduction and Cleaning with Calcium Carbide

    By A. Warczokand

    The cleaning of copper smelting slag requires magnetite and cuprous oxide reduction. The slag reduction with coke, injected coal powder or bunker oil is strongly endothermic and requires heat generati

    Jan 1, 2007

  • CIM
    Slag Reduction and Settling for Improved Metal Recovery

    By R. Dawes, B. R. Davis, T. LeBel, C. Pelow

    Settling of copper, lead, and other metals in slags is an important part of overall recovery of metals, both in primary and secondary operations. The impact of slag reduction on settling is not well k

    Jan 1, 2019

  • CIM
    Slag Refining Of Silicon: A Review

    By L. Tafaghodi, A. Hosseinpour

    "Silicon is considered as the most appropriate semiconductor material for manufacturing solar cells because of its natural abundance and being nontoxic. The transferable knowledge and technology from

    Jan 1, 2017

  • CIM
    Slim-Hole Drilling and 2 1/2.-lnch Casing, Tubingless Completions

    By John H. Nicholls

    In this paper, Imperial Oil Limited reports briefly on the drilling by contract rigs of twenty-nine slim holes in the Virden, Smiley, and Souris Valley areas. The investigations showed that slim-hole

    Jan 1, 1958

  • CIM
    Slim-Hole Drilling Cynthia Area, and Completion Practices, Pembina Field, Alberta

    By W. D. Freeborn

    Slim-hole drilling and completion techniques were first used in the Cynthia area of the Pembina field, Alberta, by the Texaco Exploration Company in the summer of 1957. Prior to that time, eighty-eigh

    Jan 1, 1958

  • CIM
    Slocan Mining Camp

    By C. E. Cairnes

    The Slocan mining camp in Kootenay district; British Columbia; has long been noted for the great number of its silver-bearing deposits; and for the success that has; in many instances; attended their

    Jan 1, 1954

  • CIM
    Slon Magnetic Separator: A New Approach for Recovering and Concentrating Iron Ore Fines

    By Stephen B. Hearn

    The SLon Vertical Ring and Pulsating High Gradient Magnetic Separator was developed to overcome multiple disadvantages associated with traditional horizontal type Wet High Intensity Magnetic Separator

    May 1, 2007

  • CIM
    Slope failure kinematics

    By Z. M. Zavodni, C. D. Broadbent

    "Major rock slides in open-pit mines are rare, but they can develop in spite of sophisticated slope engineering design practice. Experience has shown that, except under high seismic load conditions, t

    Jan 1, 1980

  • CIM
    Slope Mass Rating (SMR) Geomechanics Classification: Thirty Years Review

    By R. Tomás, J. B. Serón, M. Romana

    The Slope Mass Rating (SMR; Romana, 1985) geomechanics classification was developed as a sequel of Bieniawski’s Rock Mass Rating (RMR) system, which was almost impossible to use in slopes due to the e

    Jan 1, 2015

  • CIM
    Slope Stability at Lac Jeannine

    By J. M. Réjean Gagnon

    "Quebec Cartier Mining Company is currently mining a low-grade iron ore deposit in northeastern Quebec. The Company is producing some 8,000,000 dry gross tons of concentrates per year, grading about 6

    Jan 1, 1968

  • CIM
    Slope Stability in Jointed Rock

    By Peter N. Calder

    The orientation of planes of inherent weakness (joints) with reference to an excavation in rock is the critical factor determining stability. The purely frictional 'residual' strength remaining follow

    Jan 1, 1970

  • CIM
    Slope stability in the Trenton limestone of a Montreal area quarry

    By Marc C. Betournay, John E. Udd

    "In this study, the authors investigated the stabilities of slopes cut predominantly into Trenton limestone in a large quarry in the Montreal region. Analyses of the bench and pit walls indicated that

    Jan 1, 1983

  • CIM
    Slope Stability Radar for Managing Rock Fall Risks in Open Cut Mines (f7671fea-c20b-4d8f-92db-191a4e6e4965)

    By Neal Harries

    Ground movement is normal in open cut mining operations, mainly caused by excavation response and blasting. Movement of the ground can be acceptable provided it is not unexpected and catastrophic. How

    May 1, 2009

  • CIM
    Slurry Dispersion Angle at Choke Outlet in Pressure Letdown with Multi-phase Flows

    By J. Robison, H. Pieterse, C. C. Smith, M. Luque, S. Chipman

    Phase change during pressure let down releases significant amounts of energy that must be controlled to avoid undo wear and tear on equipment. Hydrometallurgical slurries require flow control equipmen

    Jan 1, 2004

  • CIM
    Slurry Pipelines ? A Historical Perspective

    By Ron H. Derammelaere

    Coal Slurry Test Pipeline and First Recorded Commercial Pipeline Wallace Andrews founder of New York Steam Company awarded patent for ?Method of Transportation? that involved pumping finely divide

    May 1, 2013

  • CIM
    Slurry Pump and Pipeline Performance Testing at the Georgia Iron Works Hydraulic Laboratory

    By G. R. Addie

    "In February, 1975, the President of Georgia Iron Works Company, Mr. Tom Hagler decided to build a new hydraulic laboratory to water performance test all of the companies' centrifugal slurry pumps.Equ

    Jan 1, 1980

  • CIM
    Slurry Pumping at Inco Metals Company (Ontario Division)

    By J. E. Lee

    "This paper describes the current practices and experiences, and discusses design parameters concerning slurry pumping at Inco Metals Company in the Sudbury District. It deals mainly with the long tai

    Jan 1, 1978