Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
In-situ mechanical characterization of a paste backfill with a self-boring pressuremeter
By J. Ouellet
"ABSTRACTA brief background on in-situ testing of mine backfill, as well as pressuremeter testing is briefly described, and results from an in-situ testing on paste backfill are presented. A series of
Jan 1, 2000
-
Intelligent ore delineation: Integrating geosensing and geographical information systems
By M. J. Scoble, H. L. Francis, D. F. Salter, G. R. Baiden
Intelligent ore delineation refers to the ability reliably to characterize the geological setting of a mineralized body and its grade distribution. This necessitates using all available geological inf
Jan 1, 2000
-
The Effect of Shotcrete on the Flotation Nickel Recoveries of Falconbridge Nickel-Copper Ore
By Peter Wells, Laxman M. Amaratuga, Todd M. Kanhai
"Certain mining methods (eg. Cut-and-fill) result in the contamination of run-of-mine ore with shotcrete. This shotcrete remains mixed with the ore throughout processing. Experimentation performed by
Jan 1, 2000
-
Analysis of the failure of a large hangingwall wedge: Kidd Mining Division, Falconbridge, Ltd.
By M. Board, R. Pakalnis, S. Seldon, R. Brummer
The Kidd operation mines roughly 10 000 tpd of copper and zinc ore from underground and employs about 700 personnel. In the late summer and fall of 1997, major movements in the proximity of the east w
Jan 1, 2000
-
Dense Medium Separation and its Importance to Canada’s Diamond Mining Industry
By Dave Price
"Canada is scheduled to become the 4th highest diamond revenue producing country in the world by year 2004 with the already operating Ekati Mine and the anticipated operation of the Jericho Mine in 20
Jan 1, 2000
-
A review of dry cover placement on extremely weak, compressible tailings
By A. T. Jakubick, A. MacG. Robertson
This paper reviews key issues related to the placement of dry (soil) covers on extremely weak, compressible fine tailings. The design and construction of soil covers on such tailings often presents a
Jan 1, 2000
-
Tuning flotation circuit operation as a function of metal prices
By Daniel Hodouin, Claude Bazin
"This paper examines the economic advantages of tuning the operation of a differential Cu-Zn flotation circuit as a function of metal prices. Three operating strategies are considered in the analysis:
Jan 1, 2000
-
AC drive application issues
By A. C. Stevenson
"There are many critical application issues that affect all AC drives, but there are several that are absolutely mandatory for pulse width modulated (PWM) AC drives. If these rules are not followed, t
Jan 1, 2000
-
Development of a Two-Stage Middlings Circuit at Inco’s Clarabelle Mill Part 1: Laboratory Studies
By Manqiu Xu, Glen Robertson, Steve Wilson, Pete Quinn
"The middlings circuit, once called the pyrrhotite rejection circuit, at Inco’s Clarabelle mill was a single flotation stage. It used to process a combined feed consisting of the main flotation scaven
Jan 1, 2000
-
Suncor Energy Inc. - Oil Sands
By Brad Bjornson, Geoff Stevens, Mike Ashar, Cliff Britch
"LocationThe facilities are located 30 km north of Fort McMurray, Alberta (or 470 km northeast of Edmonton, Alberta).Brief Description of OperationThe operation includes the mining of oil sands, extra
Jan 1, 2000
-
The Horne Mine: Geology, History, Influence on Genetic Models, and a Comparison to the Kidd Creek Mine
By Sergio Cattalani, David J. Kerr, Harold L. Gibson
Abstract - The Horne mine was truly a world class Cu and Au deposit. Between 1927 and 1989, it produced some 260 t of Au and 1.13 Mt of Cu from 53.7 Mt of ore that averaged 2.22% Cu, 6.1 g/t Au and 13
Jan 1, 2000
-
Centrifuge Units for Gravity Separation - An Update
By André R. Laplante
"This presentation reviews three continuous centrifuge separators, the Falcon-C, Kelsey Jig and Multi-Gravity Separator, two units with possible synergies with centrifuges, the In-Line Pressure Jig an
Jan 1, 2000
-
Milling Circuit Control and Optimisation: The Millstar with IES
By J. R. Hart, V. C. Smith, V. P. Babarovich-Hansen, J. H. Schubert
"An introduction and case study of Mintek's latest generation of Milling Circuit controller, the MillStarTM with IES (Interpreting Expert System) is presented. This paper also describes as a case stud
Jan 1, 2000
-
Simulation - An Approach to Risk Analysis in Coal Mining
By João Felipe Costa, Jair Carlos Koppe, André C. Zingano
Abstract - Traditional mine planning based on block models built with interpolation techniques such as kriging does not take into account the uncertainty associated with the estimates. These models ar
Jan 1, 2000
-
The impact of rotary lobe blower seal upgrades at INCO’s Copper Cliff Nickel Refinery
By J. Costigan, C. Corless
In 1997, damage as a result of Castrol R40 entering the INCO pressure carbonyl plant carrier gas stream was becoming increasingly severe. The oil in the gas stream was adversely affecting both equipme
Jan 1, 2000
-
Economical Benefits of Autogenous Grinding
By Seppo Lähteenmäki, Pertti Koivistoinen, Jaakko Levanaho
"This paper describes the benefits and disadvantages of fully autogenous grinding when compared to grinding with steel grinding media. The study is a real case study based on a low tonnage, high grade
Jan 1, 2000
-
Milling of Potash in Canada - An Overview
By Graeme G. Strathdee
"IntroductionThis paper presents an overview of the industry status, describes current potash industry practices at three mills, and summarizes developments that have taken place since the previous re
Jan 1, 2000
-
Hazards associated with the mining of diamondiferous pipes
"With the globalization of the mining industry, many companies are now seeking to invest in underground diamond mines, with the purchase of small diamond pipes being seen as particularly attractive. H
Jan 1, 2000
-
An infrastructure for surface mining equipment teleoperation
By M. G. Lipsett
"Mining properties are becoming increasingly remote, a challenging situation for operating and maintaining equipment. Logistics of transporting workers and materials can be alleviated by having timely
Jan 1, 2000
-
Mineralogy and pre-concentration of the chromite overburden of the Sukinda Ultramafic Belt, Orissa, India
By R. B. Rao, B. Das, J. K. Mohanty, D. S. Rao
Physical, mineralogical and geochemical characterization, along with some beneficiation approach to pre-concentrate the Ni content of the chromite overburden material of the Sukinda Valley, India, hav
Jan 1, 2000