Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Pile Driving Dilemma: Reducing Noise, Vibrations
By Michael D. Justason
"In January 2009, long-time competitors, Anchor Shoring & Caissons Ltd. of Toronto and Bermingham Foundation Solutions of Hamilton, joined forces to tackle one of the Greater Toronto area’s largest de
Jan 1, 2012
-
Pile Driving Equipment ? The Right Tool For The Job - "How To Avoid First Day 'Down Time' Blues"
By R. Paul De Bruyn
A. Crane Check List -- Make -- Model -- Year of Manufacture -- Where is load chart? Is it for this crane? -- Boom style and length -- Boom tip drawing (sketch) for fixed lead connection.
Jan 1, 1990
-
Pile Driving Hammers In Centrifuge Modelling - Synopsis
By Daniel Levacher
Pile load tests in site require extensive means of action and time. To get outstanding tests, the environmental test conditions must be perfectly known and acceptable. They concern the support install
Jan 1, 1996
-
Pile Foundation - A Critical Study Of Some Design Aspects. - Synopsis
By S. L. Karunakaran
Selection of an appropriate foundation system requires great skill and ingenuity on the part of the designer. Certain guidelines for choosing between a pile and raft foundation are presented. A number
Jan 1, 1996
-
Pile Foundation Response to Ground Vibration from Rock Blasting
By Anthony T. C. Goh, Zhiye Zhao, Laddu B. Jayasinghe, Hongyuan Zhou, Yilin Gui
"Ground vibrations from blasting are undesirable and they are very short in duration with high principal frequencies and high amplitude. Structural response to that kind of excitations may differ sign
Jan 1, 1900
-
Pile Foundation Solutions in the Deep Quaternary Sediments of Botany Bay
By Paul A. O’Brien, Gary A. Chapman, Thomas G. Cuniowski
"The new Amcor B9 paper mill in Botany, NSW, Australia, involved the design and construction of a new paper mill founded within the Botany Basin Sediments. There were numerous design and construction
Jan 1, 1900
-
Pile Foundation, Retaining Structures For Deep Excavation And Anti-Buoyancy Anchors In Shanghai Soft Soils
By Sun Gengsheng
Geotechnical properties of soils, usual types of pile foundations, pile capacity, calculation of settlements of pile foundations, usual types of retaining structures for deep excavation, stability ana
Jan 1, 1991
-
Pile Foundations For Algiers New Airport Terminal
By Ramdane Bahar
The new Algiers airport building is a reinforced concrete building of more than 80 thousand square meters of floor slabs. It is located at Dar-EI-Beida, near the old passenger terminal, about 20 km ea
Jan 1, 2002
-
Pile Foundations for the San Francisco 49ers NFL Stadium
By Scott A. Walker, Gabriel J. Alcantar, Brian Zuckerman, Ramin Golesorkhi
"The new San Francisco 49ers Levi’s Stadium is part of the next generation of sporting facilities. Constructed in Santa Clara, Calif., the new structure has 68,500 open-air bowl seats and includes a 7
Jan 1, 2014
-
Pile Foundations General - .1 Equipment information
By Bengt H. Fellenius
.1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1
Jan 1, 1991
-
Pile Foundations In Liquefiable Soils - A Case Study - Synopsis
By R. K. M. Bhandari
Geotechnical investigation for a LPG plant located in Assam state - an area of high seisimicty - revealed a layer of loose to medium silty sand susceptible to liquefaction at some depth below the fini
Jan 1, 1996
-
Pile Inspector's Guide To Hammers ? Introduction
The pile inspector is a critical element in the quality control process necessary for a successful pile installation project. This guide is intended to provide the inspector with a basic understanding
Jan 1, 1995
-
Pile Installation Overcomes Numerous Problems At Rocket Motor Component Manufacturing Facility - Introduction
By Jon H. Gould
This paper describes the following at the new Advanced Solid Rocket Motor (ASRM) nozzle manufacturing facility, which is being constructed inside an existing manufacturing facility: 1) generalized sub
Jan 1, 1992
-
Pile Installation Recorder Tests For ACIP/CFA Piles - Introduction
By Garland Likins
The Texas Department of Transportation, now considering using Augered Cast-In-Place (ACIP) Piles (also known as Continuous-Flight-Auger or CFA Piles) in their foundations, awarded a research project t
Jan 1, 1998
-
Pile Integrity Testing In The Netherlands
By Peter Middendorp
Pile foundations are widely applied in the Netherlands because of the soft soil conditions. One of the popular pile types are cast-in-situ piles, which have to be integrity tested to get accepted. Int
Jan 1, 2006
-
Pile Lateral Behaviour under Full Scale Lateral Load Tests in Thick Compacted Marine Carbonate Sand Fill of an Artifical Island
By Challa Venkata Rami Reddy, Anindya Roy, G. R. Konni
This paper presents the results of pile lateral capacities obtained from both conventional design and fullscale pile lateral load tests. Conventional design using P-Y curve analysis is very commonly b
Sep 8, 2021
-
Pile Load Test On 1200 Mm Dia Pile In Cemented Soil - Synopsis:
By B. Ramanathan
The results of a pile load test on a 1200 mm dia and 25 m long bored Cast-in-situ pile in soft rock is reported. The subsoil has a high N value of above 60 from 7 m to 21 m. The soft rock was observed
Jan 1, 1996
-
Pile Load Test Results For Highway 280 Pile Uplift Test Site
By Douglas Brittsan
This paper presents pile tension and compression load test results for the Southern Freeway Viaduct (North) pile load test site. The testing program represents a collaboration between California Depar
Jan 1, 1993
-
Pile Load Test Results Using The New Statnamic Method
By Matthew Janes
Quality control procedures are increasingly important with today's higher capacity foundations and complex loading conditions. The need for a mobile, repeatable, nondestructive and economical loa
Jan 1, 1990
-
Pile Load Testing At JFK International Airport - Synopsis
By J. Moskowitz
Construction of the new JFK International Airport Light Rail System (LRS) began in 1998 with a pre-construction load test program. This $1.2 billion design-build project consists of approximately 13 k
Jan 1, 2000