Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Sizing and Operation of Crushing and Screening Plants
By R. E. Jones
"Crusher sizing and application in mining operations is the selection of a crusher or a series of crushers to reduce run of mine ore to a size suitable for either autogenous or conventional grinding.
Jan 1, 1974
-
The Ecstall Story; The Geology Department
By Richard R. Walker, John J. Watkins, Allen C. Amos, Matulich. Angelo
THE KIDD CREEK MINE is located within the Abitibi greenstone belt, near its west end, in an area known as the Porcupine mining camp (Fig. 5). The Abitibi belt, long known for its many major gold and b
Jan 1, 1974
-
The Ecstall Story: The Administration Department
By Albert W. Scragg
"THE ADMINISTRATION DEPARTMENT consists of six sections, all with their own supervisors, reporting to the superintendent of administration. Although each of these sections is uniquely separate, they a
Jan 1, 1974
-
The use of Rubber Mill Liners in the Strathcona Concentrator Of Falconbrillge Nickel Mines Limited
By F. G. Pickard
"The Strathcona Concentrator is one of three concentrators presently operated in the Sudbury District by the Nickel Division of Falconbridge Nickel Mines Limited. Production commenced in 1968 at a mil
Jan 1, 1974
-
Experience with Rubber Mill Linings at Ecstall Mining by M. P. Amsden, Mill Superintendent
By M. P. Amsden
"Ecstall Mining Limited, a subsidiary of Texasgulf, Inc., Operates the Kidd Creek Mine, Concentrator and Zinc Plant at Timmins, Ontario. Two different ore types are mined and milled to produce concent
Jan 1, 1974
-
Treatment of Talcose Molybdenite Ores
By G. I. Mathieu, R. W. Bruce
Flotation schemes for the separation of molybdenite from other minerals are based on utilizing the Inherent hydrophobicity of molygdenite (Fuerstenau1). This natural floatability was attributed to the
Jan 1, 1974
-
The Ecstall Story: The Underground Mine .
By John Ramsay, Frederick A. Edwards, J. Eric Belford, Clarence V. Amyotte
"DEVELOPMENT of the underground mine is carried out from a main ramp driven from surface to the 800 and 1200 levels and from a shaft sunk to 3050 ft. Sub-levels at approximately 100-ft vertical interv
Jan 1, 1974
-
The Con-Rycon Gold Mill
By G. R. Rawsthorne
"The Con-Rycon mine is located on the north shore of Great Slave Lake in the Northwest Territories within the present city limits of Yellow-knife. Development work on the Con property started in 1936,
Jan 1, 1974
-
The Ecstall Story: The Electrolytic Zinc Plant
By Edwin G. Sharp, Frank S. Gaunce, George M. Freeman, Denis J. Kemp, Eric Dulson, Paul Salmon, Ernest R. Hamilton, Carl E. Parden
"THE ECSTALL ZINC PLANT was built for the treatment of the Kidd Creek zinc sulphide concentrates. Construction proceeded throughout 1970-71, with operations beginning in April 1972. The two concentrat
Jan 1, 1974
-
The use of Rubber Liners in a Regrind Mill
By Phil Molloy
"In March, 1968, Skega Ruh her Liners were used to reline the shell of an 8' x 12' Allis Chalmers ball mill.This mill is used to regrind the cyanided pulp from 58i -200 mesh to 92% -200 mesh prior to
Jan 1, 1974
-
The Ecstall Story: The Open-Pit Mine
By George C. Coupland
"THE PRELIMINARY EVALUATION of the orebodies was computerized for tonnages and grades on a 20- by 20-ft grid. The evaluation was based on drill-core intersections over 40-ft vertical projections coinc
Jan 1, 1974
-
Corrosive Wear and its Control in Ball Mill Grinding - A Progress Report
By Dr. G. R. Hoey
"Abrasive wear and corrosive wear of carbon-steel grinding balls occurred simultaneously during the wet-grinding of hematite iron ore, and Ni-Cu sulphide ore, in laboratory ball mills. Two corrosion c
Jan 1, 1974
-
"Large Volume Flotation Machines”
By H. J. Chalmers
"Since the advent of large volume flotation machines, Cominco Ltd. has actively studied possible application of such machines to their various milling operations. A number of installations have been m
Jan 1, 1974
-
The Ecstall Story: The Ecstall Concentrator
By Michael P. Amsden
"THE ECSTALL CONCENTRATOR is situated adjacent to Highway 101 and the Ontario Northland Railroad, 15 miles east of Timmins, Ontario. Ore is delivered to the concentrator by rail from the mine, which i
Jan 1, 1974
-
The Abatement of Acid Mine Drainage in Ontario
By John R. Hawley
"This paper is intended as a review of the progress that has been made in the Province of Ontario in the field of acid drainage waste treatment technology.Three years ago, at the Third Annual Meeting
Jan 1, 1974
-
The Ecstall Story: The Employee Relations Department
By Gerald R. Larocque, Donald F. Grenville
"IN APRIL, 1965, the employee relations department (then called the personnel department) was established as a separate function within the company. Its aims and objectives were to hire an effective w
Jan 1, 1974
-
The Ecstall Story: The Railroad and Traffic Department
By David G. Baskin
"THIS DEPARTMENT is unique in that it operates in the production stream and also provides an essential service. Its operating function consists of scheduling an ore train to haul 10,000 tons per day o
Jan 1, 1974
-
Design and Construction of Mineral Processing Plants using Project Management
By A. J. Williams
"Whenever a decision is made to bring a mineral deposit into production, the Owner in actual fact has decided to convert substantial sums of capital into productive capacity with the intenti6n of maki
Jan 1, 1974
-
Tank Cell Operation at Manibridge Mine
By I. E. Wahn, E. A. Boutin
"The Manibridge Mill is unique in its treatment of relatively high grade nickel-copper ore because in the mill design are included one 10' diam. x 10' Maxwell cell, and three 12' diam. x 12' tank cell
Jan 1, 1974
-
The Ecstall Story: The Maintenance Department
By O'Halloran. Gerard F.
"ECSTALL MINING has installed in their plants the most modern equipment in the mining industry. At the minesite, digital blocked frequency controls are used to monitor all crushers, conveyors, ventila
Jan 1, 1974