Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Comparing The Bench Test and Field Test Results for the Deep Mixing at the Rio Puerto Nuevo Project in San Juan, PRBy Filippo Maria Leoni, Wesley Schmutzler
"Deep Mixing Method (DMM) for the Rio Puerto Nuevo Project in San Juan was chosen by the Corps of Engineers to improve the soils adjacent to a 90 inch forced sewer main relocation and to improve the s
Jan 1, 2015
-
Comparison of 2D and 3D Anchor Analysis MethodologiesBy Ruth McKeown, Gilson de F. N. Gitirana, Murray Fredlund, HaiHua Lu
The current design standards for the use of anchors in slopes is based on two-dimensional (2D) limit equilibrium analyses. Anchors are considered as discrete loads and the 2D anchor, factored based on
Jan 1, 2019
-
Comparison of LRFD Resistance Factors to Tension Pile Load TestsBy Seth H. Hamblin, John E. Regan, Dimitrios Palantzas
"Through reliability-based calibration of larger pile load test databases, recent developments of the Load Resistance Factor Design (LRFD) methods, which include geotechnical load and resistance facto
Jan 1, 2015
-
Comparison of Non-Destructive Integrity Tests on Experimental Drilled ShaftsBy Armin W. Stuedlein, Jim Zammataro, Bernie Hertlein, Daniel Belardo, Qiang Li, Antonio Marinucci
"An experimental program focusing on four drilled shafts was conducted to determine the effect of high strength steel reinforcement bars on lateral resistance, steel casing on axial and lateral resist
Jan 1, 2016
-
Comparison of Numerical Predictions Using P-Y Curves and Finite Element Analyses of Monopiles of Ocean Energy Converters under a Very Large Number of Low Amplitude Lateral Load CyclesBy Deepak Pappusetty, Miguel A. Pando
This study is motivated from the increased interest in recent years to explore use of Ocean Energy Converters (OEC’s).OEC’s can be tidal or generate electricity from wave or current action. Design of
Jan 1, 2015
-
Comparison of the Pre-Construction and Production QC Test Results for the Sela-22 Elliptical Jet Grouting Project (New Orleans, LA)By Filippo Maria Leoni, Alessandro Bertero, Gianluca Pianezze
"As part of the Southeast Louisiana (SELA) drainage program, designed by the U.S. Army Corps of Engineers (USACE) to reduce flood damages in the City of New Orleans and surrounding parishes through th
Jan 1, 2016
-
Completely Automatized Recognition of the Installation Process in Special Foundation ConstructionBy Christian Hoyme, Jochen Maurer, Hans Regler
Up to today, it has been very difficult to obtain qualitative and quantitative information about the status and production process of a construction site. It is becoming more and more important to be
Sep 8, 2021
-
Concrete Filled Steel Tubes for Deep Foundations of Transportation StructuresBy Charles Roeder, Amy Leland, Dawn E. Lehman
Concrete filled steel tubes (CFSTs) are composite members that are commonly used in many countries today. CFST components are used in the United States, but they are more common in Asia, in part becau
Jan 1, 2019
-
Constructing Tsunami Walls with Pressed-In Sheet and Pipe Pile Combi-WallsBy Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
The city of Naruto in the southwestern part of Japan is situated at the mouth of the mighty Yoshino River. An approximately 1,000m-long levee/bulkhead along one of the river’s tributaries in the city
Sep 8, 2021
-
Construction Methods and Quality Outcomes for Bored Cast-in-Situ Piles – A Review of Current PracticeBy Jim Slatter, Ben Collingwood
"It is well known that the adoption of an appropriate construction methodology is critical to quality outcomes for bored piles (drilled shafts). Many case studies have been published documenting quali
Jan 1, 1900
-
Construction of a Deep Slurry Cutoff Wall for the Sacramento River East Levee ProgramBy Louay Owaidat, Daniel Jabbour, Allan Frappier, Jose Gomez, Mark Stanley, Tino Maestas
The U.S. Army Corps of Engineers (USACE) is implementing a levee strengthening program along the Sacramento River East Levee (SREL) designed to correct 11 miles of deficient levees as identified by re
Sep 8, 2021
-
Construction of a Deep Soil Mixed Cut-Off and Retaining Wall in Richmond BCBy Keith MacKay, John Carter, David Siddle, Fernando Faminia
"The River Green Residential development, is located in the municipality of Richmond, BC adjacent to the Fraser River. Ground conditions at the site consisted of medium to fine grained alluvial sands
Jan 1, 2016
-
Construction Of A Spillwall In The Columbia RiverBy Francis B. Gularte
The Dalles Dam is located 192 miles upstream from the Columbia River?s mouth. As part of an effort to increase survival rates for young salmon migrating downstream to the Pacific Ocean, a river spillw
Jan 1, 2010
-
Construction of High Road Embankment over Thick Soft Silty Clay- A Case StudyBy R. Radhakrishnan, C. Gunasekaran
"Calicut Bypass Phase-II project included construction of 7 m high embankment over soft compressible clays up to 18 m in thickness. Approx 1.5 km length of road out of a total 5 km length consisted of
Jan 1, 2015
-
Construction Of The Drilled Shaft Foundations For The Huey Long Mississippi River Bridge, New OrleansBy Dan A. Brown
The foundations at the Huey P. Long Bridge in New Orleans presented special challenges for construction due to the requirements for very deep drilled shafts in the Mississippi River beneath the existi
Jan 1, 2010
-
Construction Of Two Microtunnel Access Shafts Using The Cutter Soil Mix (CSM) Method In The San Joaquin Delta, CaliforniaBy Eric S. Lindquist
Two microtunnel access shafts were constructed using the Cutter Soil Mixing (CSM) method in the San Joaquin Delta region of California, east of San Francisco. Unlike conventional slurry walls and diap
Jan 1, 2010
-
Construction-Induced Vibrations And Green Concrete: Literature Review And Case HistoryBy William M. Camp
Construction-induced earthborn vibrations have long been recognized as a potential problem with respect to the constructed environment and various vibration criteria are in use to prevent damage. A s
Jan 1, 2010
-
Consultants Can Be Safe, Too – A Collaborative ApproachBy Brian FitzPatrick, Michael J. Weaver
Everyone has a role in site safety, even consultants. This paper presents a summary of how a geotechnical and environmental consulting firm, with field staff on construction and subsurface exploration
Jan 1, 2019
-
Controlling Thermal Stresses in Barrier WallsBy Karsten Beckhaus
Barrier walls in levees and dams are designed and constructed for new structures and for rehabilitation or upgrade of existing structures to control seepage. Construction methods applied are often dee
Sep 8, 2021
-
Cost and Technical Comparison of Non-Destructive Test Methods for Drilled ShaftsBy Ronnie Melker, Joel Webster, Daniel Belardo, Thomas Hyatt
Quality assurance of drilled shafts is highly dependent upon the construction practices used during the excavation and concrete placement process. When performed under slurry, challenges are presented
Jan 1, 2019