Performance-Based Reliability Design for Deep Foundations Using Monte Carlo Statistical Methods (aa702b6b-e181-4fa5-97b3-2e3a1ab7040e)
By Haijian Fan
Currently, deep foundation designs for the service limit state are deterministic in nature. The settlements and lateral deflections of deep foundations are calculated by means of numerical techniques
Jan 1, 2017
-
Peribonka Dam In Canada A Showcase Of Advanced Ground Engineering Techniques
By Mazin Adnan
The 80m high dam at the Peribonka river in the Canadian province of Quebec was designed for the generation of 385 MW of hydro electrical power (Fig.1). The complex ground conditions required the e
Jan 1, 2008
-
Permanent Canal Closures and Pumps Cofferdams – Support of Deep Excavation in Soft Ground Using the Open Cell Sheet Pile System
By Ryan Higbie, King Chin, Matthew Anderson, Mike Huggins, Rian Johnson, Dave Sinsheimer
"The Permanent Canal Closures and Pumps (PCCP) project is the capstone piece of New Orleans’ extensive hurricane risk-reduction system constructed following Hurricane Katrina. The project consists of
Jan 1, 2017
-
Permanent Displacement And Pile Driving Vibrations - Summary
By Charles H. Dowding
Whenever piling vibrations are significant, construction activities associated with pile driving and/or excavation can produce permanent displacement. These permanent displacements are more detrimenta
Jan 1, 1991
-
Permanent Earth Retention for Deep Excavation Installed Within Minimal Right of Way Limits
By Thomas D. Humbert, Christopher J. Ramsey
Construction of a new underground parking structure in State College, Pennsylvania, is situated on a site constrained by limited ROW and required excavations ranging in depth from 25 ft to 40 ft. Addi
Jan 1, 2019
-
Permanent Soil Nail Earth Retention System, Stanley Hall Replacement Project, UC Berkeley
By Pirooz Barar
The new Stanley Hall building will house the center for bio-engineering and technology research for the UC Berkeley campus. The structure is located at the northeast part of campus, adjacent to Donne
Jan 1, 2004
-
Philadelphia Dock Story—Pile Challenges at Delaware River
By Craig H. Olson
"A new ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at
Jan 1, 2008
-
Philadelphia Dock Story—Pile Challenges at Delaware River (06bf9951-abf5-4656-aab7-81fa955662d4)
By Craig H. Olson
"Anew ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at t
Jan 1, 2008
-
Physical Modeling and Development of Design Criteria for Maintainable Drains for Earth Retention Systems
By J. Erik Loehr, Andrew Z. Boeckmann
"Poor drainage is a common cause of poor performance of earth retention systems, resulting in burdensome serviceability problems that can progress to outright failure of the retention system if not ad
Jan 1, 2016
-
Pier Design And Construction In Water Bearing Soils ? Synopsis
By C. N. Baker
The design and construction of drilled piers through water bearing and caving soil conditions are discussed. The need for close cooperation between the design engineer and contractor in both the desig
Jan 1, 2010
-
Pile Construction And Related Problems ? Synopsis
By K. Fujita
In order to deal properly with the fundamental aspects of pile construction, the following problems and their solutions are introduced: For driven piles - stresses, damage, movements of surroundings,
Jan 1, 2010
-
Pile Design According to Eurocode 7, Highlights and Developments
By Adriaan van Seters
"Abstract The content of Eurocode 7 – Part 1 and Part 2 – with respect to piled foundations is outlined. The important role of pile testing is presented and the derivation of the characteristic value
Jan 1, 2014
-
Pile Design And Construction Challenges In Partially Thawed Alaskan Soils
By John D. Thornley
Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alas
-
Pile Design and Construction Challenges in Partially Thawed Alaskan Soils (f9ca4371-20bf-4196-a495-4aa1bd15a8c0)
By John D. Thornley
Alaskan villages typically store a one-year supply of fuel to reduce significant delivery costs. Alaska Village Electric Cooperative (AVEC), an electric utility cooperative providing power to 51 Alask
Jan 1, 2017
-
Pile Design For Offshore Structures Subjected To Subsidence
By Juan J. Campo
The Freeport-McMoRan Main Pass Mine development in the Gulf of Mexico is a complex designed to extract up to 67 million long tons of sulphur over a 40 year period. The initial development includes 15
Jan 1, 1992
-
Pile Design Philosophies For Coralline And Weak Carbonate Rocks
By Rahul Wankhade, Sunil S. Baswankar, Aditya S. Kharatkar
Despite advances in pile design methodologies and piling techniques at site, difficulties and uncertainties still exists for design of piles particularly in coralline deposits and weak carbonate rocks
Sep 1, 2022
-
Pile Design Using Cpt Results: The “Lpc Method”
By Frederic A. Verheyde
The CPT pile design method of the ‘Laboratoire des Ponts et Chaussées’ (LPC) uses the cone resistance (qc) for the design of axially loaded piles. It was originally proposed in 1982 and was revised in
Nov 1, 2022
-
Pile Design, Testing, And Installation For A Gated Dam ? Synopsis
By B. H. Moore
The opportunity to evaluate the pile design procedures used on a major project is an infrequent occurrence. It is even more infrequent that the project involves piles with significant tension and hori
Jan 1, 2010
-
Pile Diameter Effects On Initial Modulus Of Subgrade Reaction For Laterally Loaded Piles
By Hubert Law, Amin Rahmani
This paper evaluates the effects of pile diameter on the initial modulus of subgrade reaction and proposes modifications to the subgrade reaction moduli that are commonly used in the current state of
-
Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging Project
By José Carlos do Amaral, Marcelo Groszownik, Jorge Beim
"Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the
Jan 1, 2015